(Workshop on Level 2 PSA and Severe Accident Management, March 2004 ) 1 International Workshop On Level 2 PSA and Severe Accident Management Hosted by:

Slides:



Advertisements
Similar presentations
ENTITIES FOR A UN SYSTEM EVALUATION FRAMEWORK 17th MEETING OF SENIOR FELLOWSHIP OFFICERS OF THE UNITED NATIONS SYSTEM AND HOST COUNTRY AGENCIES BY DAVIDE.
Advertisements

“Regulatory Risk-Informed Activities and Supporting PRA Technical Acceptability” Presented to Nuclear Energy Standards Coordination Collaborative (NESCC)
RISK INFORMED APPROACHES FOR PLANT LIFE MANAGEMENT: REGULATORY AND INDUSTRY PERSPECTIVES Björn Wahlström.
PSAEA – CNRA Conference on OEF (Köln, 29-31/05/2006) The relationship between risk analysis and event analysis – PSA based Event Analysis P. De Gelder.
Sustainable Energy Systems Int’l H 2 Safety Conf, Pisa, Italy, 8-10 Sep IPHE projects focus on pre-competitive collaborative research, development.
IAEA International Atomic Energy Agency Lessons Learned from the Tailored IRRS Module on Regulatory Implications of the Fukushima Accident Presentation.
EEN [Canada] Forum Shelley Borys Director, Evaluation September 30, 2010 Developing Evaluation Capacity.
IAEA International Atomic Energy Agency Human Resources Development for Nuclear Safety J. Bastos NSNI/RAS.
Internal Auditing and Outsourcing
GEOSAF-Meeting F. Boissier, S. Voinis, S. Barlow Operational Safety- IGSC Expert Group on Operational Safety (EG-OS) DMR/DIR/ May 2014, Vienna.
Definition, Role and Documentation of the Safety Case: Quick Review
Slide No. 1 IAEA Developed by NSNI Division, IAEA under the supervision of Mr. Marco Gasparini (PNRA supported in the development under TC-Project PAK/09/028)
Audit objectives, Planning The Audit
A Proposed Risk Management Regulatory Framework Commissioner George Apostolakis Presented at the Organization of Agreement States 2012 Annual Meeting Milwaukee,
VTT-STUK assessment method for safety evaluation of safety-critical computer based systems - application in BE-SECBS project.
Module N° 8 – SSP implementation plan. SSP – A structured approach Module 2 Basic safety management concepts Module 2 Basic safety management concepts.
Ensuring Food Safety in Europe through Scientific Cooperation and Networking The Role of EFSA Carola Sondermann EFSA Polish Focal Point – Annual Experts.
Segment SCD 4.3 Module SCD 4: Safety Case Segment SCD 4.3 Documentation and use of the safety case.
A Review of the Standing Committee of Caribbean Statisticians (SCCS) as a Mechanism for Statistical Development and Harmonisation The Second Meeting of.
LESSONS LEARNED IN DEVELOPMENT OF SAFETY CULTURE FOR REGULATORY BODIES
IAEA International Atomic Energy Agency Presentation held at the Workshop on Lessons Learned from IRRS Missions Moscow, Russian Federation 9-11 December.
International Working Forum for Regulatory Supervision of Legacy Sites (RSLS) Review of 2013 and Introduction of Next Steps of RSLS Malgorzata.
New Nuclear Build and Evolving Radiation Protection Challenges Dr. Ted Lazo Deputy Head for Radiation Protection Division of Radiation Protection and Radioactive.
Presenter’s Name June 17, Directions for this Template  Use the Slide Master to make universal changes to the presentation, including inserting.
IAEA International Atomic Energy Agency Summary and Overview of TECDOC Russel Edge Decommissioning and Remediation Unit Division of Radiation,Transport.
Project Management Learning Program 7-18 May 2012, Mekong Institute, Khon Kaen, Thailand Writing Project Report Multi-Purpose Reporting.
Main Requirements on Different Stages of the Licensing Process for New Nuclear Facilities Module 4.5/1 Design Geoff Vaughan University of Central Lancashire,
Workshop on Implementing Audit Quality Practices Working Group on Audit Manuals and Methods March 2006 Vilnius (Lithuania) Hungarian Experiences.
IGD-TP Pilot Project on Operational and Construction Safety Status May 2014.
Specific Safety Requirements on Safety Assessment and Safety Cases for Predisposal Management of Radioactive Waste – GSR Part 5.
IAEA International Atomic Energy Agency Methodology and Responsibilities for Periodic Safety Review for Research Reactors William Kennedy Research Reactor.
IAEA International Atomic Energy Agency IAEA Safety Standards for Research Reactors W. Kennedy Research Reactor Safety Section Division of Nuclear Installation.
