Urban Storm Drain Design: Pump Station Design. Purposes To lift stormwater to higher elevation when discharge of local collection system lies below regional.

Slides:



Advertisements
Similar presentations
Storage Reservoirs for Urban Water Supply/Chapter 9 LowLift Intake Conduit Treatment High Lift ConveyanceConduit DISTRIBUTIONRESERVOIR Distribution Supply.
Advertisements

Flood Profile Modeling with Split Flows and Weirs
InfoWorks CS Enables Design of Hybrid Pressure/Gravity Sewer Systems
WinTR-20 Course February Muskingum-Cunge Flood Routing Procedure in NRCS Hydrologic Models Prepared by William Merkel USDA-NRCS National Water Quality.
1 Urban Drainage System Analysis & Design CEVE 512 Hydrologic Design Lab Spring 2011.
Module 5: Storage Concepts Theodore G. Cleveland, Ph.D., P.E, M. ASCE, F. EWRI October 2013.
Urban Storm Drain Design: Curb inlets, on grade & sag
Using HEC-1 for Subdivision Runoff Detention Pond Design Stacie Kato April 26, 2004.
Energy Savings from Supplying Drinking Water at Two Pressure Levels - a Retrofit in Las Delicias, El Salvador, EWB-MAP Presented by Adam A. Brostow November.
CHARACTERISTICS OF RUNOFF
Engineering Hydrology (ECIV 4323)
Experience with SuDS in Dublin December 2007 Padraig Doyle Senior Project Manager Mott MacDonald Pettit IEMA Conference Are SuDS the answer for drainage?
CE 515 Railroad Engineering
Hyetographs & Hydrographs
CE 3372 Water Systems Design
CE 3372 Water Systems Design
Infiltration Infiltration is the process by which water penetrates from ground surface into the soil. Infiltration rate is governed by: rainfall rate hydraulic.
Reading: Applied Hydrology, Sec 15-1 to 15-5
CE 3372 Water Systems Design
Wes Marshall, P.E. University of Connecticut May 2007 CE 276 Site Design Final Exam Outline.
Engineering Hydrology (ECIV 4323)
Energy Savings from Supplying Drinking Water at Two Pressure Levels - a Retrofit in Las Delicias, El Salvador, EWB-MAP.
Wastewater generation
Estimating Qmax Using the Rational Method
WinTR-20 Project Formulation Hydrology Computer Program Basic Input and Output Presented by: WinTR-20 Development Team.
WinTR-20 Project Formulation Hydrology Computer Program Basic Input and Output Presented by: WinTR-20 Development Team.
Fact : Storm water is an important natural resource that should be used to replenish our Groundwater.
CE 3372 Water Systems Design
CTC 450 Review 1  WW Characteristics. Objectives 2  Understand the basics of storm drainage systems  Understand the basics of sewer systems.
Watershed Management Water Budget, Hydrograph Analysis
Flood Routing 2 Review of Energy Conservation Energy Grade Line Gradually Varied Flows, Head Loss Runge-Kutta Routing.
FLOOD ROUTING.
Urban Water Department of Hydro Sciences, Institute for Urban Water Management Peter Krebs Dresden, Global water aspects 1 Introduction to urban.
1 II. Sewer Networks and Facilities Topic. II. 12. Detention (Retention) Basins: Kinds and Structures. Sewerage Pumping Stations Detention Basins: Kinds.
Urban Storm Drain Design: Rainfall-Runoff relations.
March 2009WinTR-20 Course1 Muskingum-Cunge Flood Routing Procedure in NRCS Hydrologic Models Prepared by William Merkel USDA-NRCS National Water Quality.
Diversion of Flood Water from Ganga at Kanpur.  Introduction  Study Area  Flow Pattern of Ganga at Kanpur  Quantification of Divertible Flood  Downstream.
STORMWATER MANAGEMENT
Urban Storm Drain Design: Multiple Pumps. Multiple Pumps The HDM and FHWA recommend more than one pump Redundancy Flexibility Ability to manage flows.
Urban Storm Drain Design: Pump Performance Curves.
CE 3372 Water Systems Design
Penny Coombes Sarah Wharton Gary Davies Simon White River Bee, Desing FLOOD ALLEVIATION FEASIBILITY.
CE 3372 Water Systems Design Lecture 17: Storm sewers, inlets, conduits and related hydrology and hydraulics.
CE 3372 Water Systems Design Lecture 18: Storm sewers, inlets, conduits and related hydrology and hydraulics.
CE 3372 Water Systems Design
Urban Stormwater Management D Nagesh Kumar, IISc Water Resources Planning and Management: M8L6 Water Resources Systems Modeling.
Lesson Understanding Soil Drainage Systems. Interest Approach Ask students the question, “What determines how fast water will flow through a funnel?”
Basin-Specific Feasibility Studies, ECP Basins Evaluation of Alternatives Basin-Specific Feasibility Studies, ECP Basins Evaluation of Alternatives August.
CTC 450 Review 1  WW Characteristics. Objectives 2  Understand the basics of storm drainage systems  Understand the basics of sewer systems.
Sanitary Engineering Lecture 4
Basic Hydrology: Rainfall-runoff based methods – III
Basic Hydrology & Hydraulics: DES 601
VALVES IN PIPE LINES.
Detention Basics
CONTENTS 1. Intakes for Collecting Surface Water Page no. (1) (3) (5)
Routing-Hydrologic and Hydraulic
CTC 450 Review WW Characteristics.
CE 3372 Water Systems Design
Stormwater Conveyance Design 2
CE 3372 Water Systems Design
Channel Routing Simulate the movement of water through a channel
FLOOD ROUTING Topic 5 River/Stream Routing Muskingum Method.
CEE 3430 – Engineering Hydrology David Rosenberg March 26, 2012
Highway Drainage: Determining Flow Rates
Detention Routing.
Flood Routing & Detention Basin Design
Hyetographs & Hydrographs
Floods and Flood Routing
Preciptation.
4.6 Cavitation Since NPSHav. is the absolute pressure available less the vapor pressure of the liquid, the NPSHav. should always be greater than the NPSHreq.
Presentation transcript:

