1 Fulvio TESSAROTTO CERN, 23/04/2008 - Contribution from Trieste UPDATE ON TRIESTE LAB. ACTIVITY The set-up to measure currents THGEM prototypes from ELTOS.

Slides:



Advertisements
Similar presentations
Status of test beam data analysis … with emphasis on resistive coating studies Progress and questions 1Meeting at CEA Saclay, 25 Jan 2010Jörg Wotschack,
Advertisements

1 First observations on CsI -coated ThGEM in Trieste presented by Gabriele Giacomini phone meeting 06/08/2008.
Mechanical check of PMT Check base: Remove black tape and two small screws that secure the base. Tighten the nuts on the BNC connector for the HT input.
1Daya Bay RPC HV FDR 6/17/2008 RPC HV cable pick-up noise issue C. Lu, Princeton University (6/17/2008)
CMS WeekDec 2002E. Hazen HF Electronics Status Report E. Hazen, J. Rohlf, E. Machado Boston University.
Mauro Raggi Status report on the new charged hodoscope for P326 Mauro Raggi for the HODO working group Perugia – Firenze 07/09/2005.
A.Kashchuk Muon meeting, CERN Presented by A.Kashchuk.
IFR/LST Meeting Feb 26, 2003K. Honscheid, Ohio State University High Voltage Requirements Commercial Solutions Custom Solutions.
Tests of a 10cm by 10cm triple GEM detector
Large Cell Scope Pictures, Part II HV Gnd 1nF Large Cell Tube Anode signal Phi Cathode signal scope S1 S2 S1 S2 This is a follow-up on Richard’s measurement.
ECAL electronics Guido Haefeli, Lausanne PEBS meeting 10.Jan
1 New dividers for LAV photomultipliers G.Corradi,D.Tagnani,C.Paglia, M. Raggi LAV working group CERN 3/2/2010.
1 Production issues of THGEMS at ELTOS The production procedure Quality checks - visual inspection - electrical tests Problems we faced Conclusions Fulvio.
CERN DC Spark System Capabilities Anders Korsbäck, BE-RF-LRF University of Helsinki.
Noise studies: hardware tests and preliminary results Anna, Anton, Giovanni, Pigi, Silvia, A. Boiano, A. Vanzanella.
1 Fulvio TESSAROTTO RD51 meeting, Paris, 14/10/2008 THGEM production at ELTOS Production of THGEM at ELTOS S.p.A. Company profile Production procedures.
Dimensions of the PDM frame: 167mm x 167mm x 28.7mm.
New Developments in Large Area THGEMs & APV Exercise INFN – Sezione di Trieste Carlos Alexandre Fernandes dos Santos 11/December/2014.
CAEN November 15, 2002 Vandelli W. 1 Test Conditions Prototype fed by CAEN Module 2527 through 100 m long cables From channels status page on generator.
EC front unit status. Outline Conclusions from mechanical prototype and actions taken Status of electrical prototype KIT’s work for TA Dev plan (tests)
CMS ECAL End Cap Meeting CERN 19 June to 23 June 2000 A.B.Lodge - RAL 1 ECAL End Cap High Voltage Cards and 2000 Electrical/Thermal Model. Progress on.
1 First observations on CsI -coated ThGEM in Trieste presented by Gabriele Giacomini phone meeting 06/08/2008.
1 NA58 RICH Test Beam T10 sept.2014 Fulvio Tessarotto – Stefano Levorato Partecipants: Alessandria, Aveiro, Budapest, Calcutta, Freiburg, Liberec, Prague,
DEVELOPMENT OF A THGEM-BASED PHOTON DETECTOR FOR CHERENKOV IMAGING APPLICATIONS Silvia Dalla Torre INFN - Trieste On behalf of an Alessandria-CERN-Freiburg-Liberec-Prague-Torino-TriesteCollaboration.
Two-stage amplifier status test buffer – to be replaced with IRSX i signal recent / final (hopefully) design uses load resistor and voltage gain stage.
1 ATF2 Q BPM electronics Specification (Y. Honda, ) Design System –Hardware layout –Software –Calibration Testing Production schedule ATF2 electronics.
1 Development of Multi-Pixel Photon Counters (1) S.Gomi, T.Nakaya, M.Yokoyama, M.Taguchi, (Kyoto University) T.Nakadaira, K.Yoshimura, (KEK) Oct
Lab tests of Thick GEMs (THGEM) Lab tests of Thick GEMs (THGEM) S. Dalla Torre, Elena Rocco, L. Ropelewski, F. Tessarotto May – August 2007.
1 IBF in aligned, misaligned and FLOWER THGEMs The IBF problem Standard THGEM configuration COBRA and extra electrode Misaligned holes FLOWER THGEM solution.
1 4 PCB: LEFT TOP 115 channels, LEFT BOTTOM (115), RIGHT TOP (106), RIGHT BOTTOM (106). For LEFT TOP board 115 channels we have: 115 smd connectors (AMP.
LNF activities on WPC Panels Construction of prototypes and layout Status of tooling Proto 0, open items, plan,...
Jan, 2001CMS Tracker Electronics1 Hybrid stability studies Multi – chip hybrid stability problem when more then ~ 2 chips powered up -> common mode oscillation.
