Internal Information Services Risk Management Team Gay Infanti Northrop Grumman 8 February 2005.

Slides:



Advertisements
Similar presentations
U.S. Department of the Interior U.S. Geological Survey Beyond the Archive Task Team Discussion at WGISS #25 February, 2008 Lyndon R. Oleson U.S. Geological.
Advertisements

Program Management Office (PMO) Design
Needs Identification Workshop Summary of Results PMI Asia Pacific PMI Congress Sunday, February 26, 2006.
Project Evaluation Tool Project Sponsor: Evaluation Start Date: Project Opportunity: CML/IS PM Testing Process Shubha Chakravarthy / Kathy Madison 11/15/07.
PROJECT RISK MANAGEMENT
State of Indiana Business One Stop (BOS) Program Roadmap Updated June 6, 2013 RFI ATTACHMENT D.
1 NDIA PMSC Services Sub-Committee - Discussion Topics Charter Recap of key points from the April meeting and our current committee status Leadership challenge.
2009 National Defense Industrial Association - Program Management Systems Committee (NDIA PMSC). All rights reserved.. Dave Roberts NDIA PMSC.
The Analyst as a Project Manager
Community Capacity Building Program Strategic Planning
Introduction to Project Management. What is a Project? “A planned undertaking of related activities to reach an objective that has a beginning and an.
European Energy Service Initiative towards the EU 2020 energy saving targets EESI2020 Contract number IEE/12/686/SI from April 2013 to March 2016.
Pre-Project Planning Lessons from the Construction Industry Institute Construction Industry Institute Michael Davis, P. Eng, PMP Ontario Power Generation.
Copyright Prosci All rights reserved. Library of Figures 1 Prosci Change Management ® Please read Right to use this content is governed by the licensing.
First part: Objectives (15 minutes) Second part: Work groups (20 minutes) Third part: Proposal of work groups (10 minutes) REPORT OF WORK METHODOLOGY.
Charting a course PROCESS.
What is Business Analysis Planning & Monitoring?
Integrated PPM Governance Leveraging Org Change Management for PPM Process Implementations Presented by: Allan Mills.
May Agenda  PeopleSoft History at Emory  Program Governance  Why Upgrade Now?  Program Guiding Principles  High-Level Roadmap  What Does This.
NDIA PMSC Scheduling Working Group. Exploratory working group Objective Objective Brainstorm and explore concerns and issues in scheduling bring them.
IT Project Management Cheng Li, Ph.D. August 2003.
Voice over IP Spring LNA Meeting April 1, What is Voice over IP? n A technology for transporting integrated digital voice, video and data over IP.
NDIA SE Division Meeting February 13, Developmental Test and Evaluation Committee Beth Wilson, Raytheon Steve Scukanec, Northrop Grumman Industry.
© 2015 Cengage Learning. All Rights Reserved. May not be scanned, copied or duplicated, or posted to a publicly accessible website, in whole or in part.
Copyright © 2009 NDIA PMSC Robert Loop August 2009 NDIA PMSC Guides Working Group Status.
October 21 st TMD Meeting MW-COG/Marriott Telework Update Robert Brown; Telecommuting Advantage Group.
Dr. Ralph R. Young Director of Software Engineering Systems and Process Engineering Northrop Grumman Information Technology (703)
Earned Value Management Systems (EVMS) Defense Support Team (DST) and Report to Congress Mr. Richard Ginman OUSD(A&T)/DPAP Presentation to National Defense.
Project Scope Management Process
INTRODUCTION TO PROJECT MANAGEMENT. WHAT IS A PROJECT? “A planned undertaking of related activities to reach an objective that has a beginning and an.
New Tools in an Old Company PMI Honolulu Chapter Meeting June 20, 2007.
Copyright © 2004 by The Web Services Interoperability Organization (WS-I). All Rights Reserved 1 Interoperability: Ensuring the Success of Web Services.
Internal Information Services Risk Management Team Gay Infanti Northrop Grumman 3 May 2006.
© MCR, LLC MCR Proprietary - Distribution Limited Earned Value Management Application, Guidance, and Education Neil F. Albert President/CEO MCR, LLC