International Atomic Energy Agency Irina Sanda Education and Training in the Area of Safety Assessment Irina Sanda Safety Assessment Section Division of.
International Atomic Energy Agency M. El-Shanawany IAEA Technical Support & Capacity Building Programme M. El-Shanawany Department of Nuclear Safety &
P1. Overview of Objectives & Agenda of Technical Meeting
IAEA International Atomic Energy Agency The IAEA Integrated Regulatory Review Service (IRRS) IRRS Missions : Analysis from a Radiation Safety.
IAEA International Atomic Energy Agency LESSONS LEARNED ON THE REGULATION OF NUCLEAR SAFETY Presentation to the Workshop on Lessons Learned from IRRS Missions.
National Nuclear Regulatory Portal (NNRP) (Concept, Development and Experience) FNRBA Training Course on Knowledge Safety Networks, 14–18 October 2013,
23 January 2016 Gustavo C ARUSO Head, Regulatory Activities Section Division of Nuclear Installations Safety Department of Nuclear Safety and Security.
Ensuring the Safety of Future Developments
IAEA International Atomic Energy Agency The IAEA Integrated Regulatory Review Service (IRRS) IRRS Missions : Overview from a Radiation Safety.
1 Safety factors for periodic safety review for research reactors Group A: SF1 – SF4.
The CNCAN Knowledge Portal TM on the Use of GSAN and SAET Programme November 2015 ROMANIA National Commission for Nuclear Activities Control.
IAEA Training Course on Safety Assessment of NPPs to Assist Decision Making Diablo Canyon NPP Probabilistic Risk Assessment Program Workshop Information.
IAEA Training Course on Safety Assessment of NPPs to Assist Decision Making Overview of Risk Informed Inspection Workshop Information IAEA Workshop City,
IAEA International Atomic Energy Agency New IAEA Safety Guide (information) Human Factor Engineering for NPP (DS492) Alexander Duchac SAS,NSNI.
IAEA International Atomic Energy Agency Monika Kinker Radioactive Waste and Spent Fuel Management Unit Division of Radiation, Transport and Waste Safety.
IAEA International Atomic Energy Agency Technical Meeting on Regulatory Oversight of Human and Organizational Factors Vienna, Austria | December.
IAEA Training Course on Safety Assessment of NPPs to Assist Decision Making Workshop Information IAEA Workshop Safety Assessment Process. Plant Modification.
IAEA International Atomic Energy Agency Development of the Basis Document for Periodic Safety Review for Research Reactors William Kennedy Research Reactor.
Low Power and Shutdown PSA IAEA Training Course on Safety Assessment of NPPs to Assist Decision Making Workshop Information IAEA Workshop City, Country.
Adding value through knowledge © NNC Limited OECD_L2PSA_review/mla/dmj/02040.ppt OECD/NEA International Workshop on L2 PSA and SAM, 29 th -31 st March.
2-6 November 2015 Lisbon, Portugal Regional Meeting on Applications of the Code of Conduct on Safety of RR's 1 Some aspects of the Code of Conduct on the.
IAEA Training Course on Safety Assessment of NPPs to Assist Decision Making Diablo Canyon NPP Maintenance Rule Program Workshop Information IAEA Workshop.
Risk Assessment: A Practical Guide to Assessing Operational Risk
International Atomic Energy Agency Implementation of a Risk-Informed Approach into the Legislative and Regulatory Framework SNRCU Annual Topical Meeting.
Use and Conduct of Safety Analysis IAEA Training Course on Safety Assessment of NPPs to Assist Decission Making Workshop Information IAEA Workshop Lecturer.
EIAScreening6(Gajaseni, 2007)1 II. Scoping. EIAScreening6(Gajaseni, 2007)2 Scoping Definition: is a process of interaction between the interested public,
1 Introduction to safety case and safety assessment: purpose and content of safety case Ian Crossland Crossland Consulting
Best Practices in Performing DSA Legacy Reviews
International Topical Conferences on Nuclear Safety, IAEA, June 6-9, 2017, Vienna Workshop 2: An Introduction and Further Explanation on Design Extension.
Auditing & Investigations II
ARM Summary Report Template
Communication and Consultation with Interested Parties by the RB
Presentation to the EPREV Lessons Learned Workshop
CHEMICAL ACCIDENTS Programme
Regulatory Cooperation Forum (RCF) - Plenary 2018
Regulatory Oversight of HOF in Finland
Education and Training in the Area of Safety Assessment Irina Sanda
BWROG – Emergency Procedures and Severe Accident Guidelines (EPG/SAG) Revision 4 Highlights Ken Klass (Talen Energy), Lesa Hill (Southern Nuclear) & Phillip.
Presentation transcript:

(Workshop on Level 2 PSA and Severe Accident Management, March 2004 ) 1 International Workshop On Level 2 PSA and Severe Accident Management Hosted by: Gesellschaft für Anlagen- und Reaktorsicherheit (GRS) mbh, Köln, Germany 29th to the 31st of March 2004 Barry Kaufer, Deputy Head, Regulation Nuclear Safety Division Le Seine St.-Germain 12, boulevard des Iles Issy-les-Moulineaux, France

(Workshop on Level 2 PSA and Severe Accident Management, March 2004 ) 2 Table of contents u Safety and Regulation at OECD/NEA u Committee on the Safety of Nuclear Installations (CSNI) u Working Group on Risk Assessment (WGRisk) – Level 2 PSA –1997 State-of-the-Art Report –2004 Programme of Work u Summary

(Workshop on Level 2 PSA and Severe Accident Management, March 2004 ) 4

5 WGRisk u Over the past 24 years, PWG5 and now WGRisk have looked at the technology and methods used for identifying contributors to risk and assessing their importance. Work during the early part of this period was concentrated on Level 1 PSA methodology, but in recent years, the focus has shifted into specific PSA methodologies modelling issues and risk informed applications. During this long period WGRisk has produced over 40 technical reports, held over 25 international workshops and has issued several important consensus statements and opinion papers on specific aspects of PSA. u The main mission of the Working Group on Risk Assessment (WGRisk) is to advance the understanding and utilisation of Probabilistic Safety Assessment (PSA) in ensuring continued safety of nuclear installations and in improving the effectiveness of regulatory practices in Member countries. In pursuing this goal, the Working Group shall recognise the different methodologies for identifying contributors to risk and assessing their importance. While the Working Group shall continue to focus on the more mature PSA methodologies for Level 1, Level 2, internal, external, shutdown, etc. It shall also consider the applicability and maturity of PSA methods for considering evolving issues such as human reliability, software reliability, ageing issues, etc., as appropriate.