Urban Storm Drain Design: Pump Station Design

Purposes To lift stormwater to higher elevation when discharge of local collection system lies below regional conveyance. To lift stormwater to higher elevation when terrain or man-made obstacles do not permit gravity flow to discharge point.

Pond and pump station

Types Submersible Lower initial cost Lower capacity Smaller footprint Wet-well / dry-well Higher initial cost Easier inspection/ maintenance

Submersible lift station

Wet-well / dry-well lift station

Design criteria Size the pumps and the wet-well (sump) storage capacity to accommodate inflow variability and detention time limits. Match the pumps to the flow and head requirements. Provide ‘near-absolute’ reliability Automated controls Redundant systems Alarms Regularly scheduled, preventive maintenance Assess and mitigate environmental factors Flood risk, noise pollution, visibility

Site plan and facilities Protected and accessible during a major flood Redundant power supplies Intruder-resistant with controlled access

Height Inflow pipe elevation Ground elevation Excavation costs Cross section Constant Variable Wet-well (sump) dimension design

Pump capacity Greater than average flow Less than the maximum flow Depends mainly upon Inflow variability Marginal costs of increasing sump volume

Introduction to FHWA-HDS Detailed “how-to” Reviews hydrology Reviews hydraulics

Pump System Hydraulic Operation 1)Runoff enters the collection system and is conveyed to the storage unit and wet well of the pump station. For a period of time there is no outflow as the runoff is stored within the storage unit and wet well. 2)The water level in the wet well rises and a hydraulic gradient develops based on the rate of inflow, the water level in the wet well, and the conveyance capacity of the storage unit and collection system. 3)The first pump starts when the water level in the wet well reaches a specific elevation. The pump evacuates the flow at a rate that varies with the pump characteristics and total dynamic head.

Pump System Hydraulic Operation 4)The inflow rate will vary as defined by the inflow hydrograph. If the pumping rate is lower than the inflow rate, the water level in the storage unit and wet well continues to rise and the volume stored in the system increases. 5)Additional pumps start at predetermined elevations as the water level rises. 6)At some point, the inflow rate will be lower than the total pumping rate. The water level in the wet well drops as water is evacuated from storage.

Pump System Hydraulic Operation 7)At preset elevations, as the water level drops, individual pumps are stopped and the discharge rate drops accordingly. 8)When the water level drops to the minimum level required for submergence, the last pump is stopped. The last pump off is usually the first to have been switched on, although different switching schemes are feasible.

Lift Station Design Process Design criteria include: Design frequency Peak outflow Station type Design philosophy Minimum storage volume Maximum allowable highwater Discharge velocity Criteria must be established before design of storage and pump system (FHWA-HDS pg 4-9)

Lift Station Design Process Hydrologic Analysis: Drainage boundary and area Runoff characteristics Design runoff hydrographs Cumulative inflow

Lift Station Design Process Trial Pumping Configuration: The design is typically iterative Minimum of two pumps recommended

Lift Station Design Process Hydrologic/Hydraulic Analysis/Estimates Inflow hydrograph Inflow mass curve Stage-storage relationship Trial pump/switching scheme Mass curve routing System head curves Pump selection/operation

Hydrographs – review A hydrograph is a graphical representation of discharge (volume/time) with time The area under the hydrograph curve represents the total volume of runoff during the time represented The highest point on the graph is the peak discharge

Hydrographs – review

Storage Storage is collection system, plus any sump (wet well) on suction side of lift station.

Time distributed discharge Route inflow hydrograph through lift station (and collection system) to generate the time distributed discharge.

Inflow Hydrographs Suggested design AEP is 2% (50-yr) NRCS DUH is the typical method (Chapter 4, HDM) Modified rational is an option.

Basic assumptions Pump station hydrologic design is conceptually identical to reservoir routing design Inflow-outflow=change in storage Inflow is the hydrograph produced by the storm sewer system Outflow is derived from the sump geometry (stage/storage) and Pump Performance Curves for the pump or pumps in the station