Herring River Restoration Project “Return of the Tide” Low-Lying Roads 0% Design Public Meeting February 4, 2015 www.friendsofherringriver.org.

Slides:



Advertisements
Similar presentations
Siskiyou County Land Development Manual 2006 Update Planning Commission Hearing Land Development Manual Update.
Advertisements

401 Water Quality Certification South Carolina Department of Health and Environmental Control.
Update on FHWA/FTA Proposed Rulemaking. MAP-21 Requirements Section 1318(a)(3) o Solicit requests from state DOTs, transit authorities, and MPOs, for.
Gold Ray Dam Interagency Technical Team Meeting. NEPA Update Deconstruction Plans Hydraulic Modeling Next Steps Agenda.
Impacts of Inland Activities on our Estuaries: Mitigation, Improving, and Reverting the Impacts of the Past, Present, and Future.
Dam Removal in Rhode Island: Present and Future David Chopy, DEM July 16, 2009.
Public Information Meeting #6 City of Fargo Flood Risk Reduction Projects Rose Creek Coulee October 9, 2012.
Program Outline Restoration Project Update Welcome and Introduction (Don Palladino) Town of Wellfleet Role (Dale Donovan) Overview of Herring River Restoration.
Mordecai Lincoln Dam & Hunters Pond, Scituate, MA
Proposed Replacement of the Herbert C. Bonner Bridge (Bridge No. 11) on NC 12 over Oregon Inlet TIP Project No. B-2500 Citizens Informational Workshops.
Pine Valley Country Club Stream Restoration: Phase 2 Proposal Presented March 17, 2003 Greg Jennings, NC State Univ Barbara Doll, NC Sea Grant Dave Bidelspach,
Bayou Dupont Sediment Delivery – Marsh Creation #3 (BA-164)
Regional View Ballona Creek Watershed December 19, 2003 Area A & part of Area B (192 acres total) purchased for $139 million (Prop 50 funds) Area B.
Northeast Corridor Greenway Acquisition – Mitigation Feasibility Study Results City Council Workshop June 24, 2014.
Breaching the Mahar Regional School Dam Presentation to Ralph C. Mahar Regional School Committee GZA GeoEnvironmental, Inc. February 9, 2011.
SAN FRANISCO BAY By: Randall Alcorn. Golden Gate Bridge.
Compensatory Mitigation in Coastal Louisiana Keith Lovell, Administrator Office of Coastal Management Department of Natural Resources 10/03/121.
Breewood Stream Restoration Montgomery County Capital Improvement Project to Stabilize the Breewood Tributary November 14, 2012 Sligo Middle School.
Sustainable Water Infrastructure Ivy Anderson Andey Nunes.
Risky Business How to Assess our Risk AN INTERACTIVE SESSION ON COMMUNITY DECISION FRAMEWORK MODELS FOR CLIMATE ADAPTATION LOCAL SOLUTIONS: NORTHEAST CLIMATE.
1 Welcome! West Valley-Taylorsville Transit Corridor Draft Environmental Impact Statement Public Open House/Hearing July 19, 2006.
Risky Business How to assess our risk An Interactive Session on Community Decision Framework Models for Climate Adaptation Local Solutions: Northeast Climate.
OSU Airport – Overview of Master Plan and Draft Environmental Assessment Purpose of an Airport Environmental Assessment (EA) Identify environmental impacts.
COMPREHENSIVE FLOODPLAIN MANAGEMENT : Promoting Wise Uses of Floodplains CA Department of Water Resources/ CIFMCG Workshop July 2006.
Introduction to PA Act 167 Stormwater Management Planning Little Juniata River Watershed April 21, 2005.
Friends of Herring River Wellfleet & Truro, Massachusetts Annual Meeting August 21, 2012.
Modern Urbanized Stream Water Quality Improvement Technologies Creating a Net Zero Water Quality Impact Solution in the Natural Environment.
Watershed-based Plan To Restore the Hackensack Meadowlands: The Meadowlands Comprehensive Restoration Implementation Plan Terry Doss and Karen Appell The.
NEWS _menacehttp://news.yahoo.com/s/ap/climate_09_jellyfish _menace
Chumstick Creek Salmon Habitat Conditions* Land development, road construction, and other human activities have affected channel migration and sediment.
Icicle Creek Salmon Habitat Conditions* Land Development has affected stream channel movement, off channel habitat, and LWD recruitment. Barriers to migration.
Herring River Restoration Project “Return of the Tide” Friends of Herring River August 18,
