GE Energy Effective Operation and Maintenance of Wind Turbines Through Use of Advanced Services Technologies Philippe Kavafyan GE Energy February 2006.

Slides:



Advertisements
Similar presentations
Total Productive Maintenance
Advertisements

Introduction Build and impact metric data provided by the SGIG recipients convey the type and extent of technology deployment, as well as its effect on.
VSE Corporation Proprietary Information
Oil Analysis Implementation Strategy J. Mike Weiksner BSME - Auburn University Years in Industry (EMO) Hold Certifications in Vibration & Oil.
Vendor Briefing May 26, 2006 AMI Overview & Communications TCM.
© 2010 Critical Materials. STRUCTURAL SYSTEMS HEALTH MANAGEMENT Critical Materials short presentation (who are we?) 3 PRODDIA® Wind arguments (why Proddia®?)
Impact of Business Analytics on Supply Performance: A Caribbean Perspective Inter-American Supply Chain Forum March 15-16, 2012 Presenter : Mushtaq Mohammed.
Arklow - GEWE 3.6 MW Offshore Project Lessons Learned
Levetidsforlengelse av Existerende felt Oppgradering av kontrollsystemer subsea Erfaringer og losninger fra Tordis og Vigdis February 8 th 2012.
© ABB Group May 15, 2015 | Slide 1 The MotorAdvantage – how to save UK industry Steve Ruddell, Division Manager, Discrete Automation and Motion, ABB Ltd.
Line Efficiency     Percentage Month Today’s Date
ABB Reliability Fingerprint
Prof. Seppo Virtanen TUT PURESAFE Final Conference Tuesday 20 January 2015, 14:20 – 14:40 RAMS Methods and Tools: From LHC to FCC.
Chapter 10 Systems Operation, Support, and Security
Enhancing Paper Mill Performance through Advanced Diagnostics Services Dr. BS Babji Process Automation Division ABB India Ltd, Bangalore IPPTA Zonal Seminar.
WEATS O&M Issues Sandy Butterfield CEO Boulder Wind Power WEATS
Copyright notice General presentation Siemens Wind Power Reliability Assessment and Improvement through ARM Modeling Poul Skjærbæk, Thomas Mousten, Henrik.
TIMKEN Bearing Diagnostics and Prognostics Using PI Reducing Unplanned Downtime Rich Browner - Program Manager Reliability Solutions The Timken Company,
Computerised Maintenance Management Systems
Wind Program Peer Review Drivetrain Development and Reliability Sandy Butterfield 5/10/2006 Need pictures.
Master-Untertitelformat bearbeiten Life cycle services Improving productivity of processes and applications Jukka Palmunen, Low voltage drives, September.
Motor Management Basics What Needs to be Managed Motor Life Cycle Measuring Motor Reliability Managing Condition Information Data Mining for the big Reliability.
Market Analysis & Forecasting Trends Businesses attempt to predict the future – need to plan ahead Why?
Smart Grid Technologies Damon Dougherty – Industry Manager.
Fleet Performance and Reliability in Generation Utilities
EWEC Athens Opportunities in Outsourcing O&M 01 March 2006.
Leveraging Big Data to Drive Big Changes in a Big Way Don Guckert, P.E., APPA Fellow Associate Vice President & Director of Facilities Management The University.
Frankfurt (Germany), 6-9 June 2011 EL-HADIDY – EG – S5 – 0690 Mohamed EL-HADIDY Dalal HELMI Egyptian Electricity Transmission Company Egypt EXAMPLES OF.
Phoenix Convention Center Phoenix, Arizona Solution Showcase GSA’s NDER Program: Doubling the Energy Savings from Financed Projects Kevin Vaughn Schneider.
Empowering Business in Real Time. © Copyright 2009, OSIsoft, LLC. All rights Reserved. Value of Partnerships and Collaboration for World Class Performance.
