WS-RF TCMay 2005 F2F 1 WS-RF Technical Committee May 2005 Face-to-face Agenda.

Slides:



Advertisements
Similar presentations
Balloting/Handling Negative Votes. General Overview of Different Levels of Balloting Subcommittee New Standards Major Revisions Provisional Standards.
Advertisements

WS-Resource Framework: Globus Alliance Perspectives Ian Foster Argonne National Laboratory University of Chicago Globus Alliance
TC Admin Open Mic Session Copyright © OASIS 2012 TC Administration Update Report to Members February 8 th / 9 th 2012.
WS-RF TCMay 2005 F2F 1 WS-RF Technical Committee May 2005 Face-to-face Agenda.
WS-RF TCFeb 2005 F2F 1 WS-RF Technical Committee Feb 2005 Face-to-face Agenda.
Doc.: IEEE wng0 Submission November, 2013 Pat Kinney, Kinney ConsultingSlide 1 Project: IEEE P Working Group for Wireless Personal.
OASIS OSLC CCM TC Inaugural Meeting 04 February /04/14OASIS Presentation to OSLC CCM TC.
Peter Niblett William Vambenepe WS-Notification Face-to-Face May 2005.
Peter Niblett William Vambenepe WS-Notification Face-to-Face May 2005.
1 OASIS WS-Notification TC Inaugural F2F meeting Peter Niblett – convener.
OASIS Web Services Distributed Management Technical Committee July Face to Face IBM Raleigh, NC.
WS-Resource Framework Adam Belloum Computer Architecture & Parallel Systems group University of Amsterdam
4a.1 Grid Computing Standards ITCS 4010 Grid Computing, 2005, UNC-Charlotte, B. Wilkinson, slides 4a.
Building services in WSRF Ben Clifford Draft For GGF summer school, July 2004.
1 Modeling Stateful Resources with Web Services ICE Ph.D lecture Byung-sang Kim.
Proposed TC Issues Process Martin Chapman. Purpose An issues driven process helps to 1.Untangle un-conflate problems 2.Narrow focus to solving particular.
OData Technical Committee Kick-off July 26, 2012.
1 WS-Notification Overview Alan Weissberger NEC-Labs America GGF11 June 8, 2004.
Doc.: IEEE Submission March 2004 Tom Siep, TMS ConsultingSlide 1 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs)
1 WS-Notification Overview Alan Weissberger NEC-Labs America GGF11 June 8, 2004.
BPEL F2F Jan 10 – 12, Proposed agenda Jan Administrative start up –attendance, quorum, minute takers –Review/accept minutes from previous.
Peter Niblett WS-Notification Face-to-Face 12 Sep-15 Sep 2005.
OGSA Hauptseminar: Data Grid Thema 2: Open Grid Service Architecture
Peter Niblett WS-Notification Face-to-Face 12 Sep-15 Sep 2005.
FIMS Specification Group EBU-AMWA FIMS August 2011.
CMIS4DAM TC Inaugural Meeting 03 December /03/14OASIS Presentation to CMIS4DAM TC.
OASIS WSDM TC Face To Face Agenda January, 2005 IBM, Boulder, CO.
Web Service Resource Framework WSMO Presentation Jos de Bruijn Digital Enterprise Research Institute http ://
Abierman-netconf-mar07 1 NETCONF WG 68 th IETF Prague, CZ March 19, 2007.
Transaction Processing CS409 Application Services Even Semester 2007.
Doc.: IEEE /011 Submission January 2000 Al Petrick, ParkerVision TGd IEEE – TGd Jan 10 –15, 2000 Tel Aviv, Israel.
Doc.: IEEE /XXXr0 Submission March, 2004 Matthew Sherman, BAE Systems Slide 1 LMSC Policy and Procedures Update Date: March 18 th, 2005 Author:
Steve Graham WS-ResourceFramework Technical Overview OASIS Tutorial Sunday, April 26th, 2004.
Steve Graham WS-ResourceFramework Modeling Stateful Resources With Web services OASIS WSRF TC F2F Wednesday, April 28th, 2004.
Doc.: IEEE /1442r2 Submission December 2012 Marc Emmelmann, Fraunhofer FOKUSSlide 1 TGai Draft Review Overview Date: Authors:
© 2004 IBM Corporation WS-ResourceFramework Service Groups Tom Maguire.
© 2005 Global Grid Forum The information contained herein is subject to change without notice Leading the pervasive adoption of grid computing for research.
Contents Major issue states and transitions Tools.
WS-Resource Framework University of Amsterdam
Peter Niblett WS-Notification and WS-RF OASIS WS-RF and WS-Notification TC F2Fs July 2004.
OASIS OSLC CCM TC Inaugural Meeting 04 February 2014
OASIS TC Process Overview
CTI STIX SC Monthly Meeting
OCPP TC Inaugural Meeting 07 September 2016
Proposed TC Issues Process
OASIS eTMF TC Inaugural Meeting 16 December 2013
OASIS Overview TC Process
OASIS Overview TC Process
CSAF TC Inaugural Meeting 16 November 2016
CTI TC Monthly Meeting Updates Session #1: 11:00 AM EST
WS-Resource Framework: Globus Alliance Perspectives
OASIS OSLC Core TC Inaugural Meeting 12 November 2013
OASIS Overview TC Process & Administration
July 2014 doc.: IEEE /3/2018 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title:
July 2014 doc.: IEEE /3/2018 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title:
OSLC Domains TC Inaugural Meeting 30 September 2016
ARIP TC Inaugural Meeting 22 May 2015
July 2014 doc.: IEEE /25/2018 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title:
CTI TC Inaugural Meeting 18 June 2015
Legal Citation Markup TC Inaugural Meeting 12 February 2014
OSLC PROMCODE TC Inaugural Meeting 26 March 2014
WS-RX TC Process for Specification Development
IBOPS TC Inaugural Meeting 23 September 2014
OSLC Automation TC Inaugural Meeting 25 March 2014
COEL TC Inaugural Meeting 15 July 2015
BIOSERV TC Inaugural Meeting 08 July 2015
OASIS VIRTIO TC Inaugural Meeting 30 July 2013
802.11F Meeting Report March 2002 Month 1998 doc.: IEEE /xxx
July 2014 doc.: IEEE /24/2019 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title:
May 2019 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [TG w May 2019 Closing Report] Date.
Presentation transcript:

