1 A.Hamdi CEA/IRFU/SACM 5th CWRF workshop, march 2008, Geneva CEA-SACLAY HIGH VOLTAGE MODULATOR FOR PULSED KLYSTRONS CEA Saclay RF teststand MODULATOR.

Slides:



Advertisements
Similar presentations
11/27/2007ILC Power and Cooling VM Workshop Mike Neubauer 1 RF Power and Cooling Requirements Overview from “Main Linac Power and Cooling Information”
Advertisements

Lorentz force detuning measurements on the CEA cavity
Areal RF Station A. Vardanyan RF System The AREAL RF system will consist of 3 RF stations: Each RF station has a 1 klystron, and HV modulator,
Areal RF Station A. Vardanyan RF System The AREAL RF system will consist of 3 RF stations: Each RF station has a 1 klystron, and HV modulator,
Juliette PLOUIN – CEA/SaclayCARE’08, 3 December /21 Superconducting Cavity activities within HIPPI CARE ‘08 CERN, 2-5 December 2008 Juliette PLOUIN.
MICE Refurbishment of CERN RF equipment for MICE M. Vretenar, CERN AB/RF.
بسم الله الرحمن الرحیم MODULATOR & POWER SUPPLY FOR HIGH POWER MICROWAVE TUBE IN LINAC ACCELERATOR.
RF systems for MICE Andrew Moss The MICE RF Group and the TIARA WP7 Team Contributions include Daresbury, RAL, CERN, LBNL, LANL, FNAL, Strathclyde & Sheffield.
MuCool RF Status MICE Collaboration Meeting June 7-10, 2006, Fermilab A. Moretti June 9, 2006.
DESIGN OF A HIGH POWER TEST STAND FOR ESS SPOKE CAVITIES
DC Power Sources for the High Power RF Amplifiers By Rolf Wedberg Review ESS Spoke RF Source 11 – 12 December 2012.
Development of Solid State Long Pulse Klystron Modulators
CERN 29 Jan 2008 Power Converters for Linac 4 - Carlos A. Martins1 Power Converters for Linac 4 2 Hz) Carlos A. MARTINS Accelerators and Beams (AB)
Digital measurement system for the LHC klystron high voltage modulator D. Valuch, A. Mikkelsen, G. Ravida, O. Brunner.
SLHC-PP – WP7 Critical Components for Injector Upgrade Plasma Generator – CERN, DESY, STFC-RAL Linac4 2MHz RF source Thermal Modeling Gas Measurement and.
Front End Test Stand Klystron Commissioning Alan Letchford UKNF Plenary Meeting 22 nd April 2009.
Superconducting Accelerating Cryo-Module Tests at DESY International Workshop on Linear Colliders 2010 (ECFA-CLIC-ILC Joint Meeting) Denis Kostin, MHF-SL,
Thales Components & Subsystems
RF Distribution Alternatives R.A.Yogi & FREIA group Uppsala University.
RF power & FPC status Eric Montesinos, CERN BE-RF on behalf of all people involved, great thanks to all of them !
High Power RF Systems, Control and Distribution in the HINS Alfred Moretti, Brian Chase, Chris Jensen and Peter Prieto Fermilab Accelerator Advisory Committee.
David Regidor, Moisés Weber (CIEMAT, Madrid, Spain) The IFMIF-EVEDA Accelerator Prototype will be a 9MeV, 125mA CW deuteron accelerator to validate the.
February 17-18, 2010 R&D ERL Alex Zaltsman R&D ERL High Power RF Systems Alex Zaltsman February 17-18, 2010 High Power RF Systems.
RF Sources and Combiners Emma Wooldridge. 28th-29th April 2004Joint Accelerator Workshop Outline Very quick RF power overview RF power sources –Triodes.
RF Development for ESS Roger Ruber and Volker Ziemann Uppsala Universitet 4 Dec Dec-20091RR+VZ: ESS RF Development.
Anders Sunesson RF Group ESS Accelerator Division
Power Supply System for DRFS
RF system issues due to pulsed beam in ILC DR October 20, Belomestnykh, RF for pulsed beam ILC DR, IWLC2010 S. Belomestnykh Cornell University.
Modulator and overmoded RF components status for the 12GHz Test Stand at CERN - RF meeting – 17/03/2010.
Proton Driver Main Linac Parameter Optimization G. W. Foster Proton Driver General Meeting Jan 19, 2005.