Commissioning of New and Existing Buildings Alexander P. Boucher, P.E., CEM, LEED BD+C.
Last days of suppliers hegemony: customer driven market has come Athens, March 1 st, 2006 Ester Cámara Operations Manager Iberdrola Renewables Energies.
Glen Fields - Final Project Presentation. What Sets CSI Apart... GBA 573 Consultants Company Background Located in San Diego, CA 5 Engineering Consultants.
Life cycle services for automation products
Confidential and proprietary information of Ingram Micro Inc. — Do not distribute or duplicate without Ingram Micro's express written permission _.
Performance Lifecycle Maintenance
IT Priorities Minimize CAPEX Maximize employee productivity Grow the business Add new compute resources real- time to support growth Meet compliance requirements.
Copyright © 2015 Rockwell Automation, Inc. All Rights Reserved. Copyright © 2014 Rockwell Automation, Inc. All Rights Reserved. Empowering Smart Machines.
Computerised Maintenance Management Systems
How can collaboration be improved ? - can research collaboration facilitate growth for sub-suppliers? Kenneth Thomsen DTU Wind Energy Ane Holck DTU Innovation.
Network management Network management refers to the activities, methods, procedures, and tools that pertain to the operation, administration, maintenance,
Modern Maintenance. Management
IBM Maximo Asset Management Doug Wood, Architect Tivoli CTO’s Office COBie CMMS/CAFM Challenge121-Dec-11.
Equipment Life Optimization Program (ELOP) Doug Hilleman February 10, 2011.
Department of Defense Voluntary Protection Programs Center of Excellence Development, Validation, Implementation and Enhancement for a Voluntary Protection.
Distribution Automation The utilization of IEDs (Intelligent Electronic Devices) and advanced communications to unlock the benefits of operational efficiency.
© 2015 Water Research Foundation. ALL RIGHTS RESERVED. © 2015 Water Research Foundation. ALL RIGHTS RESERVED. No part of this presentation may be copied,
People. purpose. performance. Todd County Schools October 30th, 2013.
Business Intelligence Energy, Resources and Utilities.
CURRENT ® Smart Grid Overview July SMART GRID = ENHANCED FUNCTIONALITY Smart Grid delivers more than advanced metering infrastructures: -safe.
Logistical Efficiency with Dedicated Energy Crops
Blade Life Cycle Management A New Approach to a Critical Asset
Wind Composite Services Group/WindCom
Jan 2016 Solar Lunar Data.
INSPECTIONS AND PREVENTIVE MAINTENANCE
Increasing Reliability Through
The Internet of Things (IoT) and Analytics
Center for Advanced Life Cycle Engineering (CALCE)
Fans & Heaters technical seminar
SALES: HOW TO USE THIS PRESENTATION
Vibration Measurement, Analysis, Control and Condition Based Maintenance 14 Predictive maintenance Dr. Michiel Heyns Pr.Eng. T: C: +27.
Equipment Monitoring Market
Enron Energy Services Energy Management Outsourcing Overview
Across the entire value chain
Operation & Maintenance
Gantt Chart Enter Year Here Activities Jan Feb Mar Apr May Jun Jul Aug
PSPG Service Product Management, Marc Antoine
Fertilizer Industry Safety Information Analysis and Sharing Program
How Small Developers and EPC Contractors Can Add PPA Financing to their Arsenals John Langhus, VP Business Development Midwest Solar Expo 2019 New Energy.
Preventive Maintenance Service Agreement
Presentation transcript:

GE Energy Effective Operation and Maintenance of Wind Turbines Through Use of Advanced Services Technologies Philippe Kavafyan GE Energy February 2006 Athens, Greece

2 GE Energy - PhilippeKavafyan February % Wind Project IRR is allocated to risks associated with variances in energy production and cost of O&M Unplanned ~70% Service Access Crane Cost Material Cost Labor Cost O&M Costs A Significant Portion of COE Large Variance Cost Variance Decreased Availability Decreased Production Decreased Revenue Planned ~30% Cost-of-Energy O&M WTG, BOP & Other … A Comprehensive O&M Strategy is Critical to Successful Project Economics

3 GE Energy - PhilippeKavafyan February 2006 O&M Cost Variability Driven By Product Reliability Life-cycle Reliability Has Large Impact on O&M Costs Planned O&M can vary from 10% to 35% of total cost Offshore Access … jack up barge, weather, etc. add additional cost and variance Offshore Access Unplanned O&M Planned O&M Wind Turbine Reliability 14X10X Total O&M Cost … Unplanned O&M Cost Significantly Impacted by Component Reliability

4 GE Energy - PhilippeKavafyan February 2006 Production Impact from Unplanned Events … Accessibility Key to Managing Impact of Unplanned Events Wind Turbine Availability Event Availability (%) Event 1:Remote Resolution Event 2:Requires WTG visit & small component replacement Event 3:Requires WTG visit, major component replacement w/ jack upbarge Max Wave Height - by Month JUL AUG SEP OCT NOV DEC JAN FEB MAR APR MAY JUN Wave Height (m) Access Threshold Event 1 Event 3 Event 2 Unplanned Downtime Annual Energy Production Event MW-Hrs

5 GE Energy - PhilippeKavafyan February 2006 Reduce risks to revenue & costs from turbine failures Current Realistic Additional Costs after Warranty Expires Realistic Loss Revenue due to Increased Wear & Tear and Failure Rates, which results into reduced Availability Revenue Year 0 20 Customer View Revenue O&M Costs $ Year 0 Customer View 2 Profit

How is GE addressing this challenge?

7 GE Energy - PhilippeKavafyan February 2006 Apply Services Best Practices Power PlantMedical Equipment Industrial Equipment Aircraft EnginesLocomotives GE Services > 30,000 Major Equipment Under Service Worldwide > 100 Services- related patents Creating New Services Technologies For ~ 20 Years Equipment Services & Products Performance Optimization Services Smart Services Equipment Support Anomaly Detection Condition Assessment Diagnostics & Troubleshooting Repairs & Upgrades Contract Performance Parts Life Management Asset Management Performance & Availability Guarantees Equipment Upgrades Plant Energy Management Increasing Customer Value 

8 GE Energy - PhilippeKavafyan February 2006 Revenue  COE  Reliability  Availability  Production  Customer Benefits Enhanced Offshore Equipment Designs Advanced Controls for Load Mgmt & Performance Design for Serviceability Product Reliability (Prevention) Service Technologies for Effective O&M High Quality Planned & Unplanned Maintenance O&M Asset Management EHS Trained Field Services 24/7 Remote Operations, Monitoring and Diagnostics Predictive & Condition Based Maintenance Contractual Services/Warranty Mgmt Product / Customer Support Reliability & Performance Modifications & Upgrades Continuous Improvement … Multi Pronged Service Approach Required

9 GE Energy - PhilippeKavafyan February 2006 Goal: Design turbines to deliver very high availability …. Breaks Down Rarely Approach: Utilize “Design for Reliability” & Serviceability Extended FMEA analysis to define causal events and impacts of failures Physics-based Reliability Models to understand true design and operational limits Redundancy of selected components to reduce availability impact of failures Advanced Controls for Load Management & Performance enhancement Serviceability Product Reliability (Prevention) Physics-based Models Extended FMEAs Advanced Controls