Update on the Triple GEM Detectors for Muon Tomography K. Gnanvo, M. Hohlmann, L. Grasso, A. Quintero Florida Institute of Technology, Melbourne, FL.
First results from the Biocams J. Brunner. Cameras on floor 1 and floor 5 together with an OM and an ADCP Floor 1 –80m above sea floor Floor 5 –270m above.
Update on THGEMs and Micromegas production for RICH-1 COMPASS Upgrade on behalf of THGEM Trieste group INFN - Sezione di Trieste S . Levorato S. Levorato.
1 Fulvio TESSAROTTO CERN, 20/03/ GDD Meeting - Contribution from Trieste FIRST LOOK AT THGEM IN TRIESTE LAB. The set-up to measure currents THGEM.
Large THGEMs, uniformity and gain largely based on the paper for MPGD13 and some recently obtained results S. Levorato THGEM meeting CERN 13 Nov
PSD upgrade: concept and plans - Why the PSD upgrade is necessary? - Concept and status of the PSD temperature control - Concept of the PSD analog part.
1 SiPM studies: Highlighting current equipment and immediate plans Lee BLM Quasar working group.
E.Guschin (INR,Moscow) 3 May 2006Calorimeter commissioning meeting Status of PRS/SPD detector Cosmic test results Installation/tuning of monitoring system.
Gain stability and the LYSO beam radiation monitor measurements
Linearity Tests The laser induced high noise pulses on the APD rendering it useless. We tried several methods to shield and filter the noise. With a stabilized.
Quality control for large volume production GEM detectors Christopher Armaingaud On behalf of the collaboration GEMs for CMS.
Zaragoza, 5 Julyl Construction of and experience with a 2.4 x 1 m² micromegas chambers Givi Sekhniaidze On behalf of the Micromegas community.
SPD VFE installation and commissioning (status and plans) I.Summary of VFE installation II.Stand alone VFE test: noise & offset III.Stand alone test: LED.
Recent progress in large THGEM production On behalf of Trieste group and Rui de Oliveira (CERN) S. Levorato RD51 mini week1.
Status of the PSD upgrade - Status of the PSD cooling and temperature stabilization system - MAPD gain monitoring system - PSD readout upgrade F.Guber,
1 Fulvio TESSAROTTO THGEM discussion, 02/11/2009 THGEM production at ELTOS Production of THGEM at ELTOS S.p.A. Company profile Production procedures Small.
1 Fulvio TESSAROTTO CERN, 13/11/ COMPASS THGEM meeting Construction of the large size Hybrid Prototype The bulk Micromegas technology Examples of.
1 Fulvio TESSAROTTO GDD meeting, CERN, 01/10/2008 Trieste THGEM news New THGEM test in the COMPASS hall New THGEM test in the COMPASS hall Preparation.
Update on THGEM project for RICH application Elena Rocco University of Eastern Piedmont & INFN Torino On behalf of an Alessandria-CERN-Freiburg-Liberec-
1 9 December 2002A.P.Kashchuk (LNF/INFN), Frascati) New approach to CPC design.
Presentazione delle richieste immediate per l’upgrade di MEG (gruppo di Roma) Cecilia Voena Mar 15 th, 2013.
R&D status of the very front end ASIC Tilecal week (7 October 2011) François Vazeille Jacques Lecoq, Nicolas Pillet, Laurent Royer and Irakli Minashvili.
1 Projectile Spectator Detector: Status and Plans A.Ivashkin (INR, Moscow) PSD performance in Be run. Problems and drawbacks. Future steps.
PHOTOTUBE SCANNING SETUP AT THE UNIVERSITY OF MARYLAND Doug Roberts U of Maryland, College Park.
High Voltage Power Supply for RPC Suvendu Nath Bose, Satyajit Saha, Sudeb Bhattacharya, Saha Institute of Nuclear Physics, Kolkata,, Description Presently.
Page Detector and Electronics R&D for picosecond resolution, single photon detection and imaging J.S. MilnesPhotek Ltd T.M. ConneelyUniversity.
1 Fulvio TESSAROTTO CERN, 13/02/ GDD Meeting - Contribution from Trieste THGEM: TRIESTE LAB. EQUIPMENT AND CONTACTS WITH POSSIBLE PRODUCER Introduction.
R&D activities on a double phase pure Argon THGEM-TPC A. Badertscher, A. Curioni, L. Knecht, D. Lussi, A. Marchionni, G. Natterer, P. Otiougova, F. Resnati,
Plans for this week MWPC: wire stretching today
The GOOFIE detector as a Ternary Mixture Monitor
Calorimeter Mu2e Development electronics Front-end Review
Analog FE circuitry simulation
Hybrid MPGD based photon detector, R&D update.
THGEM: Introduction to discussion on UV-detector parameters for RICH
Same geometry, but different size of the rim
Some proposals on HV circuits realization for segmented straw detector
Numerical simulations on single mask conical GEMs
THGEM report – january, 22nd 2009
Presentation transcript:

1 Fulvio TESSAROTTO CERN, 23/04/ Contribution from Trieste UPDATE ON TRIESTE LAB. ACTIVITY The set-up to measure currents THGEM prototypes from ELTOS First measurements on 4 pieces Chamber for prototype test The set-up to measure signals Fulvio Tessarotto

2 Fulvio TESSAROTTO CERN, 23/04/ Contribution from Trieste The HV power supply We used for this measurement one channel of the CAEN N471A power supply, reading the voltage from the LED display ( +- 1 V ) and the current from the “current monitor” output (5 mV offset, 1 mV/nA) We checked the stability of the power supply by looking at signals on the HV output, using a HV cable, a 1 nF capacitor and Le Croy oscilloscope Typical ripple has ~ 30 μs period, 80 mV pp at HV=4kV, the ripple amplitude being roughly linear with voltage

3 Fulvio TESSAROTTO CERN, 23/04/ Contribution from Trieste Ripple on the oscilloscope

4 Fulvio TESSAROTTO CERN, 23/04/ Contribution from Trieste HV – Power Supply: Ripples HV= 2kV HV= 4kV Power Supply HV cable 1nF LEMOcable SCOPE

5 Fulvio TESSAROTTO CERN, 23/04/ Contribution from Trieste HV – Power Supply: Ripples Receiving a phone call

6 Fulvio TESSAROTTO CERN, 23/04/ Contribution from Trieste Home-made picoamperometer Implemented scheme CMOS Operational Amplifier: AD MΩ feedback resistor: VISHAY CNS020 ( %, ppm/ºC) 1 nF to 100 nF feedback capacitor 10 M protection resistor

7 Fulvio TESSAROTTO CERN, 23/04/ Contribution from Trieste The home-made picoammeters Several temporary arrangements were tested for the home- made picoamperometers, using solderless breadboard, micro pcb on ceramic insulators and customly designed pcb’s for home-made picomaperometers - When powered by batteries they work fine at HV (tested up to 8kV), with stable offsets <10 pA - Using a battery + resistor current source of ~60 pA we checked that the reading was correct at few pA level; the ultimate resolution is still to be determined At ground, the agreement between Keithley measurements and home-made picoammeters values is roughly 1pA

8 Fulvio TESSAROTTO CERN, 23/04/ Contribution from Trieste CMOS Operational Amplifier: AD 8607

9 Fulvio TESSAROTTO CERN, 23/04/ Contribution from Trieste First tests of the set-up 1) PS – cable1 – PA – cable2 Oscillations with amplitudes proportional to L x V (cable length x PS voltage; no oscillations with PS off). 2) PS – cable1 – PA1 – cable2 – THGEM – cable3 – PA2 Oscillations are the same on PA1 and PA2 Decision: redundancy, shortest possible cables, design final set-up but start measurements before it is ready

10 Fulvio TESSAROTTO CERN, 23/04/ Contribution from Trieste

11 Fulvio TESSAROTTO CERN, 23/04/ Contribution from Trieste

12 Fulvio TESSAROTTO CERN, 23/04/ Contribution from Trieste What we observed Power Supply Box with ThickGEM – no holes

13 Fulvio TESSAROTTO CERN, 23/04/ Contribution from Trieste

14 Fulvio TESSAROTTO CERN, 23/04/ Contribution from Trieste Reading the voltmeters We decided to register picoammeter redings by saving pictures of the displays CANON Camera programmed to shoot every 2 seconds: this allows registering measurements and all intermediate operations done by humans From picture analysis the images on LED displays are translated into numbers (~ pictures so far) This solution avoids electrical connections to the acquisition system