Understanding Industry Defense Acquisition University 13 May 2010 Status Brief to NDIA Program Systems Committee.
Coalition 101. RESPECT AND VALUE “The group respects my opinion and provides positive ways for me to contribute.” EFFICIENCY AND EFFECTIVENESS “The roles.
Katie A. Learning Collaborative For Audio, please call: Participant code: Please mute your phone Building Child Welfare and Mental.
1 Program Management Systems Committee August 2010 Progress Report Program Management Outreach Working Group Jane Spriggs, Co-Lead Bill Altman, Co-Lead.
Maricopa Priorities Update Spring Agenda Overview Strategic Directions Implementation process Categorized Recommendations Preliminary Timeline.
Presented to: NDIA By: Keith Kratzert Date: August 16, 2006 Federal Aviation Administration Improving Program Performance at FAA.
1 Implementing A PMO & Enterprise Project Management at NIH February 3, 2005 Bill Vesey, PMP Manager EPM Consulting Practice Forte Systems, Inc General.
UCCnet Educational Series Part 2 How to get Started with UCCnet.
1 NDIA PMSC Services Sub-Committee - Overview [initial draft] General Purpose: –To provide focused effort to represent PMSC interests in the application.
Earned Value Management Presented By: Steve Krivokopich May , 2006.
1 NDIA Earned Value Management Application Guide Status Report August 16-17, 2005 Wayne Abba Walt Berkey David Muzio David Treacy NDIA EVM Application.
1 st Workshop on issues and trends arising from the European IRRS missions Findings and Conclusions A.Munuera Brussels, 22 nd and 23 rd January 2014.
1 EMS Fundamentals An Introduction to the EMS Process Roadmap AASHTO EMS Workshop.
Internal Information Services Risk Management Working Group Gay Infanti Northrop Grumman 15 August 2006.
1 IT Project Management, Project Failure and Success  Introduction  Projects operate in a broad organizational environment.  Project managers need to.
1 Program Management Systems Committee (PMSC) Contract / Subcontract Issues Working Group Industry Issues and Position Summary 13 August 2008.
MITM743 Advanced Project Management Dr. Abdul Rahim Ahmad Assoc. Professor College of IT, UNITEN Kerzner Chapter 4 Project Management Methodologies.
Internal Information Services Risk Management Team Gay Infanti/John Driessnack Northrop Grumman 3 May 2005.
Kathy Corbiere Service Delivery and Performance Commission
WELCOME Business Process Management WELCOME. KEY ROLES/RESPONSIBILITIES Project Execution TeamsGovernance Team Project Leaders Deployment Team Project.
MGT 461 Lecture #27 Project Execution and Control Ghazala Amin.
2010 National Defense Industrial Association - Program Management Systems Committee (NDIA PMSC). All rights reserved.. Mary Ann Hale NDIA PMSC.
1 Lecture 2.4a: SEF SE Planning and the SEP (SEF Ch 16) Dr. John MacCarthy UMBC CMSC 615 Fall, 2006.
Continual Service Improvement Methods & Techniques.
© 2003 Six Sigma Academy0 The Roles of Six Sigma Champion Workshop.
Strength through Industry & Technology How is the Government Managing for Value? Program Management Systems Committee March 11, 2007 The Voice of the Industrial.
Resources for Meeting Internet Safety Requirements Cheryl Elliott James Madison University Bill Johnsen Virginia Beach City Public Schools Educational.
Managing Multiple Projects Steve Westerman California Department of Motor Vehicles Steve Young Mathtech, Inc.
Info-Tech Research Group1 Info-Tech Research Group, Inc. Is a global leader in providing IT research and advice. Info-Tech’s products and services combine.
Strategic Planning. Agenda Icebreaker Welcome and Introductions Agenda Review What is Strategic Planning Types of Strategic Planning Planning to Plan.
Analyze Wrap Up and Action Items
MGT 461 Lecture #27 Project Execution and Control
Identify the Risk of Not Doing BA
Project success and failure factors
Employee engagement Delivery guide
Speaker’s Name, SAP Month 00, 2017
Presentation transcript:

