LCLS Sector 24 QE Magnet Power Supplies January 12, 2006 1 LCLS Sector 24 Power Supplies For QE Magnet Splits Paul Bellomo, Antonio de Lira, Dave Mac Nair.

Slides:



Advertisements
Similar presentations
Basic Electricity.
Advertisements

Oct. 10th 2006NSLS II Accelerator System Advisory Meeting SR-PS 1 NSLS II Accelerator System Advisory Committee Meeting October 10 – NSLS II Storage.
Master Examination Practice Drill # O 1. Given: Two (2) rigid metal conduits (RMC) are to support a weatherproof 18 cu. In. device box, with threaded.
Master Examination Practice Drill # Ted “Smitty” Smith.
DAY 4 CHAPTER 3 CONDUCTOR SIZES,TYPES, ETC.. Continuous Load. A load where the maximum current is expected to continue for 3 hours or more. Continuous.
December 6, 2007AIP /02 P Bellomo - QE Magnet Power System Upgrade1 AIP /02 Review LINAC SECTORS 22 AND 23 QE MAGNET POWER SYSTEM UPGRADE.
EET Electronics Survey Chapter 9 - Circuit Conductors & Wire Sizes.
LV power cables for iTOP
19-21 Dec 20075th ATF2 Project Meeting1 ATF2 High Availability DC Magnet Power Supplies By: Paul Bellomo, Antonio de Lira, David MacNair and Briant Lam*
Master Examination Practice Drill # O Where a hotel has a stationary electric sign installed inside a decorative fountain, the sign shall be at.
AGENDA INTRODUCTION CELLS AND COMPONENTS PV PERFORMANCE PV APPLICATIONS CODES AND STANDARDS EMERGENCY RESPONSE.
15 December ATF2 High Availability DC Magnet Power Supplies – Commissioning Status By: Paul Bellomo, Antonio de Lira, Briant Lam* and David MacNair.
LCLS Injector Power Supplies July 28, LCLS Injector Power Supplies for Purchase Paul Bellomo, Antonio de Lira, Dave Mac Nair.
A* candidate for the power supply Wiener MPOD-LV crate w/ remote control only (except for local on/off switch) Type “EC LV” Front or rear connections (reverse.
Two Minute Drill Number 32- Journeyman Improving your skill in code Look Up Increasing Speed Drill Copyright 2008 Ted "Smitty" Smith.
Copyright 2008 Ted "Smitty" Smith Two Minute Drill Number 25- Residential Improving your skill in code Look Up Increasing Speed Drill.
©Ted “Smitty” Smith  This speed drill is designed to help you practice calculations. The slides will transition in three and one half minutes instead.
Paul Bellomo LCLS Power March 30, LCLS Injector, Sector 21 and BC1 Power Supply Hazard Analysis Summaries P. Bellomo,
Two Minute Drill #8 Copyright 2005 Ted "Smitty" Smith Practice Code Look Up.
Two Minute Drill Number 26- Residential Improving your skill in code Look Up Increasing Speed Drill Copyright 2008 Ted "Smitty" Smith.
Two Minute Drill #9 Copyright 2005 Ted "Smitty" Smith.
Equipment Use In Occupancies  A receptacle shall not be grouped or ganged in enclosures with other receptacles unless they are so arranged so that voltage.
COMMERCIAL ELECTRICAL (Chapter 11)
Magnet Controls Group LCLS Magnet Controls August 16, Status of the LCLS Magnet PS Controls Needed for First Injection.
Paul Bellomo LCLS Power March 30, LCLS Injector, Sector 21 and BC1 New Power Supplies Needed for First Injection.
Two Minute Drill Number 27- Residential Improving your skill in code Look Up Increasing Speed Drill Copyright 2008 Ted "Smitty" Smith.
Dimensioning and Protection of PV Plants with examples of design
Calculation Speed Drill # NEC
Digital Interface for MCOR’s Stan Cohen Albuquerque, NM From the June 9, 2005 presentation by Dr. Stan Cohen - notes on slides 11 and 12 added.
Copyright 2008 Ted "Smitty" Smith.  Left click on the presentation ICON located at the bottom of the slide directory to the left of the this slide. 
21 March 2007ATF2 Power Supplies ATF2 High Availability DC Magnet Power Supplies By Paul Bellomo, Antonio de Lira, David MacNair and Briant Lam*
BDS Magnet-Power System-Facility Optimization1 ILC BDS Kickoff Meeting Basis for Magnet, Power System and Cooling Facility Optimization Discussion Paul.
LCLS Injector Intermediate Power Supply Design Review August 29, LCLS Intermediate Power Supplies Paul Bellomo, Antonio de Lira, Dave Mac Nair.
18-20 December rd ATF2 Meeting, KEK ATF2 Power Supplies1 ATF2 High Availability DC Magnet Power Supplies By Paul Bellomo, Antonio de Lira, David.
AN ENGINEERING SELECTION FOR SIZE OF LONG CONDUCTORS CONSIDERING FACTORS IN ADDITION TO NEC Marcus O. Durham THEWAY Corp / U of Tulsa Robert A. Durham.
Two Minute Drill Number 31- Residential Improving your skill in code Look Up Increasing Speed Drill Copyright 2008 Ted "Smitty" Smith.
Improving your skill in code Look Up Increasing Speed Drill Copyright 2008 Ted "Smitty" Smith Two Minute Drill Number 24- Residential.
ILC BDS Kickoff Meeting Magnet Power Supplies RDR Concepts and Completeness Paul Bellomo SLAC Power Conversion Department October, 2007.
LCLS Sector 21 - BC1 Power Supply Design September 15, LCLS Sector 21 and BC1 Power Supplies Paul Bellomo, Antonio de Lira, Dave Mac Nair.
Marjorie Widmeyer LCLS Injector Magnet Power March 30, LCLS Injector, Sector 21 and BC1 DC Magnet Power and Control.
Grid Tied PV Systems – Part 5
9/18/2003Safety Review Electronics Electronics design LV, HV power supply Fusing Heat.
Starting Residential Wiring.  The most important element in wiring. Safety is proper grounding.  Grounding is the connection of all parts of a wiring.
KEK ATF2 High Availability DC Magnet Power Supplies Phase 2 Progress and Specifications 31 May 2006 Paul Bellomo, Antonio de Lira, Briant Lam and Dave.
January 12, 2006 ATF2 DC Magnet Power Supplies1 Paul Bellomo and Briant Lam.
Advanced Calculations Drill 1 for the 2011 NEC
TROUBLES WITH SPURIOUS “CURRENT LIMIT” IN REMOTE SENSE OPERATION
License Examination Practice Drill
2011 Changes Two Minute Drill
Photovoltaic Systems Engineering Session 21
Photovoltaic Systems Engineering Residential Scale – Part 2
Theory and Calculations
Conductors and Cables 2017 NEC
Ampacity Calculations and Overcurrent Protection 1
Calculation Speed Drill #1
Sector 29 PS Systems Stability Tests for LCLS
Calculations: Transformers and Service Conductor Calculations
Smitty’s Two Minute Drill #1: Feeders and Branch Circuits
For a 15 kW household range, ___ W is the demand load.
EET 323 – Electrical System Design Lecture 9: Grounding
Two Minute Drill Number 29- Conductors and Raceways
Injector, Sector 21 and BC1 Bulk Power Supplies
EET 323 – Electrical System Design Lecture 6: Conductors and Over-Current Protection Radian Belu, PhD.
LCLS Intermediate Power Supplies
Sector 29 PS Systems Stability Tests for LCLS
Smitty’s Two Minute Drill Varied Number 7
48V Power Shelf Operation
Calculations Review Drill
Calculation Speed Drill Varied-1
Presentation transcript:

