MQXF length P. Ferracin Video-meeting Structure WG September 18th, 2014.

Slides:



Advertisements
Similar presentations
EuCARD-HFM ESAC review of the high field dipole design, 20/01/2011, Maria Durante, 1/40 EuCARD-HFM ESAC Review of the high field dipole design Fabrication.
Advertisements

Racetrack Coil Technology – G. Ambrosio 1 LARP DOE review – FNAL, June. 5-6, 2007 BNL - FNAL - LBNL - SLAC Racetrack Coil Technology (LR, SQ) & other Supporting.
S. Caspi, LBNL HQS Progress Report High Field Nb 3 Sn Quadrupole Magnet Shlomo Caspi LBNL Collaboration Meeting – CM11 FNAL October 27-28, 2008.
ILC Main Linac Superconducting Cryogen Free Splittable Quadrupole Progress Report V. Kashikhin for Superconducting Magnet Team.
LARP QXF 150mm Structure Mike Anerella / John Cozzolino / Jesse Schmalzle November 15, nd Joint HiLumi LHC-LARP Annual Meeting.
MQXFS Assembly Procedure J.C Perez 4 th Joint HiLumi LHC-LARP Annual Meeting November 17-21, 2014 KEK, Tsukuba N. Bourcey, D. Cheng, B. Favrat, H. Felice,
SQXF Shell & Yoke Assembly Procedure
MQXF Design and Conductor Requirements P. Ferracin MQXF Conductor Review November 5-6, 2014 CERN.
H. Felice - P. Ferracin – D. Cheng 09/19/2013 Update on structure CAD model.
H. Felice - P. Ferracin – D. Cheng 09/11/2013 Update on structure CAD model.
MQXF Cold-mass Assembly and Cryostating H. Prin, D. Duarte Ramos, P. Ferracin, P. Fessia 4 th Joint HiLumi LHC-LARP Annual Meeting November 17-21, 2014.
DOE Review of LARP – February 17-18, 2014 Helene Felice P. Ferracin, M. Juchno, D. Cheng, M. Anerella, R. Hafalia, Thomas Sahner, Bruno Favrat 02/17/2014.
2 nd Joint HiLumi LHC – LARP Annual Meeting INFN Frascati – November 14 th to 16 th 2012 Helene Felice Paolo Ferracin LQ Mechanical Behavior Overview and.
Design Features: still to be determined and open questions P. Ferracin 4 th Joint HiLumi LHC-LARP Annual Meeting November 17-21, 2014 KEK, Tsukuba.
Development of the EuCARD Nb 3 Sn Dipole Magnet FRESCA2 P. Ferracin, M. Devaux, M. Durante, P. Fazilleau, P. Fessia, P. Manil, A. Milanese, J. E. Munoz.
SC magnet developments at CEA/Saclay Maria Durante Hélène Felice CEA Saclay DSM/DAPNIA/SACM/LEAS.
LARP Prototype Assembly Steps Towards Q1 and Q3 Production Dan Cheng MQXF Design Review December 10-12, 2014 CERN H. Felice, R. Hafalia, D. Horler, T.
LARP Prototype Assembly Steps Towards Q1 and Q3 Production Dan Cheng MQXF Design Review December 10-12, 2014 CERN.
Eucard-WP7-HFM 9 th Collaboration Meeting at Warsaw University of Technology Status on SMC & RMC Models J.C Perez on behalf of SMC collaboration team.
10/28/2015Pierre Moyret1 Production of SQXF Magnet Components: Return on experience P.MOYRET EN-MME-FS.
Helene Felice, Dan Cheng Support structure modifications Update on discussion at CERN.
MQXF Design and Conductor Requirements P. Ferracin MQXF Conductor Review November 5-6, 2014 CERN.
MQXF support structure An extension of LARP experience Helene Felice MQXF Design Review December 10 th to 12 th, 2014 CERN.
Superconducting Magnet Group Superconducting magnet development for ex-situ NMR LDRD 2003 Paolo Ferracin, Scott Bartlett 03/31/2003.
Subscale quadrupole (SQ) series Paolo Ferracin LARP DoE Review FNAL June 12-14, 2006.
MQXFS Assembly Procedure J.C Perez N. Bourcey, B. Favrat, P. Ferracin, Ph. Grosclaude, M. Juchno, L. Lambert, P. Moyret, J. Parrilla Leal, N. Peray, T.
Magnet design, final parameters Paolo Ferracin and Attilio Milanese EuCARD ESAC review for the FRESCA2 dipole CERN March, 2012.
Cooling and thermal analysis HL-LHC/LARP International Review of the Inner Triples Quadrupoles (MQXF) Design: dec 2014 / CERN R. van Weelderen, G.