(Workshop on Level 2 PSA and Severe Accident Management, March 2004 ) 6

7

8 WGRisk – Level 2 PSA Discussion Outcomes u [1996] –In the early 1990’s, with the advent of increasing use of PSAs, a proposal was made at the 1993 PWG5 Annual meeting for future work in the area of Level 2 PSA. The main objective of the proposed task was to perform a state-of-the-art review of the methods available for performing level 2 PSAs and severe accident/source term uncertainty analyses for use in the regulatory process and the evaluation/implementation of severe accident management strategies. u [2002] –The reports from the experts and discussions within WGRisk show it is clear that if one were to use NUREG 1150 as a basis, experimental evidence over the past 10 years or more indicates that the perceptions of risk in Level 2 PSA has changed what may be considered significant. While it is not clear how the results would specifically change, the body of information that has been compiled would change the distributions that were used in NUREG Additionally, based on the national reports presented at WGRisk meetings many countries (Germany, Korea, Finland, France, Hungary, Czech Republic, Switzerland and Japan) are actively working on Level 2 PSA. Therefore the proposed workshop is considered is seen as beneficial to getting a better understanding of the current state-of-the-art.

(Workshop on Level 2 PSA and Severe Accident Management, March 2004 ) 9 WGRisk State-of-the-Art Report, 1997 u The report (Level 2 PSA Methodology and Severe Accident Management NEA/CSNI/R(1997)11) reviews and evaluates Level 2 PSA results and methodologies with respect to plant type specific and general insights u The report also looks at approaches and practices for using PSA results in the regulatory context and for supporting severe accident management programmes by input from Level 2 PSAs are examined. –The report is based on information contained in: v PSA procedure guides, PSA review guides and regulatory guides for the use of PSA results in risk-informed decision making, and v Plant specific PSAs and PSA related literature exemplifying specific procedures, methods analytical models, relevant input data and important results, use of computer codes and results of code calculations. The PSAs are evaluated with respect to results and insights. u Review of Report was performed in 2002 (next presentation)

(Workshop on Level 2 PSA and Severe Accident Management, March 2004 ) 10 Chapter 1 1. TASK DESCRIPTION AND WORKING METHODOLOGY –1.1 Background –1.2 Objective and Scope –1.3 Level 2 PSA methodologies –1.4 Accident management –1.5 OECD/NEA activities on accident management –1.6 OECD/NEA activities on severe accident phenomena –1.7 Structure of the report.

(Workshop on Level 2 PSA and Severe Accident Management, March 2004 ) 11 Chapter 2 2 RESULTS AND INSIGHTS FROM RECENT LEVEL 2 PSA –2.1 Examined PSAs and considered aspects –2.2 Objectives and scope of recent level-2 PSAs. –2.3 Plant characteristics influencing severe accident progression –2.4 Level 2 methodology and codes –2.5 Principal results, insights on containment failure modes and releases. –2.6 References

(Workshop on Level 2 PSA and Severe Accident Management, March 2004 ) 12 Chapter 3 3 KEY SEVERE ACCIDENT ISSUES –3.1 Key Severe Accident Phenomena. –3.2 Review of severe accident computer codes –3.3 Documentation of the Use of Severe Accident Computer Codes in Selected Level 2 PSAs for Nuclear

(Workshop on Level 2 PSA and Severe Accident Management, March 2004 ) 13 Chapter 4 u 4 SEVERE ACCIDENT MANAGEMENT –4.1 Background and Objectives –4.2 Evolution of an accident from the operators perspective –4.3 Safety objectives for the development of SAM Guidance –4.4 Examples of implemented provisions for mitigative SAM (level 2) and of their effectiveness –4.5 Identification of Recovery and SAM Actions in the Level 1 Domain that can influence SAM in the Level 2 Domain. Some Examples –4.6 References

(Workshop on Level 2 PSA and Severe Accident Management, March 2004 ) 14 Chapters 5 and 6 5 AVAILABLE METHODOLOGY FOR QUALITATIVE LEVEL 2 ANALYSIS –5.1 Level 1/2 Interface –5.2 Accident progression Event Trees –5.3 Modelling of human intervention 6 EVALUATION OF LEVEL 2 PSA MODELS AND QUANTIFICATION –6.1 Brief description of Methods –6.2 Use of Expert Judgement –6.3 Uncertainty Issue Quantification Technique