LCLS Sector 24 QE Magnet Power Supplies January 12, LCLS Sector 24 Power Supplies For QE Magnet Splits Paul Bellomo, Antonio de Lira, Dave Mac Nair

LCLS Sector 24 QE Magnet Power Supplies January 12, LCLS Sector 24 magnet power supplies QE24201 through QE24501 QE24601 QE24701A, B and Q24901A, B

LCLS Sector 24 QE Magnet Power Supplies January 12, Q24201 through Q24501

LCLS Sector 24 QE Magnet Power Supplies January 12, Cable ampacity for new string power cable, 200A needed #350 Cu 90C insulation NEC used as reference Conduit Basic ampacity 350A per Derating for 113F ambient temperature per = A*0.87*=304A Cable Tray Basic ampacity 570A in free air per Derating for 113F maximum temperature per = 0.87 Derating for use in properly loaded cable tray = A*0.87*0.65=322A 304A > 200A or 300A so 350 AWG is ok Q24201 through Q24501

LCLS Sector 24 QE Magnet Power Supplies January 12, Existing: 510ft (round trip) #350kcmil Al  /1000ft New: 300ft (one way) #350AWG Cu  /1000ft The voltage drop change is  E = I* (  R / 1000 ft) *  L ft  E = 200A * ((  – ) / 1000 ft) *(255ft – 300 ft))  E = volt which is essentially no change Material cost estimate 1/C#350 Cu cable - $5.00/ft *300ft = $1, 500 Q24201 through Q24501

LCLS Sector 24 QE Magnet Power Supplies January 12, Issues Investigate source of AC power Investigate existing PPS connection New Ethernet control Material cost estimate $11,800 for 10kW PS, controller, transductions, rack accessories, 600 ft of #350 Cu cable $5.00/ft * 600ft = $3,000 1/3 rack = $1,000 Total - $15,800 excluding AC power Q24601 #350kcmil cable good to 304A

LCLS Sector 24 QE Magnet Power Supplies January 12, ft (round trip) #350kcmil Cu  /1000ft The voltage drop is E = I* ((Cable R / 1000 ft) * L + Magnet R)) E = 200A * ((  ) / 1000 ft) *600 ft)  )) E = 20.3V Q24601

LCLS Sector 24 QE Magnet Power Supplies January 12, Issues Investigate source of AC power Investigate existing PPS connections New Ethernet control Material cost estimate $23,600 for kW PS, controller, transductions, rack accessories, 1,200 ft of 4/0 Cu cable $3.50/ft * 1,200ft = $4,200 2/3 rack = $2,000 Total - $29,800 excluding AC power Q24701A, Q24701B, Q25901A, Q24901B

LCLS Sector 24 QE Magnet Power Supplies January 12, ft (round trip) #350kcmil Cu  /1000ft The voltage drop is E = I* ((Cable R / 1000 ft) * L + Magnet R)) E = 200A * ((  ) / 1000 ft) *625 ft)  )) E = 36.7V for each of two systems Q24701A, Q24701B, Q25901A, Q24901B

LCLS Sector 24 QE Magnet Power Supplies January 12, Q24201 –Q24501$1.5k Q24601$15.8k Q24701A,B Q24901A,B $14.9k Total$47.1k Cost Summary and Closing Slide