Status of the CSC Track-Finder Darin Acosta University of Florida.

Slides:



Advertisements
Similar presentations
Slice Test DAQ. Two Systems Underway There are essentially two systems being designed concurrently: Trackfinder test, and EMU slicetest. Goals of the.
Advertisements

CPT Week, Nov 2003, B. Paul Padley, Rice University1 CSC Trigger Status, MPC and Sorter B. Paul Padley Rice University November 2003.
CSC Muon Trigger September 16, 2003 CMS Annual Review 1 CSC Muon Trigger - Annual Review Jay Hauser, with many slides from Darin Acosta and Stan Durkin.
CSC Muon Trigger September 16, 2003 CMS Annual Review 1 Current Status of CSC Trigger Elements – Quick Summary Jay Hauser, with many slides from Darin.
Commissioning of CSCs and Peripheral Crates Task L M. Ignatenko UCLA October
Jay Hauser, Fermilab Director’s Review, Apr. 30, CSC Muon Trigger Jay Hauser Director’s Review Fermilab, Apr 30, 2002 Outline The CSC muon trigger.
Jay Hauser, Emu meeting at Florida, 9 January CSC Trigger Meeting Summary Cast of many.
CSC Muon Trigger September 21, 2004 CMS Annual Review 1 CSC Muon Trigger - Annual Review Jay Hauser, with many slides from Darin Acosta and Paul Padley.
US CMS DOE/NSF Review: June 2002, Darin Acosta, University of Florida1 Muon Track-Finder Trigger Darin Acosta University of Florida June, 2002.
CSC Trigger Report: Results from June 25 ns beam test Production plans Software Darin Acosta University of Florida.
CHEP March, B. Scurlock, University of Florida1 D. Acosta, V. Golovtsov, M. Kan, A. Madorsky, B. Scurlock, H. Stoeck, L. Uvarov, S.M. Wang University.
The Track-Finding Processor for the Level-1 Trigger of the CMS Endcap Muon System D.Acosta, A.Madorsky, B.Scurlock, S.M.Wang University of Florida A.Atamanchuk,
Emulator System for OTMB Firmware Development for Post-LS1 and Beyond Aysen Tatarinov Texas A&M University US CMS Endcap Muon Collaboration Meeting October.
An Asynchronous Level-1 Tracking Trigger for Future LHC Detector Upgrades A. Madorsky, D. Acosta University of Florida/Physics, POB , Gainesville,
Printed by Topical Workshop on Electronics for Particle Physics TWEPP-08, Naxos, Greece / September 2008 MEZZANINE CARDS FOR.
Summary of CSC Track-Finder Trigger Control Software Darin Acosta University of Florida.
Track-Finder Trigger at the Beam Test Results and Features Darin Acosta, Rick Cavanaugh, Victor Golovtsov, Lindsey Gray, Khristian Kotov, Alex Madorsky,
CSC EMU Muon Sorter (MS) Status Plans M.Matveev Rice University August 27, 2004.
CSC Endcap Muon Port Card and Muon Sorter Upgrade Status May 2013.
CPT Week, April 2001Darin Acosta1 Status of the Next Generation CSC Track-Finder D.Acosta University of Florida.
W. Smith, U. Wisconsin, US CMS Collaboration Meeting, May 10, 2002: TriDAS 1 US CMS TriDAS US CMS Meeting Wesley H. Smith, U. Wisconsin CMS Trigger Project.
Test Beam Wrap-Up Darin Acosta. Darin Acosta, University of Florida 18 June 2004 USCMS Meeting 2 Agenda n Darin/UF: General recap of runs taken, tests.
Upgrade of the CSC Endcap Muon Port Card and Optical Links to CSCTF Mikhail Matveev Rice University 17 August 2012.
CSC EMU/Track Finder Clock and Control Board (CCB’2004) Status Plans M.Matveev Rice University August 27, 2004.
Upgrade of the CSC Endcap Muon Port Card Mikhail Matveev Rice University 1 November 2011.
W. Smith, DOE/NSF Review, August, 2006 CMS Trigger - 1 SORT ASICs (w/heat sinks) EISO Bar Code Input DC-DC Converters Clock delay adjust Clock Input Oscillator.