WS-RF TCMay 2005 F2F 1 WS-RF Technical Committee May 2005 Face-to-face Agenda

WS-RF TCMay 2005 F2F 2 Agenda – Monday 16 th 13:00 - Opening remarks, welcome (Chairs) – Roll call –Approve last telecon minutes –Review Action items from last telecon –Call for AOB for this F2F 13:30 – 14:30 Validate closure of following issues from updated documents (Doc editors) –Docs: WS-Resource, WS-ResourceProperties, WS-ResourceLifetime, WS-BaseFaults, WS- ServiceGroup, AppNotes –(Doc editors to upload new drafts before start of meeting) 14:30 – 15:30 Issue review (Chairs) –Remaining issues affecting WS-Resource, WSRF-RP, WSRF-RL, WSRF-BF, AppNotes. –Find new editor(s) for AppNotes. –Objective – clear way for editors to produce committee draft and public review draft. 15:30 – 16:30 (Ian) –Roadmap to OASIS Standard –Committee draft  Public review  Committee specification  OASIS standard –Outline dates for all TC outputs 16:30 – 18:00 Primer Review (Tim) –Tim to lead review of Primer (to be distributed prior to F2F). 18:00 – Close

WS-RF TCMay 2005 F2F 3 Action items (Bryan) Move issue WSRF109 to open (Editors) Further call for comments on AppNotes additions document –Further to comments already recv’d (IanR/TomM) Organise a call on RMD advertise via the TC web site. (Bryan) move issues WSRF103, WSRF106, WSRF104 to resolved (Bryan) move issues WSRF105 to open.

WS-RF TCMay 2005 F2F 4 Agenda – Monday 16 th (detail) 13:30 – 14:30 Validate closure of following issues from updated documents –WSRF89: Document-literal serialization –WSRF91: Resource Access Pattern reaction to the removal of ReferenceProperties –WSRF92: Update examples to be compliant with the recent version of WS-Addressing –WSRF99: Examples in the specs use the SOAP 1.2 namespace –WSRF101: Use of non-normative references –WSRF97 QueryResourceProperties WSDL portType does not reference the property it requires as specified in XML schema –WSRF98: Cardinality of SetResourceProperty content –WSRF102: InvalidDeleteResourcePropertiesRequestContent needed –WSRF63: Which lifetime attributes (ala OGSI) should be specified for resource properties –WSRF100: Confusion about requirement of using WS-BaseFaults for all faults from WS- Resources –WSRF106: Not clear how to map faults for SOAP 1.1 and SOAP –WSRF22: QNames as attribute values or text nodes is problematic with signatures/encryption and intermediaries –WSRF103: Multiple Service Port elements legitimate? Need to confirm wsa:Action in WSDL –WSRF44: No obvious mechanism to include only members which extend a certain interface –WSRF58: ServiceGroup WSDL does not need imports for WSRF-RL WSDL/schema –WSRF59: Inconsistencies in ServiceGroups –WSRF65: Need a mechanism to aggregate an operation across several resources in a ServiceGroup –WSRF69: Content should be declared with minOccurs="0" –WSRF87: InitialTerminationTime in Add method needs to have stronger guarantee –WSRF104: Content Rule Applies in Two Ways

WS-RF TCMay 2005 F2F 5 Agenda – Monday 16 th (detail) 14:30 – 15:30 Issue review (Chairs) –WSRF107: Consider whether the WS- MessageDelivery embodiment is still needed –WSRF109: Clarify authoritative precedence earlier (Terminology) –WSRF110: BaseFaults does not allow open content –WSRF111: Missing fault message for unexpected faults –WSRF 112: Dependency on WS-Notification –WSRF 113: Correlation between NS and location –WSRF 114: wsa:Action URI for fault messages.