Linac RF Source Recommendations for Items 22,23,24,46,47 Chris Adolphsen.
Ding Sun and David Wildman Fermilab Accelerator Advisory Committee
Kévin Pepitone 1CLIC project meeting, CERN, December 1st, 2015 Kevin PEPITONE, BE-RF Drive Beam Injector Gun.
RF scheme of electron linear accelerator with energy MeV Levichev A.E. Budker Institute of Nuclear Physics SB RAS.
Development of The Klystrons for J-PARC Project
Renovation of the 200 MHz RF system LLRF issues. Cavities redistribution 26 October th LIU-SPS Coordination Meeting 2  2011 : 4 cavities 2 x 4.
12 GHz Stand alone power source. Provisional Klystron Parameters ParametersSpecificationsunitsObservations RF Frequency12 (11.4)GHz Peak RF power50 -75MW.
ALBA RF Amplifiers based on IOTs CWRF08 - CERN, March 2008 Michel Langlois & Paco Sanchez 1 Michel Langlois & Paco Sanchez.
Comparison of Fermilab Proton Driver to Suggested Energy Amplifier Linac Bob Webber April 13, 2007.
A 350 MHz, 200 kW CW, Multiple Beam IOT Lawrence Ives, Michael Read, David Marsden, R. H. Jackson, Thuc Bui Calabazas Creek Research, Saratoga, CA. USA.
CW and High Average Power Workshop BNL The Diamond Storage Ring IOT based High Power Amplifier Morten Jensen on behalf of the SR RF Group.
Status of the 1.2 MW MB-IOT for ESS Morten Jensen CLIC Workshop 2016, January, CERN.
FREIA: HIGH POWER TEST STAND Rutambhara Yogi & FREIA Group ESS RF Group Unit Leader for Spoke Power and RF Distribution FREIA Group Unit Leader, Uppsala.
650 MHz Solid State RF Power development at RRCAT
ALBA RF Systems Francis Perez.
June 16, 2015 CLIC WORKSHOP JANUARY 18 – 22, 2016 OPTIMIZED RF UNIT I 1 January 21, 2016 By: Mikael Lindholm.
New prototype modulator for the European XFEL Project (DESY) Pulse Step Modulator (PSM) Technology for long pulse applications.
High Voltage modulators ESS developments Carlos A. Martins ESS Accelerator Division, RF electrical power systems.
High-efficiency L-band klystron development for the CLIC Drive Beam High-efficiency L-band klystron development for the CLIC Drive Beam CLIC workshop,
Linac RF System Design Options Y. Kang RAD/SNS/NScD/ORNL Project – X Collaboration Meeting April , 2011.
High Power RF Systems for 2-8 GeV Fast Cycling Synchrotron PROJECT X (ICD-2) John Reid September 11, 2009.
CERN LHC RF Power Systems
Areal RF Station A. Vardanyan
ILC Power and Cooling VM Workshop
Solid State Amplifier Development at PSI
High efficiency work and MBK development for accelerators
Development of high-power IOTs as an efficient alternative to klystrons Morten Jensen Energy for Sustainable Science 24 October 2013, CERN.
RF Sources and Combiners
A frequency choice for the SPL machine: Impact on hardware
Construction and Commissioning of Electronic Test Benches
Overview High-Powered Amplifier Exciter Receiver Oscillators
Application of the moderate peak power (6 MW) X-band klystron’s cluster for the CLIC accelerating structures testing program. I. Syratchev.
12 GHz High Power RF components requirements for CEA activities
PS System for DRFS PS System for Diode-type klystrons
BEPCII RF POWER SOURCE AND INPUT COUPLER
IFMIF-EVEDA RF POWER SYSTEM
Klystron Power Supplies for ILC
CEPC RF Power Sources System
CEPC 650MHz High Efficiency Klystron R&D
RF system for MEIC Ion Linac: SRF and Warm Options
Presentation transcript:

1 A.Hamdi CEA/IRFU/SACM 5th CWRF workshop, march 2008, Geneva CEA-SACLAY HIGH VOLTAGE MODULATOR FOR PULSED KLYSTRONS CEA Saclay RF teststand MODULATOR first design HV and RF tests with the first design MODULATOR new design HV and RF tests with the new design Conclusions