15 Fulvio TESSAROTTO CERN, 23/04/ Contribution from Trieste

16 Fulvio TESSAROTTO CERN, 23/04/ Contribution from Trieste THGEM prototype geometry Size of active area: 30mm x 30 mm Thickness: 0.4 mm Holes diameter: 0.4 mm Pitch: 0.8 mm diameters Material: R-1566 Panasonic (halogen free, anti CAF) Cu thickness: 35 μm

17 Fulvio TESSAROTTO CERN, 23/04/ Contribution from Trieste Summary table Nam eDrilling 0.4 mmRim 1 (μm)Rim 2 (μm)rim productionmaterial M1Y00NOPanasonic M2Y250DrillingPanasonic M3Y500DrillingPanasonic M4Y1000DrillingPanasonic M5Y50 Two Sides DrillingPanasonic RNO Panasonic RINO Isola C1Y10 EtchingPanasonic C2Y25 EtchingPanasonic C3Y50 EtchingPanasonic C3IY50 EtchingIsola C4Y100 EtchingPanasonic C5Y10 Laser + EtchingPanasonic C6Y50 Laser + EtchingPanasonic C7Y10 Global EtchingPanasonic We received 10 samples per type

18 Fulvio TESSAROTTO CERN, 23/04/ Contribution from Trieste Documentation example C3

19 Fulvio TESSAROTTO CERN, 23/04/ Contribution from Trieste The FR4 material

20 Fulvio TESSAROTTO CERN, 23/04/ Contribution from Trieste

21 Fulvio TESSAROTTO CERN, 23/04/ Contribution from Trieste

22 Fulvio TESSAROTTO CERN, 23/04/ Contribution from Trieste

23 Fulvio TESSAROTTO CERN, 23/04/ Contribution from Trieste

24 Fulvio TESSAROTTO CERN, 23/04/ Contribution from Trieste

25 Fulvio TESSAROTTO CERN, 23/04/ Contribution from Trieste Procedure THGEM prototypes are kept under vacuum before and after measurement Handling is done with polyethylene gloves only Mounting at the centre of the test box, soldering cables and screwing nylon screws on ~5 cm nylon columns: ~ 10 min HV provided to “TOP” of THGEM prototype, “BOTTOM” at ground (some field above while no field below THGEM) Flushing with N2 at ~20 l/h for more than 3 hours before switching HV on

26 Fulvio TESSAROTTO CERN, 23/04/ Contribution from Trieste

27 Fulvio TESSAROTTO CERN, 23/04/ Contribution from Trieste

28 Fulvio TESSAROTTO CERN, 23/04/ Contribution from Trieste

29 Fulvio TESSAROTTO CERN, 23/04/ Contribution from Trieste Maximum voltage in N 2 V max : highest value of HV which has been applied for more than 3 min without discharges. Preliminary conclusions: C3 seems to be the worst (50 μm) C4 seems to be the best (100 μm) E1 and M5 are very good M1 and M4 are similar Reversing M4 rim makes a difference We provide negative voltage to the “top” of the THGEM

30 Fulvio TESSAROTTO CERN, 23/04/ Contribution from Trieste We are building a more compact set-up Box for 4 THINGS - HV connectors will be on the back side PCB OEM44 voltmeter Connectors for batteries Resistor (10Mohm) Capacitor (10nF) OA - AD8607 Guarding “ring” Connectors for OEM44 voltmeter

31 Fulvio TESSAROTTO CERN, 23/04/ Contribution from Trieste Test of analog r/o chain  Single photon signals are generated by a picosecond laser providing ~20 ps long pulses and a correlated timing signal  Laser amplitudes are reduced by geometric selection and laser tune down to a probability of 95% no photon pulses.  One pixel of a Hamamtsu R M16 MAPMT is used to provide signal to our analog r/o chain through a resistive divider (reducing the signal by a factor 4).  The ORTEC 142 preamp coupled to the ORTEC 450 amplifier and the CAEN N957 was used to collect amplitude spectra  a rough calibration was performed for several gain factors, showing evidence of non linearities for large signals: only signals in the linear range have been used  Spectra were taken at various gains and combined in a single plot to increase the dynamic range of the measurement

32 Fulvio TESSAROTTO CERN, 23/04/ Contribution from Trieste Single photon amplitude spectra from MAPMT

33 Fulvio TESSAROTTO CERN, 23/04/ Contribution from Trieste THGEM test chamber

34 Fulvio TESSAROTTO CERN, 23/04/ Contribution from Trieste

35 Fulvio TESSAROTTO CERN, 23/04/ Contribution from Trieste Very first spectrum of THGEM signals from Fe source seen in TS

36 Fulvio TESSAROTTO CERN, 23/04/ Contribution from Trieste

37 Fulvio TESSAROTTO CERN, 23/04/ Contribution from Trieste