CSC Endcap Muon Port Card and Muon Sorter Status Mikhail Matveev Rice University.
CSC ME1/1 Upgrade Status of Electronics Design Mikhail Matveev Rice University March 28, 2012.
1.2 EMU Electronics L.S. Durkin CMS Review CERN, September 2003.
T.Y. Ling EMU Meeting CERN, September 20, 2005 Status Summary Off-Chamber Electronics.
CSC Track-Finder Plans for Commissioning at Bat.904 and Point 5 Darin Acosta University of Florida.
US CMS DOE/NSF Review, May Cal. Trig. 4 Gbaud Copper Link Cards & Serial Link Test Card - U. Wisconsin Compact Mezzanine Cards for each Receiver.
CMS Latency Review, 13th March 2007CSC Trigger 1 Latency and Synchronization update.
US CMS DOE/NSF Review: June 2002, B.Paul Padley, Rice University1 CSC Muon Trigger On Detector Components B. Paul Padley Rice University June, 2002.
Track-Finder Test Beam Results Darin Acosta. Darin Acosta, University of Florida 30 July 2004 Trigger Meeting CSC Beam Test (Muon Slice Test) ME.
Tridas Week, November 2000Darin Acosta1 Status of the CSC Track-Finder D.Acosta, A.Madorsky, S.M.Wang University of Florida B.Cousins, J.Hauser, J.Mumford,
W. Smith, U. Wisconsin, US CMS DOE/NSF Review, September 2004 Trigger Report - 1 CSC Trigger Muon Port Card & Sector Processor in production Mezzanine.
US CMS DOE/NSF Review, 20 November Trigger - W. Smith1 WBS Trigger Wesley H. Smith, U. Wisconsin CMS Trigger Project Manager DOE/NSF Status.
US CMS DOE/NSF Review: April 11-13, Trig. - Estimate to Complete.
10 th LECC Workshop, September 2004, Hauser et al.1 Experience with Trigger Electronics for the CSC System of CMS J. Hauser*, E. Boyd, R. Cousins,
Electronics Review, May 2001Darin Acosta1 OPTICAL SP 1 Muon Sorter 3  / port card 3  / sector ME1 ME2-ME3 ME4 SR DT TF SP From CSC Port Cards MS MB1.
Upgrade of the CSC Endcap Muon Port Card with Spartan-6 FPGA Mikhail Matveev Rice University 30 April 2012.
US CMS DOE/NSF Review, May Trigger Plenary - W. Smith1 WBS Trigger Wesley H. Smith, U. Wisconsin CMS Trigger Project Manager DOE/NSF.
M.Matveev Rice University March 20, 2002 EMU Muon Port Card Project.
SLHC Design Considerations for the CSC Track-Finder & An Asynchronous Trigger Proposal Darin Acosta and Alex Madorsky University of Florida.
W. Smith, U. Wisconsin, US CMS DOE/NSF Review, May, 2004 Trigger Report - 1 CSC on-detector peripheral crate SBS VME Controller Muon Port Card: Output.
CSC Ops/DPG meeting, 05-Oct-2011 Hauser1 ALCT boards for ME4/2 etc.
CSC Test Beam 2004 Summary Darin Acosta (For the EMU Collaboration)
CMS Week, 3-7 November CSC Trigger Test Beam Report Cast of many.
Update on CSC Endcap Muon Port Card
CSC EMU Muon Port Card (MPC)
Combined SR/SP UF Fits all of previous SP board logic! Main FPGA
Upgrade of the CSC Endcap Muon Port Card and Optical Links to CSCTF
Muon Track-Finder Trigger
CMS EMU TRIGGER ELECTRONICS
Regional Cal. Trigger Milestone: Major Production Complete
Current Status of CSC Trigger Elements – Quick Summary
CSC Muon Trigger - Annual Review
CSC Trigger Update Specific issues:
Darin Acosta University of Florida
September CSC Beam Test Report
Regional Cal. Trigger Milestone: Production & Testing Complete
CSC Trigger Muon Port Card & Sector Processor in production
New Calorimeter Trigger Receiver Card (U. Wisconsin)
Preliminary CSC Trigger Results from September Testbeam
Regional Cal. Trigger Milestone: Production Complete - U. Wisconsin
CSC Trigger Meeting Summary
Sector Processor Status Report
CSC Muon Sorter Status Tests Plans M.Matveev August 21, 2003.
Plans for the 2004 CSC Beam Test
Presentation transcript:

Status of the CSC Track-Finder Darin Acosta University of Florida

CMS Week, 25 Feb 2003D.Acosta, University of Florida2 CSC Muon Trigger Scheme CSC CFEB ALCT 1 of 24 CFEB 1 of 2 LVDB 1 of 5 Anode Front-end Board Cathode Front-end Board Anode LCT Board MPCMPC DMBDMB TMBTMB DMBDMB TMBTMB DMBDMB TMBTMB DMBDMB TMBTMB DMBDMB TMBTMB DMBDMB TMBTMB DMBDMB TMBTMB DMBDMB TMBTMB DMBDMB TMBTMB CCBCCB CONTROLLERCONTROLLER Peripheral Crate on iron disk (1 of 48) Trigger Timing & Control CSC Track-Finder Crate (1) Trigger Motherboard (9) DAQ Motherboard (9) Clock Control Board Optical link In underground counting room On detector Muon Portcard (1) EMU part: mostly in productionTriDAS part: Second generation prototypes Trigger Primitives 3-D Track-Finding and Measurement Sector Processor (12) Muon Sorter (1)

CMS Week, 25 Feb 2003D.Acosta, University of Florida3 1 st Prototype Track-Finder Tests (2000) Sector Processor (Florida) Sector Receiver (UCLA) Clock Control Board (Rice) Bit3 VME Interface CustomChannelLinkBackplane(Florida) Muon Port Card (Rice) Very successful, but overall CSC latency was too high -- New 2002 design improves latency Results included in Trigger L1 TDR

CMS Week, 25 Feb 2003D.Acosta, University of Florida4 CSC Track-Finder Crate CSC Track-Finder Crate SR / SP SR / SP SR / SP SR / SP SR / SP SR / SP SR / SP SR / SP SR / SP SR / SP SR / SP SR / SP CCB SBS 620 Controller Sector Processor Clock and Control Board Muon Sorter From MPC (chamber 4) From MPC (chamber 3) From MPC (chamber 2) From MPC (chamber 1B) From MPC (chamber 1A) To DAQ MS Single Track-Finder Crate Design with 1.6 Gbit/s optical links Second generation prototypes 4 merged boards

CMS Week, 25 Feb 2003D.Acosta, University of Florida5 Combined SR/SP 2002 Prototype è Problems encountered attempting layout using in-house tools è Sent to industry for completion of layout using Cadence Allegro è Final board takes 16 layers è Cost of manufacture, assembly, and parts is about $20K / board

CMS Week, 25 Feb 2003D.Acosta, University of Florida6 SP2002 Main Board (SR Logic) 3 SRs Optical Transceivers 15 x 1.6 Gbit/s Links Front FPGA TLK2501 Transceiver Phi Local LUT Eta Global LUT Phi Global LUT EEPROM VME/ CCB FPGA DC-DC Converter

CMS Week, 25 Feb 2003D.Acosta, University of Florida7 SP Trigger Logic From SP2000 to SP2002 mezzanine card Xilinx Virtex-2 XC2V4000 ~800 user I/O (Mezzanine card also used for CSC sorter)

CMS Week, 25 Feb 2003D.Acosta, University of Florida8 Tests underway…

CMS Week, 25 Feb 2003D.Acosta, University of Florida9 Optical Link Test Results Using pseudo-random test built into TLK2501 chipset è SP02 optical loopback test over 1 m optical cable p No errors! è SP02 optical loopback test over 100 m cable p BER = 10  12 è MPC  SP02 optical test over 100 m cable p BER = 3×10  13 Controlled MPC  SP02 chain test è Download 255 bx of data for one MPC (3 muons × 32 bits), preceding each iteration with a L1 Reset è Send data over three 100 m cables into SP, and readout p Counting the 0’s transmitted between iterations, 30 link errors observed in total from 3 links over 16 hours (3×10 14 bits)  BER = 10  13 Thus, about 1 error / hour, likely from clock jitter

CMS Week, 25 Feb 2003D.Acosta, University of Florida10 Optical Link Tests (Cont’d) Controlled MPC  SP02 chain test without L1 Reset è This is how we would like to operate è Explicitly check data sent vs. data received è Tests underway, code still needs improvements (e.g. to issue L1 Reset if link fails and does not recover)

CMS Week, 25 Feb 2003D.Acosta, University of Florida11 Schedule Proposed schedule as of Feb-2003: è Feb.’03: SP02 prototype completed, initial tests begin è Mar.’03: MPC  SP optical link tests è Apr.’03: SP memory and trigger logic tests è May.’03: CSC system tests with cosmic rays and beam tests at CERN è June ’03… : Tests with Muon Sorter and DT Track-Finder √ √ (April)

CMS Week, 25 Feb 2003D.Acosta, University of Florida12 Test Beam Plans Plan to test CSC Trigger all the way to the Track- Finder in May/June beam tests è Complete chain test from 2 detectors to peripheral crate electronics to Track-Finder crate electronics! Structured beam period: 23 May  1 June è Two DAQ systems will run concurrently: CSC DAQ and Track-Finder DAQ è Track-Finder will just log inputs, not generate a track trigger è Goal is to validate trigger primitives are found efficiently on correct bx and successfully received over optical links è Record as much data as possible under various detector configurations for future track identification studies Asynchronous beam period: 13 June  1 July è Possibility to test a unified DAQ using “slice test” software developed in XDAQ

CMS Week, 25 Feb 2003D.Acosta, University of Florida13 Conclusions Second generation CSC Track-Finder prototype completed Optical link tests between Port Card and Sector Receiver successful è Measurable (but small ~ ) bit error rate seen Plan to take T-F to beam test later this month Tests of SR memories and SP trigger logic to follow Interface tests with CSC Sorter and DT T-F also planned