2 A.Hamdi CEA/IRFU/SACM 5th CWRF workshop, march 2008, Geneva CEA Saclay RF teststand Movement of the whole SEA (Service d’Etude des Accélérateurs) infrastructures from l’Orme des merisiers to Saclay center New power supply (300KVA), new cooling etc… and their comissioning

3 A.Hamdi CEA/IRFU/SACM 5th CWRF workshop, march 2008, Geneva CEA Saclay RF teststand : the goal

4 A.Hamdi CEA/IRFU/SACM 5th CWRF workshop, march 2008, Geneva

5 Modulator first design : CEA 1300MHz Test Stand  1995 : First design at low duty cycle ( 1ms, 0.1 Hz ) for HPPP conditioning of SRF cavities  improvement of maximum accel. Gradient  1999 : new design to get 1ms 10Hz pulse for High power tests of Main Power Coupler parts  R&D of RF windows and waveguide to coax transitions Coupler RF Power Test Stand Parameters  Frequency : 1300 MHz  peak RF power : 2 MW  pulse length : 1 ms  repetition rate : 10 Hz RF source : TH2086 THOMSON klystron 90kV 60A Drive power 100W max heater 18V 22A focusing coil 16A 150V max ion pump 5kV 30W max

6 A.Hamdi CEA/IRFU/SACM 5th CWRF workshop, march 2008, Geneva Modulator first design : simple principle HVPS C R L Klystron

7 A.Hamdi CEA/IRFU/SACM 5th CWRF workshop, march 2008, Geneva Modulator first design : simple but… 300H choke to limit di/dt during 1ms on HVPS 2 modes : - 1 ms 91 kV 60 A - 2 ms 56 kV 31 A 2 HV dividers : 10kV/V 1 toroid in the tetrode cathode (ground) : 30A/V Tetrode selfbiased Tetrode current driven by IGBT HV feedback T=0T=1ms 60A Klystron current 16kV T=0T=1ms 110kV 4kV Limitation Resistors : 3kV Klystron : 91kV Tetrode Anode Voltage

8 A.Hamdi CEA/IRFU/SACM 5th CWRF workshop, march 2008, Geneva

9 Length x width x height : 2300mm x 1550mm x 1560mm Oil volume : 4500 liters MOBILECT 35 CP ( J/g/°C )= 1.84 Density ( g/Cm3 ) = 0.87 K ( W/m/°C ) = 0.14 Viscosity ( mm2/s) = 0°C, 40°C, 100°C Expension coeff ( /°C ) = 7.5 E-4 Epsilonr = 25°C

10 A.Hamdi CEA/IRFU/SACM 5th CWRF workshop, march 2008, Geneva Modulator first design

11 A.Hamdi CEA/IRFU/SACM 5th CWRF workshop, march 2008, Geneva

12 A.Hamdi CEA/IRFU/SACM 5th CWRF workshop, march 2008, Geneva EIMAC TETRODE 4CPW100KA characteristics Maximum ratings / ( 1ms 10Hz modulator operation ) Max DC anode voltage : 110kV / ( 110 ) Max anode dissipation : 100kW / ( 6 ) Max screen dissipation : 1750W / ( 10 ) Max grid dissipation : 500W / ( 0 ) Max DC cathode current : 16A / ( 0.6 ) Max peak cathode current : 140A / ( 60 ) Net weight : 22.7kg Filament voltage : 15.5V +/- 0.75V Filament current : 15.5V Anode Dissipation kW Minimum Water flow L / mn Pressure Drop bar Tetrode Anode : 6kW Limitation Resistors : 1.8kW 300H Choke : 1.2kW Tetrode Heater : 3.4kW Average 1ms 10Hz Oil T° = kW average dissipation

