2014 GSCMI Case Competition Team MECE Presentation Yejin Lee| Bumsun Ryu Saya Lee| Ryan Seongjin Shin.

Slides:



Advertisements
Similar presentations
Capacity Planning For Products and Services
Advertisements

Logistics Network Configuration
McGraw-Hill/Irwin Copyright © 2007 by The McGraw-Hill Companies, Inc. All rights reserved. 5 Capacity Planning For Products and Services.
Indian Ice-Cream Industry and Supply Chain Innovation at Geddy’s Team Kaizen Kurtis Homan Kongpon Kijnum Sudavee Nantavipaovng Afief Helmi Baasir 1 st.
Team Name: HMX Consulting 1 st Round Room: RAWLS :20pm – 3:40pm Malcolm Hooks Yueyi Ma Yidi Xu The ∙∙ Solution ∙∙ People.
Sustainable Growth Through Network Optimization Team Name: Q lean Yunyang Liu Jennifer Lu Hiroaki Tanaka Xueqing Wang.
Sustainable Growth of EATON’s Electrical Sector Optimization of the Distribution Network 1 Krannert School of Management Purdue University.
Consumer Packaged Goods Manufacturing Industry Team: Aymaras Pan American Advanced Studies Institute Simulation and Optimization of Globalized Physical.
Supply Chain Operations: Planning and Sourcing
Strategy, Balanced Scorecard, and Strategic Profitability Analysis
Supply Chain Logistics Management
Operations Management
Supply Chain Management COSC643 E-Commerce Supply Chain Management Sungchul Hong.
Network and Operational Planning
1 The Supply Chain Supplier Inventory Distributor Inventory Manufacturer Customer Market research data scheduling information Engineering and design data.
Eaton – Power Management
Team Rowland Presenter 1: Elizabeth Rowland (E.R.) Presenter 2: Juan Guerrero (J.G.) Presenter 3: Tarun Aggarwal (T.A.) Presenter 4: Norihiko Hosokawa.
EATON CORPORATION Askar AubakirovJialu HuangKenny ChongPranav Gupta.
Chapter 3 Supply Chain Drivers and Obstacles
Supply Chain and Logistics Management
ISQA 407 Introduction to Global Supply & Logistics Management Winter 2012 Portland State University.
Slides 6 Distribution Strategies
Eric Beardmore Brendan Bonner Kevin Leung Anne Marie Sullivan.
Copyright © 2013 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin CHAPTER 13: Operation Analysis.
Logistics McGraw-Hill/Irwin
Restructuring supply chain & assuring sustainable quality Geddy’s Ice-Cream Team Name: Eclipse Consulting 1 st Round Room____3097______ Abhishek Pandey.
GSCMI 2013 Case Competition 1 Sustainable Growth through Network Optimization Team Name: Consolidated Consulting Carson Corporon Xinlei Fan Petra Ghicu.
Supply Chain analysis at Purdue University Team Name: Panda Elites Xian Zhu Junming Liu Yu He Yangon Chen.
Inventory Management and Risk Pooling (1)
SCM-INTRODUCTION P.CHANDIRAN. What is a Supply Chain? Supply chain is a network of suppliers, manufacturing plants, warehouses, distribution centers,
Supply Chain Innovation at Geddy’s Asia - Pacific Consulting Group 1 st Round Room 4009 Momo (Chenyang) Liu Luis Carnero Randall (Jie) Miao Jun Karamon.