LARP Collaboration Meeting Racetrack Coil Fabrication
MQXF Workshop on Structure, Alignment, and Electrical QA Feb 2-4, 2016 Dan Cheng J. De Ponte, H. Felice, S. Kincaid, T. Lipton, S. Myers, A. Pekadis, M.
Dan Cheng, Helene Felice 4/8/2015 MQXFS-D Build-up LBNL “Lessons Learned”
1 MQXF Workshop on Structure, Alignment, and Electrical QA Feb 2-4, 2016 Options for modifications to parts and procedures Options for modifications to.
Dan Cheng S. Kincaide, H. Felice, X. Wang 4/23/2015 MQXFS Mechanical Interfaces (Proposed)
Overview short model design and structures P. Ferracin on behalf of the MQXF collaboration MQXF Workshop on Structure, Alignment, and Electrical QA CERN.
ILC Main Linac Superconducting Quadrupole V. Kashikhin for Superconducting Magnet Team.
Conductor working group video-meeting P. Ferracin, S. Izquierdo Bermudez December 19, 2013.
MQXFB design, assembly plans & tooling at CERN J.C Perez On behalf of MQXF collaboration team MQXF Workshop on Structure, Alignment and Electrical QA.
DESIGN STUDIES IR Magnet Design P. Wanderer LARP Collaboration Meeting April 27, 2006.
Cold Mass and Assembly Tooling Design, Procurement Status and Assembly Plan Igor Novitski Fermilab 15 T Dipole Design Review April 2016 April 28-29,
MQXFB Prototype structure and plans at CERN J.C Perez On behalf on MQXF collaboration team Joint HiLumi-LARP Meeting & 24 th LARP Collaboration Meeting.
MQXFS01 instrumentation, Projecting towards MQXFA D. Cheng, S. Myers, H. Pan, X. Wang 10/14/20151.
DOE Review of LARP – February 17-18, 2014 Helene Felice P. Ferracin, M. Juchno, D. Cheng, M. Anerella, R. Hafalia, Thomas Sahner, Bruno Favrat 02/17/2014.
CONCEPTUAL DESIGN OF D2 MECHANICAL STRUCTURE (DOUBLE COLLARING OPTION) S. Farinon, P. Fabbricatore (INFN-Sezione di Genova) Sept. 24 th 2015.
Coil-pack assembly procedure Paolo Ferracin LQS01 readiness review #3 Assembly LBNL July 28, 2009.
MQXFSD3 laminated structure J.C Perez N. Bourcey, B. Favrat, P. Ferracin, P. Moyret.
Dan Cheng 8/27/2015 MQXFS1 Observations and Feedback from the Assembly Processes, Part II.
3 rd ESAC Review, 27 th February to 1 st March 2013, CEA Saclay Fresca2 Dipole Structure Assembly J.C Perez on behalf of Fresca2 collaboration team.
QXF magnet integration Paolo Ferracin Joint LARP/CM20 HiLumi meeting Napa Valley, CA, USA 8-10 April, 2013.
Pocket and Metric Hole in End Parts Miao Yu 02/25/2014.
1 Long QXF Mirror Fabrication (MQXFPM1) Rodger Bossert HiLumi-LARP Collaboration Meeting May 18-20, 2016 SLAC R. Bossert - HiLumi Collaboration Meeting.
Helene Felice Team: Dan Cheng, Daryl Horler, Paul Bish, Hugh Highley and Nate Liggins Thank you to Paolo Ferracin, Gianluca Sabbi and Franck Borgnolutti.
MQXF Design and Conductor Requirements
TQS Overview and recent progress
HQ Mirror Assembly R. Bossert
TQS Structure Design and Modeling
MQXF Goals & Plans G. Ambrosio MQXF Conductor Review
ERMC/RMM activities May 2017
FRESCA2 Update on the dipole design and new calculations
Helene Felice 02/15/2013 HiLumi Meeting HQ Program
Discussion session on day 1
Glyn Kirby Magnet AssemblyTechniques.
Voltage tap layout and quench antenna options for the long QXF magnet
Large aperture IR Quadrupole (MQXF) development plan
MQXF updates P. Ferracin October 9th, 2014.
MQXF coil cross-section status
P.Fabbricatore & S.Farinon
Design of Nb3Sn IR quadrupoles with apertures larger than 120 mm
Design of Nb3Sn IR quadrupoles with apertures larger than 120 mm
Helene Felice 02/15/2013 HiLumi Meeting HQ Program
Cross-section of the 150 mm aperture case
Presentation transcript:

MQXF length P. Ferracin Video-meeting Structure WG September 18th, 2014

Coil CAD model 18/09/2014 Paolo Ferracin2

MQXF magnet design Coil Pole alignment key (G11) Bolted collar (Al) Bolted pads (iron) Masters (iron) – For bladders Yoke (iron) Aluminum shell – For pre-load Stainless steel shell – LHe containment 18/09/2014 Paolo Ferracin3

MQXF magnet design Coil Pole alignment key (G11) Bolted collar (Al) Bolted pads (iron) Masters (iron) – For bladders Yoke (iron) Aluminum shell – For pre-load Stainless steel shell – LHe containment 18/09/2014 Paolo Ferracin4

MQXF magnet design 18/09/2014 Paolo Ferracin5

Axial loading and connection box update RE: threaded end plate (50 mm thick) – Axial pre-loading on LE 18/09/2014 Paolo Ferracin6

Axial loading and connection box update Piston support with grooves to provide space for Nb-Ti leads – Cable needs to be bent outwards Thread for rod extensions where second nut will be placed ~70 t provided at room temperature 18/09/2014 Paolo Ferracin7

Axial loading and connection box update Removal of the axial pre-loading system – Still only 1 nut used 18/09/2014 Paolo Ferracin8

Axial loading and connection box update Status before connection box – 2 nut but no rod extension – Connection box will go on top (see later) 18/09/2014 Paolo Ferracin9

Axial loading and connection box update Hard (impossible?) to stay within bushing or nuts or rods 18/09/2014 Paolo Ferracin10

Axial loading and connection box update Support plate 18/09/2014 Paolo Ferracin11

Axial loading and connection box update Instrumentation plate – Wires coming out parallel to the leads 18/09/2014 Paolo Ferracin12

Axial loading and connection box update 2 connections 18/09/2014 Paolo Ferracin13

Axial loading and connection box update Third connection 18/09/2014 Paolo Ferracin14

Axial loading and connection box update Top plate 18/09/2014 Paolo Ferracin15

MQXF magnet design 18/09/2014 Paolo Ferracin16

MQXF magnet design 18/09/2014 Paolo Ferracin17 Magnetic length of short model

MQXF magnet design 18/09/2014 Paolo Ferracin18 From magnetic length to end of magnet (end-plate + connection box) – Connection side: 510 mm – Non-connection side: 214 mm

Q1 Connection side: from magnetic length to end of end-cover – =540 mm (510 mm magnetic to end of magnet in MQXF) Non-connection side: from magnetic length to Q1a-Q1b “middle point” – =250 mm (214 mm magnetic to end of magnet in MQXF) 18/09/2014 Paolo Ferracin19

Q2 Connection side: from magnetic length to end of end-cover – =559 mm (510 mm magnetic to end of magnet in MQXF) Non-connection side: from magnetic length to Q1a-Q1b “middle point” – =250 mm (214 mm magnetic to end of magnet in MQXF) 18/09/2014 Paolo Ferracin20

Minimum distance between Q1a and Q1b magnetic lengths 18/09/2014 Paolo Ferracin21 From magnetic length to end of magnet (end-plate + connection box) – Non-connection side: 214 mm – Minimum distance: (?) = ~ 450 mm

Axial loading and connection box update Still to be added – Lyra between yoke and connection box or pig-tail If bus-bar outside cold mass, no issue – End cover 18/09/2014 Paolo Ferracin22

Axial loading and connection box update Still to be added – Lyra between yoke and connection box or pig-tail If bus-bar outside cold mass, no issue – End cover 18/09/2014 Paolo Ferracin23