13 A.Hamdi CEA/IRFU/SACM 5th CWRF workshop, march 2008, Geneva Modulator first design : 1300 MHz scope curves

14 A.Hamdi CEA/IRFU/SACM 5th CWRF workshop, march 2008, Geneva Modulator first design : RF tests TH2086 Klystron AMPLIFIER( THALES ) Main Parameters  2 MW 1300MHz  Pulse Operation ( 1ms pulse width, 10Hz repetition rate, 1% duty cycle )  40% efficiency ( Losses = 650 kW Collector + 13 kW Body )  86 kV 55A  53 dB RF Gain ( 10W Input 2000 kW Output Power )  20 -1dB Bandwidth Output RF Power ( MW ) Vkly ( kV ) Output Power ( MW ) 86 kV 55A Drive Power ( W ) Output Power ( MW )

15 A.Hamdi CEA/IRFU/SACM 5th CWRF workshop, march 2008, Geneva Modulator new design : goal In the frame of the CARE/HIPPI programme, CEA-Saclay built and ordered the necessary RF equipments to make a platform for high power tests in a cryogenic environment available. Only few similar platforms are existing in Europe (at CERN for tests at 352 and 400 MHz, at DESY and BESSY for tests at 1300 MHz) but not any was equipped to perform RF power tests at 704 MHz. This RF frequency was chosen in the reference design of the CERN-SPL-II [1] for the medium and high energy parts of the superconducting linac HIPPI RF Power Test Stand Parameters  Frequency : 704 MHz  peak RF power : 1 MW  pulse length : 2 ms  repetition rate : 50 Hz  Average power : 100 kW In 2005, one existing source  klystron CPI VPK-7952A

16 A.Hamdi CEA/IRFU/SACM 5th CWRF workshop, march 2008, Geneva Existing RF source

17 A.Hamdi CEA/IRFU/SACM 5th CWRF workshop, march 2008, Geneva Modulator new design : principle Klystron

18 A.Hamdi CEA/IRFU/SACM 5th CWRF workshop, march 2008, Geneva Klystron current T=0T=2ms Limitation Resistors : 1kV Klystron : 95kV 110kV 14kV 4kV T=0T=2ms 20A Tetrode Anode Voltage Modulator new design : schematics Tetrode Anode : 22.5kW Limitation resistors : 3.2kW Tetrode Heater : 3.4 kW Average 2ms 50Hz

19 A.Hamdi CEA/IRFU/SACM 5th CWRF workshop, march 2008, Geneva

20 A.Hamdi CEA/IRFU/SACM 5th CWRF workshop, march 2008, Geneva Some improvements :  new mechanical frame to remove easily the electronics out of the oil tank,  modulator is hanged to avoid fast paint deterioration  new receptacle for the differential HVPS,  new oil cooling system to sustain the full duty cycle,  control window. Modulator new design

21 A.Hamdi CEA/IRFU/SACM 5th CWRF workshop, march 2008, Geneva Modulator new design

22 A.Hamdi CEA/IRFU/SACM 5th CWRF workshop, march 2008, Geneva EIMAC TETRODE 4CPW100KA Maximum Ratings / ( 2ms 50Hz modulator operation )  Max DC anode voltage : 110kV / ( 110 )  Max anode dissipation : 100kW / ( 22.5 )  Max screen dissipation : 1750W / ( 0 )  Max grid dissipation : 500W / ( 0 )  Max DC cathode current : 16A / ( 2.5 )  Max peak cathode current : 140A / ( 20 ) Anode Dissipation kW Minimum Water flow L / mn Pressure Drop bar

23 A.Hamdi CEA/IRFU/SACM 5th CWRF workshop, march 2008, Geneva The klystron phase shift is about 10°/kV at 92kV gun voltage. The undershoot appearing when zooming the klystron current signal trace is due to the parasitic capacitor of the 3 -7m each - HV cables(3nF) and 100pF heater transformer. To reduce this effect, we could reduce the HV cable length. This imply also to increase the threshold on the Ikly interlock to about >24A. Modulator new design : 704 MHz scope curves The HV ripple is lower than 100V from t=0 to 300µs, and lower than 10V for t>300µs.