Internal Information Services Risk Management Team Gay Infanti Northrop Grumman 8 February 2005

2 Agenda Review team core members/contributors and accomplishments of RM Working Group Review the RM working group’s conclusions/recommendations Recommend where we should go from here

3 Core Membership, RM Team #1 - Government David Bachman, Defense Acquisition University Ivan Bembers, NGA Gary Christle, Center for Naval Analysis James Gordon, NRO Jim Henderson, NAVAIR and NASA John Hogrebe, NAVAIR Dr. Steve Van Drew, NAVAIR Kathy Llewellyn, USN Deborah Tomsic, OUSD (AT&L)/ARA/AM Wilma Uribe, DCMA Headquarters

4 Core Membership, RM Team #1 - Industry Gay Infanti, Northrop Grumman, Team Leader Gene Adams, Northrop Grumman Corporation Wayne Abba, Abba Consulting Dick Coleman, Northrop Grumman Corporation John Driessnack, MCR Craig Peterson, The Mitre Corporation

5 Summary of Accomplishments Shared theories/best practices among the team and with NDIA PMSC Conducted survey to determine current state of process integration among industry and Government program management, business management, and risk management communities Results briefed at April 2004 NDIA PMSC Results also presented in three IPM conference workshops (Fall 2003, Spring and Fall 2004) Published paper summarizing results, conclusions, recommendations and a business case for change NDIA Website Acquisition Community Connection, Risk Management CoP, at _TOPIC _TOPIC

6 Conclusions Programs will benefit from the integration of RM with EVM While some PMs already integrate these processes, there are improvement opportunities There are many barriers to effective process integration that must first be overcome

7 The Business Case Spending a little extra on integrating processes and tools will save a lot in replanning and rework, which drive up product cost and extend program schedules Anticipated savings will also result from identification of opportunities, allowing management to take advantage of them to offset cost impacts and late deliveries Customer goodwill will increase as result of improved program visibility/insight, communications, and credibility (no surprises) Downside of non-integration would be: Management reserves insufficient to cover risks Budget and responsibility for risk handling not built into B/L Risks missed or incorrectly handled Risks, newly identified through the variance analysis process, not addressed in the RM process Risk reserves allocated without regard to severity of risk or, worse, for scope creep resulting in poor ROI Understated EACs

8 Recommendations Recommendations arising from team discussions and survey results fell into three categories: Training Policy Process Recommendations comprise a candidate list of topics for action by the RM working group during its next phase Follow-on team should develop its charter, for the next phase of this effort, from this candidate list and present it to the NDIA PMSC at a subsequent meeting

9 Training Training improvement required to overcome Barriers associated with lack of process maturity and lack of knowledge/skills needed to achieve process integration Perception that EVM is a financial tool, rather than a PM tool; when properly used EVM provides realistic information for management decision-making Training needed to improve understanding of the benefits available from RM and EVM integration Training curriculum should address both EVM and RM training, as core PM processes, and both should reside in the PM curriculum Training should also include techniques and tools for achieving process integration NDIA PMSC should consider partnering with DAU to cooperatively develop solutions in response to team recommendations

10 Policy Policy changes, along with implementing guidance will help remove several barriers to integration once benefits of policy-driven changes are realized Lack of management commitment Internal/external culture Emotional A candidate list of existing policies and guidelines that could be modified to address process integration, as well as potential new policy/guidance, is presented for potential consideration and action in further phases of this effort

11 Process A major barrier to process integration is organizational – RM and EVM usually have different process owners and different process champions Organizational boundaries must be overcome to achieve successful integration Recommend that NDIA PMSC, representing the EVM community, reach out and partner with other communities to create the demand for process integration through cross-functional cooperation

12 Proposed Next Steps NDIA PMSC establish a follow-on team (working group) while interest/momentum are high Sign up members for follow-on team - see next slide for those already committed to participate NDIA PMSC task the follow-on team to develop a charter, execution plan and schedule for the next phase of this effort and report to NDIA PMSC at Spring meeting NDIA continue to promote integrated program management through activities like this RM WG, e.g., chartering other process integration teams (cost estimating, system engineering, have been suggested)

13 Team #2 Membership Team #1 members who have already committed to membership in team #2 Gay Infanti, Northrop Grumman (Team Lead) Wayne Abba, Abba Consulting Gene Adams, Northrop Grumman Ivan Bembers, NGA Dick Coleman, Northrop Grumman John Driessnack, MCR (Co-Lead) Craig Peterson, MITRE and PMI Risk SIG Deborah Tomsic, OUSD (AT&L)/ARA/AM Wilma Uribe, HQ DCMA Dr. Steve Van Drew, NAVAIR Other members are needed; anyone else wishing to join the new team would be welcome and should contact Gay Infanti to sign up Phone: (714)