(Workshop on Level 2 PSA and Severe Accident Management, March 2004 ) 15 Chapter 7 u 7 INTEGRATED AND PSA INFORMED APPROACH TO DECISION MAKING –7.1 Introduction –7.2 Recent activities and publications related to risk informed decision making –7.3 Quality requirements for PSAs –7.4 National Positions on risk informed decision making. –7.5 Treatment of Uncertainties –7.6 Examples of risk informed decisions in the level 2 domain –7.7 Conclusions

(Workshop on Level 2 PSA and Severe Accident Management, March 2004 ) 16 Appendices APPENDIX A: SEVERE ACCIDENT COMPUTER CODES –A.1 Fully Integrated Plant Simulation Codes –A.2 Separate Phenomena Codes –A.3 Parametric Codes APPENDIX B: –B.1 EVNTRE –B.2 SOLOMON –B.3 RISKMAN –B.4 SPSA

(Workshop on Level 2 PSA and Severe Accident Management, March 2004 ) WGRisk Programme of Work (1) u International Workshop on Level 2 PSA and Severe Accident Management. –The main objectives are: v To provide a forum to discuss recent developments in the state-of- the-art of Level 2 PSA and Severe Accident Management. v The information gathered will be used to produce an addendum to the 1997 WGRisk report, v Will provide input into the joint workshop planned by WGAMA, IAGE and WGRisk on Evaluation of Uncertainties in relation to Severe Accident and Level 2 Probabilistic Safety Analysis (to be held in the Fall of 2004), and v Will be used to develop future tasks by WGRisk.

(Workshop on Level 2 PSA and Severe Accident Management, March 2004 ) WGRisk Programme of Work (2) u The Use and Development of PSA in NEA Member Countries [NEA/CSNI/R(2002)18] –This report provides descriptions of the current status of PSA programmes in 17 Member countries including basic background information, guidelines, various PSA applications, major results in recent studies, PSA based plant modifications and research and development topics. While the compilation is a not complete compilation it provides a “snapshot” of the current situation in the Member countries and hence it provides reference information and various insights to both the PSA practicien and others involved in the nuclear industry. –The report forms the basis for a yearly round table discussion at WGRisk meetings and will be updated every 3 to 4 years.

(Workshop on Level 2 PSA and Severe Accident Management, March 2004 ) WGRisk Programme of Work (3) u Use of PSA in Emergency Planning [Task ] –The aim is to identify the approaches being used in the member countries to define the emergency planning zones round nuclear facilities and how this relates to the information provided by the Level 2 PSA. The various approaches would be compared to identify similarities and differences. Consideration would also be given on whether it would be possible to define a common approach to using the Level 2 PSA information for this purpose.

(Workshop on Level 2 PSA and Severe Accident Management, March 2004 ) WGRisk Programme of Work (4) u GAMA/WGRISK/IAGE Workshop on Evaluation of Uncertainties in Relation to Severe Accidents and Level 2 PSA –The objectives are: v To transfer information among Working Groups on an important cross-cutting issue. v To develop a coherent approach/understanding regarding uncertainties. v The product will be proceedings, and conclusions/recommendations addressed to CSNI and the Working Groups. –Tentative Date: Spring 2005

(Workshop on Level 2 PSA and Severe Accident Management, March 2004 ) 21 Summary u WGRisk State-of-the-Art report provided first in-depth look at Level 2 PSA Methodology in the Member Countries u WGRisk has an active programme in the area of Level 2 PSA and Severe Accident Management u WGRisk works (and will continue to work) with other working groups (e.g., GAMA) and other organisations (e.g., IAEA) to co-ordinate it work on this issue.