WS-RF TCMay 2005 F2F 6 Standards Approval Process Working draft –any version of a specification or other document produced by the TC which has not yet received any level of approval from the TC. –we used to call these editor drafts. Committee draft –an interim document approved by a TC full majority vote of the TC required –no notification to OASIS required –we used to call these working drafts Public Review Draft –a Committee Draft that has been approved by the TC to go to public review full majority vote of the TC required –TC Administrator announces on the OASIS members list –TC Administrator issues a Call For IPR Disclosure. –Public comments addressed to public wsrf-comment list –If changes are required the specification must be withdrawn from review then resubmitted. The TC may conduct any number of review cycles (i.e. approval to send a Committee Draft to Public Review, collecting comments, making edits to the specification, etc.). –1 st public review of a specification must take place for a minimum of 60 days; any subsequent reviews must be held for a minimum of 15 days. Committee specification –a Public Review Draft that has completed public review and achieved final approval by a Technical Committee –The TC Administrator conducts a ballot to approve the Committee Specification. OASIS standard –a Committee Specification that has been submitted by a Technical Committee and reviewed and approved by OASIS membership

WS-RF TCMay 2005 F2F 7 Agenda – Tuesday 17 th 8:30 – 10:30 ServiceGroup spec (Tom M/Dave S) –Remaining issues affecting WS-ServiceGroup: WSRF105: ServiceGroupEntry as a WS-Resource is too Heavyweight. –Working session to close down ServiceGroup spec (section by section) to produce committee draft and possibly public review draft. 10:30 – 12:00 Issues Noon - Lunch (45 mins) 12:45 – 15:00 ResourceMetadata spec (Tom M, William V) –Report back on the progress and outcome of the RMD telecon. –Working session to close down RMD spec (section by section) to produce committee draft and possibly public review draft. 15:00 – 15:30 Roadmap for remaining TC outputs (Ian) –Outline dates to OASIS standard for ResourceMetadata, Primer, AppNotes 15:30 – 18:00 Break-out sessions –Editors to produce committee draft specifications for: WS-Resource, ResourceProperties, ResourceLifetime, ServiceGroup, BaseFaults, ResourceMetadata, AppNotes, Primer –Editors to prepare public review drafts for: WS-Resource, ResourceProperties, ResourceLifetime, BaseFaults and (if possible) ServiceGroup. –Refresh Requirements document 18:00 – Close

WS-RF TCMay 2005 F2F 8 Agenda – Tuesday 17 th 8:30 – 10:30 ServiceGroup spec (Tom M/Dave S) –Remaining issues affecting WS-ServiceGroup: WSRF105: ServiceGroupEntry as a WS-Resource is too Heavyweight. –Working session to close down ServiceGroup spec (section by section) to produce committee draft and possibly public review draft. 10:30 – 12:00 Issues (chairs) –Re-review specs from yesterday with updates. Close those issues. –Continue with remaining issues affecting WS-Resource, WSRF-RP, WSRF-RL, WSRF-BF, AppNotes. Noon - Lunch (45 mins) 12:45 – 13:30 (Ian) –Roadmap to OASIS Standard –Committee draft  Public review  Committee specification  OASIS standard –Outline dates for all TC outputs 13:30 – 14:00 Primer Review (Tim) –Tim to lead review of Primer (to be distributed prior to F2F). 14:00 – 15:30 ResourceMetadata spec (Tom M, William V) –Report back on the progress and outcome of the RMD telecon. –Working session to close down RMD spec (section by section) to produce committee draft and possibly public review draft. 15:30 – 18:00 Break-out sessions –Editors to produce committee draft specifications for: WS-Resource, ResourceProperties, ResourceLifetime, ServiceGroup, BaseFaults, ResourceMetadata, AppNotes, Primer –Editors to prepare public review drafts for: WS-Resource, ResourceProperties, ResourceLifetime, BaseFaults and (if possible) ServiceGroup. –Refresh Requirements document 18:00 – Close

WS-RF TCMay 2005 F2F 9 Agenda – Wednesday 18 th 8:30 – 10:00 Conclude editorial work 10:00 – 10:30 Approval ballots (Chairs) –committee drafts and public review drafts 10:30 – 11:00 Follow-on planning (Chairs) –Location for next F2F 12 Sep 19 Sep 11:00 – 12:00 AOB 12:00 Close