Yakima-Tieton Irrigation District Agency Kickoff Meeting Tieton Canal Replacement Project June 16, 2015.
Greg Jennings, PhD, PE Professor, Biological & Agricultural Engineering North Carolina State University BAE 579: Stream Restoration Lesson.
Highway Location Study CE 453 Lecture 4 See also lab 2 and lab 4 instructions, and EIS lecture notes See also 04 DOT development process.doc Refs:
Urban Stormwater Retrofit Friendship Park – Winchester, VA K. Choi, K. Davis, and D. Laird Biological Systems Engineering, Virginia Tech Introduction Exposed.
WRAC Issues Workshop EAA/STA-2 Expansion Cell 4 April 11, 2005 Acceler8 Overview.
Stormwater Retrofitting: The Art of Opportunity Prepared by the Center for Watershed Protection.
Lower Taylor Creek Restoration Project Property Acquisition Seattle City Council - Seattle Public Utilities and Neighborhoods Committee June 9, 2015.
Three Rivers Levee Improvement Authority June 8, 2007 Presentation to the State Reclamation Board Proposed Feather River Setback Levee.
R. Hancock Sea Level Rise and the Conservation of Coastal Wetlands LOCAL SOLUTIONS: Northeast Climate Preparedness Conference May 20, 2014.
Coos Watershed Association Watershed Restoration Projects.
Stakeholders Meeting November 15,  Review the development and identification of State’s preferred alternative  Provide updates on SCH Project.
MIG 2 - Water Quality and Quantity Study Plan Review April 2, 2008.
Washington Thoroughfare Study Proposed Improvement of Washington Street Hainesville Road to Lake Street Lake County Hainesville Road Lake Street Washington.
Channel Rehabilitation Projects TAMWG - June ‘04 Trinity River at Hocker Flat 1/16/2003.
FIT ProposalApril 29, 2015 Levee & Dike Inventory Data Development and Creation of Statewide Geodatabase Photo: Outlier Solutions Inc. and Lighthawk Steve.
Phase I Engineering and Environmental Studies Project Development Flowchart US Route 45; IL Route 132 to IL Route 173 and Millburn Bypass CSS
Marin County Watershed Stewardship Program Marin County Department of Public Works.
NEWS _menacehttp://news.yahoo.com/s/ap/climate_09_jellyfish _menace
Assessing the Risk and Vulnerability of NH Coastal Communities to Sea Level Rise and Storm Surge FROM TIDES TO STORMS: PREPARING FOR NEW HAMPSHIRE’S FUTURE.
Herring River Restoration Project “Return of the Tide” Friends of Herring River August 19,
Harwich High School Environmental Studies. an interdisciplinary course that addresses real world an interdisciplinary course that addresses real world.
South Bay Salt Pond Restoration-- Challenges to Ecological Restoration.
Riparian Buffers And Their Role In Coastal Georgia By Jackie Jackson & Bethany Jewell Water Resource Planners.
Herring River Restoration Project Salt Marsh Declared shared commitment to investigate restoration of tide to the Herring River Established the.
Item 6b. Project Vicinity Park Ave Bridge Existing Park Avenue Bridge.
October 16, 2013 Mira Monte Marina PERMITTING MITIGATION UPDATE MIRA MONTE MARINA.
Texas Department of Transportation Corpus Christi District U.S. 181 Harbor Bridge Project Environmental Documentation and Schematic Development Public.
A summary of the work and programs of the Gulf of Maine Council on the Marine Environment.
For EBTJV meeting October 26, 2010 Executive Order Strategy for Protecting and Restoring the Chesapeake Bay Watershed.
Herring River Restoration Project “Return of the Tide” Concept for marsh level crossing at High Toss Road February 11, 2016 Council on Aging Wellfleet,
PAC Meeting July 2, Agenda  Introductions and thanks  Project to date  Next steps  Questions.
A summary of the values of the Gulf of Maine and contributions of the work and programs of the Gulf of Maine Council on the Marine Environment.
STOCKTON DELTA WATER SUPPLY PROJECT (DWSP) Final Environmental Impact Report (EIR) Certification Hearing November 8, 2005 Mark J. Madison, Director Municipal.
Tidal Wetlands and Shorelines in the Chesapeake Bay
Concept Plan for Proposed Park Near Hopewell School
FEMA and Stream Restoration
S.R. 26 Road Rehabilitation in Clinton County
STATE ROAD 61/369 CRAWFORDVILLE HIGHWAY
Presentation transcript:

Herring River Restoration Project “Return of the Tide” Low-Lying Roads 0% Design Public Meeting February 4,

Agenda Welcome and Introductions Purpose of the meeting Overview of the Herring River Restoration Project and Key Features of the Plan Low Lying Roads – What needs to be changed and why Discussion and public input Summary and Next Steps

Purpose of the Meeting To present information on the project To describe why Pole Dike, Old County and Bound Brook Roads need to be investigated and likely raised in specified areas and culverts replaced To hear public concerns, needs and questions for consideration during the design phase To prepare for the start of engineering and design of roadwork and culvert replacement

Why are we doing this project ? To restore self-sustaining tidally influenced natural habitats To achieve ecological and social benefits of a healthy and productive tidal marsh To stop the degradation of the marsh. With the restricted tidal flow we have today, the marsh will not stay the same To replace the deteriorating Chequessett Neck Road tide gates with an improved tide control structure

Restore nutrients that are needed for the productivity of the marsh, Wellfleet Harbor and Bay and coastal waters Improve water quality through tidal flushing Restore finfish and shellfish habitat and eel and herring runs Deposit sediment in the estuary to compensate for sea-level rise Replace existing degraded habitats with healthy tidally dependent vegetation Ecological Benefits

Social Benefits Reduce pollution (nitrogen, coliform bacteria) Improve water quality Restore harvestable finfish & shellfish areas lost when the dike was constructed 100 years ago Provide public access Enhance opportunities for recreation, boating, birding, fin and shellfishing Reestablish natural control of nuisance mosquitoes

Tidal Restoration The removal of existing restrictions in the river and its tributaries to allow controlled incremental return of natural tidal flow to and from the estuary.

Major Projects CNR Dike to be replaced Pole Dike Tide Control Structure High Toss Road Roadwork Mill Creek Dike

General Schedule 2015 – Final EIS & Record of Decision 2015 – Mitigation planning with owners of low lying property 2015 / 2016 – Continue engineering & prepare permit ready designs 2016 / 2017 – Obtain local, state and federal permits 2016 / 2017 – Secure project funding 2018 / 2020 – Construction

Elevate Roadways –Raise the elevation of low lying roads –Accessibility during large coastal storm events –Blend with existing grades/features (driveways) Replace Existing Culverts –Increase culvert capacity –Incorporate safety elements –Control gate Project Purpose

Study Area

Culvert/Gate Design –Safety Road Alignment Traffic Management –Construction phasing –Detour plans Drainage/Utilities Impact Minimization –Wetlands –Access/driveways Design Elements

Field Survey Wetlands Edge Verification Geotechnical Investigation –4 to 5 days of drilling Upcoming Field Work

Field Work: February 2015 Preliminary Design Plans: April 2015 Design Public Meeting: April 2015 Final Report: June 2015 Permit Plans: July 2015 Project Schedule

Design Elements –Safety –Drainage Points of Interest Road Usage Access to Private Property Discussion/Public Input

Friends of Herring River Board of Directors Barbara Brennessel Lisbeth Wiley Chapman Debby Freeman Joel Fox Jeff Hughes Alice Iacuessa Gary Joseph David Koonce Don Palladino Alan Platt John Portnoy Robert Prescott John Riehl Lynn Southey