24 A.Hamdi CEA/IRFU/SACM 5th CWRF workshop, march 2008, Geneva Modulator new design : HV tests on klystron in diode mode Current and Voltage modulator output vs. tetrode screen grid voltage with V(anode_tetrode)=5kV and V(gate_IGBT)=25V In order to safely increase the duty cycle up to 10%, great care must be taken to avoid an excess of dissipating power in the tetrode and the IGBT: The tetrode screen grid voltage has to be carefully optimized. After preliminary measurements, the nominal current and voltage values required for generation of a 1 MW pulse at the klystron output have been reached with appropriate settings of the tetrode screen grid voltage. The first tests of the klystron cathode have shown that the current density from the cathode is stable when HV is increased, which is characterized by the constant microperveance

25 A.Hamdi CEA/IRFU/SACM 5th CWRF workshop, march 2008, Geneva Modulator new design : RF tests 1 MW 704MHz  Pulse Operation : 2ms pulse width, 50Hz repetition rate, 10% Duty Cycle  66% efficiency ( Losses = 500 kW Collector + 13 kW Body )  92 kV 17A  49 dB RF Gain ( 13W Input 1 MW Output Power )  4 -1dB Bandwidth

26 A.Hamdi CEA/IRFU/SACM 5th CWRF workshop, march 2008, Geneva Summary of Modifications  modulator tank : oil cooling connections one more HV feedthrough Limitation resistors dissipation upgrade 300H choke removal  new High Voltage Power Supply with two poles isolated at full rated voltage  auxiliary power supplies : klystron focusing coils klystron ion pump klystron heater interlocks  klystron water cooling

27 A.Hamdi CEA/IRFU/SACM 5th CWRF workshop, march 2008, Geneva Modulator efficiency comparison Modulator efficiency : for 55A, 1.1ms 10Hz, with a Tetrode voltage=12.1kV, (55A*1.1ms/5uF=12.1kV), The dissipated power is 7.74kW For 90kV*55A*1.1ms*10Hz = 54.5kW HV Hence an efficiency of 54.5/( ) = 83% Modulator first design : Modulator efficiency : for 20A, 2.1ms 50Hz, with a Tetrode voltage=12.1kV, (20A*2.1ms/5uF=8.4kV), The dissipated power is 19.3kW For 90kV*20A*2.1ms*10Hz = 189kW HV Hence an efficiency of 189/( ) = 89% Modulator new design :

28 A.Hamdi CEA/IRFU/SACM 5th CWRF workshop, march 2008, Geneva Conclusions  The new 110kV 2.5A HVPS is the most expensive part of the HV modifications : 80K€  The modulator has been modified successfully but still some “infant” problems to solve with the HVPS nevertheless efficiency is better even if it wasn’t the first goal.  The modifications took account the shared operation of the two RF sources, 704 MHz and 1300MHz, with a short dead time (couple hours estimated)  Measurements performed on the klystron VKP7952C show that the specifications (HV and RF power levels and duty cycle) have been met.  150kW Circulator under commissioning  next step 1 : HIPPI power coupler conditioning and  next step 2 : 704MHz HIPPI superconducting cavity with its power coupler  next step 3 : Retstart of the 1300Mhz source for SRF program (piezo tuner R&D, LFD)

29 A.Hamdi CEA/IRFU/SACM 5th CWRF workshop, march 2008, Geneva Elliptical Cavity A and B Cavity A, ready to be integrated in the CryHoLab environment for tests at Saclay. Cavity B, delivered in march 07 at Saclay, has been measured (frequency, bead pull) and it is now ready to be integrated in the CryHoLab environment.

30 A.Hamdi CEA/IRFU/SACM 5th CWRF workshop, march 2008, Geneva

31 A.Hamdi CEA/IRFU/SACM 5th CWRF workshop, march 2008, Geneva Acknowledgements

32 A.Hamdi CEA/IRFU/SACM 5th CWRF workshop, march 2008, Geneva References M. Desmons, “Cryholab modulator modifications for HIPPI 704MHz 1MW pulsed RF source”, HIPPI -WP3 meeting - march 2005, LASA / INFN – Milan S. Chel, M. Desmons, A. Hamdi, J.-F. Denis, F. Ballester, D. Roudier, G. Monnereau, G. Bourdelle, “1MW MHz RF test stand at CEA-Saclay”, CARE deliverable November 2007 G. Devanz, “HIPPI 704 MHz Power Coupler” - HIPPI WP3/5 meeting Juelich 27 Apr 06

33 A.Hamdi CEA/IRFU/SACM 5th CWRF workshop, march 2008, Geneva Merci de votre attention! Questions in French or Moroccan please? Vielen Danke ! Thank you !