Sustainable Growth through Network Optimization Team 6 Dongfang Wu YosukeKomori Meng-iChou TatsukiIbuki.
2014 GSCMI Case Competition Optimizing CMSC Supply Chain Team Kunat Sandeep Repaka Kasey Carter Kunat Chongcharoenpaisarn Curt Isenbarger.
Sustainable Growth through Network Optimization Team Name: ARBY’s Bayu Daryanto Ronaldo Rotua Yuji Sakakibara Aurélia de Larrard.
Sustainable Growth through Network Optimization Afief Baasir Botao Shao Hery Sofiaji Pengyu Zhai Team Name: Guerilla Consulting.
GSCMI Case Competition: Sustainable Growth through Network Optimization SCM Consulting Peter Jacobson Raudel Medina Javier Arguello Jin Guo.
3-1Copyright ©2013 Pearson Education, Inc. publishing as Prentice Hall. Course Code MGT 561 Supply Chain Management Book: Supply Chain Management Strategy,
Bain & Company: Case Interview. Introduction Take notes Ask questions Structure your analysis Drive towards a recommendation.
Sustainable Growth through Network Optimization Team 9 Edward Addo-Chidie Jonathan Westwood Ratna Buelah Kondra William Ebow Hinson.
© 2008 Pearson Prentice Hall, Experiencing MIS, David Kroenke Slide 1 Chapter Extension 12 Supply Chain Management.
Introduction to Supply Chain Management Designing & Managing the Supply Chain Chapter 1 Byung-Hyun Ha
Geddy’s Supply Chain Strategy Team Name: Supply Chain Coup De Main 1 st Round Room 3098A Ellen Coates Eric Fredrickson Julia Phillips Josef Conner.
Capacity Planning Pertemuan 04
Location Planning and Analysis
Main Function of SCM (Part I)
Team Name: Oriental Dragon Jingru Kang Shu Wang Zheng Xia Yazhou Liu.
5 © The McGraw-Hill Companies, Inc., 2002 McGraw-Hill/Irwin 5 5 Slide 5-1 Target Costing,Theory of Constraints, and Life-Cycle Cost.
Importance of Location 1.Accounting which prepares cost estimates for changing locations as well as operating at new locations. 2.Distribution which seeks.
Distribution Strategies
Chapter 5 Network Design in the Supply Chain
Network Optimization Executive Seminar Track 1, Session A
Chapter 3 Supply Chain Drivers and Obstacles
Chapter 10 Supply-Chain Strategy
Chapter 3 Supply Chain Drivers and Obstacles
Introduction to Basic ERP Processes
Constraint Management
Sustainable Growth Through Network Optimization of Eaton Corporation
Team Name: Team 6_Tahiru Leo Fu Josh Lee John Upshaw Zach Tahiru
Chapter 3 Supply Chain Drivers and Obstacles
Chapter 5 Network Design in the Supply Chain
Capacity Planning For Products and Services
Capacity Planning For Products and Services
Chapter 3 Supply Chain Drivers and Metrics
Stevenson 5 Capacity Planning.
Eaton Corporation Sustainable Growth through Network Optimization
Chapter 3 Supply Chain Drivers and Obstacles
Production and Operations Management
Capacity Planning For Products and Services
Presentation transcript:

2014 GSCMI Case Competition Team MECE Presentation Yejin Lee| Bumsun Ryu Saya Lee| Ryan Seongjin Shin

Agenda (Yejin) Problem Statement Recommendation Analysis Implementation / Risk Mitigation Evaluation of Alternatives Conclusion

Premium Freight Frequency Problem Statement (Yejin) Short-Term Inventory Level Build Supply Network Long-Term Problem Statement Recommendation Analysis Implementation & Risk Evaluation of Alternative Conclusion Unbalanced performance between the west and the east High premium freight frequency High overall inventory level Key Issues? Sustains the Growth

Recommendation (Yejin) Short-TermLong-Term Kanbanized Warehouse CMSC Problem Statement Recommendation Analysis Implementation & Risk Evaluation of Alternative Conclusion

Multiples Analysis (Saya) How to reduce inventory level? Lean manufacturing – Dallas – Balanced lead-time Barely use of plants and CDCs – Lead-time vs. Inventory level Balanced lead-time  Less WIP  low Inventory  No bottleneck Bottleneck in Supply Chain Problem Statement Recommendation Analysis Implementation & Risk Evaluation of Alternative Conclusion

Analysis Continued (Saya) – Basic time (item to item) – Transportation time – Shipping rotation time – Consolidation wait time Problem Statement Recommendation Analysis Implementation & Risk Evaluation of Alternative Conclusion What causes bottleneck?Lean Manufacturing – Dallas – Overcome Basic time by maximizing warehouse uses – Overcome Transportation time by Premium Freight – Overcome Shipping rotation time, Consolidation wait time by barely use of plants or CDCs

Graphic Analysis (Bumsun) Before and After Dallasized San Francisco – SAT It shows high freight cost, inventory, and difference between COGS and order. The average turn over ratio is 50%. Problem Statement Recommendation Analysis Implementation & Risk Evaluation of Alternative Conclusion Dallasized SF – SAT By matching COGS and order, it showed decreasing inventory and no premium shipment cost.

Analysis Continued (Bumsun) Dallasized to Kanbanized Project SF-SAT (Max) SF-SAT (Min/Premium) SF-SAT (Ave) Dallas-SVC(Max) Dallas-SVC(Min/Premium) Dallas-SVC(Ave) Manufacturing CDC or Rotation Warehouse( Dallasized ) Transportation Warehouse( Kanbanized ) Dallasized and Kanbanized Problem Statement Recommendation Analysis Implementation & Risk Evaluation of Alternative Conclusion

Implementation & Risk (Ryan) Problem Statement Recommendation Analysis Implementation & Risk Evaluation of Alternative Conclusion Short-Term Long-Term Action Plan Contract with warehouse in West based on an optimized location Change Shipping Structure Hire Supply Network Director in West Store longer lead-time needed materials Action Plan Purchase new warehouse location and customize based on the efficiency of the center Build CMSC in West based on the data collected Global Market RiskRisk LevelWhy?Solution SiteHighCost & Contract Issue Find potential sites and plan ahead Higher DemandLow Higher than the Facility Capacity Prioritize the location and build additional DBN Lower DemandMedium Lower than the Facility Capacity Little Effect Risk Risk Level Why?Solution SiteHigh High initial installation cost New Customers, Contract Lands Lower DemandMedium Outside import, competitors Target a new market, customized materials

Evaluation of Alternative (Ryan) Criteria Options CAPAMobility Cost (Initial, Long-term) New CMSC133 Warehouse212 New DBN321 Problem Statement Recommendation Analysis Implementation & Risk Evaluation of Alternative Conclusion

Conclusion (Ryan) Build a warehouse Dallasization & Kabanization Recommendation Build an optimized location for the warehouse Purchase new warehouse on the efficiency of the center Build CMSC in West based on the data collected Build CMSC for further market Implementation Collect more data to build or buy any additional needed Target Global market Compliance with DOE terms necessary Strategic Approach Site of warehouse related issues Demand Uncertainty Competitors No experience with mass production Potential Risks Problem Statement Recommendation Analysis Implementation & Risk Evaluation of Alternative Conclusion

Fina nci al Res ult

Appendix

Key Assumption Manufacturing process and ability are similar across all CMSC. CMSC is focused on customization orders that leads Advanced Purchase items. The amount of order in dollar matches the COGS within 10% distribution due to Dallasizing (Slide 7). Manufacturing process takes 5 days and same for all parts (Slide 8). *Premium Shipment Frequency & Total Order Amount is Equally Weighted (Appendix) *Premium Order / Total Order = Average Above 7.5% Considered (Appendix)

Location Optimization "Minisum" Straight Line Method San FransiscoLos AnglesPortlandSeattleTexasChicago Xi Yi Wi18.98%20.83%10.88%10.76%24.29%14.26% XiWi YiWi Optimal LocationX* Y* PremiumShip Frequency (Month)PercentageTotal Order Amount ($)Percentage Weighted Percentage San Fransisco %1,208, %18.98% Los Angles % 1,626, %20.83% Portland % 396, %10.88% Seattle % 379, %10.76% Texas %2,775, %24.29% Chicago % 1,187, %14.26% Sum54.57,574, % Based on the Minisum Analysis, Results are 39°81‘44.9"N -110°25‘14“W