10 GE Energy - PhilippeKavafyan February 2006 Goal: Increase Availability….Minimize Field Costs…. Increase Customer Value Product / Customer Support Approach: Customer Support Centers 24/7 Remote Operations, Monitoring and Diagnostics Automated Fault Notification California Germany Shanghai Atlanta HQ Support Centers Next 21 Faults Rest Collective fault pitch controller Undervoltage Blade pitch control dev. 3 pitch controller faults Pitch Overrun 90° Wind Deviation Timeout pitch controller Error 180: „Wind deviation“ NO Remote Control Are the parameters 7.5 and 7.6 at the correct values? Remote Control Log the alarm in the Access database NO YES END NO Remote Control Need further investigation depending on the following errors Remote Control Change the parameters YES Remote Control Is the PLC software version recent? YES Remote Control Is there any of the non-resetable errors in the turbine status? Service Team Go on the site and change the PLC software. Remote Control Is the status OK in thewtg status? YES NO Remote Control Further investigation is needed (snapshot). There might be following errors in theturbine status. NO Major Faults Detailed Diagnosis Faults Handling Procedures Next 21 Faults Rest Collective fault pitch controller Undervoltage Blade pitch control dev. 3 pitch controller faults Pitch Overrun 90° Wind Deviation Timeout pitch controller Next 21 Faults Rest Collective fault pitch controller Undervoltage Blade pitch control dev. 3 pitch controller faults Pitch Overrun 90° Wind Deviation Timeout pitch controller Error 180: „Wind deviation“ NO Remote Control Are the parameters 7.5 and 7.6 at the correct values? Remote Control Log the alarm in the Access database NO YES END NO Remote Control Need further investigation depending on the following errors Remote Control Change the parameters YES Remote Control Is the PLC software version recent? YES Remote Control Is there any of the non-resetable errors in the turbine status? Service Team Go on the site and change the PLC software. Remote Control Is the status OK in thewtg status? YES NO Remote Control Further investigation is needed (snapshot). There might be following errors in theturbine status. NO Major Faults Detailed Diagnosis Faults Handling Procedures Major FaultsDetailed Diagnostics Expertise-based Fault Resolution Remote Communication Reliability

11 GE Energy - PhilippeKavafyan February 2006 Reliability-Based Preventive Maintenance Strategy Approach: Efficient Risk Allocation Contractual Services/Warranty Mgmt Predictive & Condition Based Maintenance Shift Planned Maintenance to Low Wind Period Use Reliability Models to Drive Maintenance Intervals for Optimal Performance Use Site-specific Maintenance Factors to Assess Damage Accumulation Goal: Reduce Unplanned Maintenance … Increase Production

12 GE Energy - PhilippeKavafyan February 2006 measurementforecast Total Cumulated Number of Metallic Particles > 200 Microns in Gearbox Oil Approach: Gearbox Metallic Particle Monitoring total loss of gearbox Condition Based Maintenance Goal: Increase Damage Predictability planetary bearing inspection outer ring rollerrotor side bearing middle baring 11. Jun 04 June ‘04 rollerrotor side bearing middle bearing Oct ‘04 rotor side bearing Aug ‘05

13 GE Energy - PhilippeKavafyan February 2006 Offshore Access Systems Commissioning Regular O&M duties Overhaul tasks Access/Weather Modeling Jack-up Barge Logistics Service Friendly Equipment Asset Management Offshore Field Services Project% Wave Height > 2.0 Meters Project 148% Project 23.5% Project 38.1% Goal: Effective Access System & Logistics for rapid field response

14 GE Energy - PhilippeKavafyan February 2006 Product Continuous Improvement Approach: Identify Opportunities Fleet Reliability and Availability Metrics Goal: Increase Reliability & Production Capability Through Modifications and Upgrades z y x Adaptive Drive Train Damper Control Upgrade Power & Performance Uprate Fleet Faults & Root Cause Analysis Residual Life Prediction Tools Introduce Modifications and Upgrades from RCA & New Technology Development

15 GE Energy - PhilippeKavafyan February 2006 Why Services Agreement with OEM? More efficient risk allocation between the Owner and OEM (Original Equipment Manufacturer)  Owner Keeps Commercial Risk (Wind Risk, Energy Pricing)  OEM takes on Equipment & Performance Related Risks OEM is in the best position to manage this risk in a cost effective manner  Design and Manufacturing expertise  Built-in incentives to maximize return on investment for the owner – a partnership arrangement  Benefits from new products & technology development

Effective O&M is Critical for Reducing Project Risks Unplanned Maintenance Drives Variation in Cost & Loss in Production GE focused on developing Services Technology … key to cost effectively managing O&M Summary

"Effective Operation and Maintenance of Wind Turbines Through Use of Advanced Services Technologies" GE Energy Philippe Kavafyan GE Energy February 2006 Athens, Greece