Example A company purchases air filters at a rate of 800 per year $10 to place an order Unit cost is $25 per filter Inventory carry cost is $2/unit per.

Slides:



Advertisements
Similar presentations
Module C6 Other EOQ Type Models.
Advertisements

Inventory Modeling Concepts
Chapter 5 Inventory Control Subject to Uncertain Demand
CmpE 104 SOFTWARE STATISTICAL TOOLS & METHODS MEASURING & ESTIMATING SOFTWARE SIZE AND RESOURCE & SCHEDULE ESTIMATING.
Stochastic Inventory Modeling
Inventory Models Planned Shortage Models. PLANNED SHORTAGE MODEL Assumes no customers will be lost because of stockouts Instantaneous reordering –This.
Inventory Management for Independent Demand Chapter 12, Part 2.
Inventory Control Chapter 17 2.
1 1 © 2003 Thomson  /South-Western Slide Slides Prepared by JOHN S. LOUCKS St. Edward’s University.
INVENTORY MODELING Service Levels. DETERMINING A REORDER POINT, r* (With Safety Stock) Suppose lead time is 8 working days The company operates 260 days.
1 1 Slide © 2008 Thomson South-Western. All Rights Reserved Slides by JOHN LOUCKS St. Edward’s University.
Murat Kaya, Sabancı Üniversitesi 1 MS 401 Production and Service Systems Operations Spring Inventory Control – IV Multiperiod Probabilistic Demand:
McGraw-Hill/Irwin Copyright © 2007 by The McGraw-Hill Companies, Inc. All rights reserved. 12 Inventory Management.
Inventory Control IME 451, Lecture 3.
Chapter 13 Inventory Systems for Independent Demand
Chapter 11, Part A Inventory Models: Deterministic Demand
ISEN 315 Spring 2011 Dr. Gary Gaukler. Demand Uncertainty How do we come up with our random variable of demand? Recall naïve method:
Copyright © 2011 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin Manufacturing Planning and Control MPC 6 th Edition Chapter.
LESSON 22: MATERIAL REQUIREMENTS PLANNING: LOT SIZING
Operations Management Inventory Management Chapter 12 - Part 2
Inventory Models Planned Shortage Models. PLANNED SHORTAGE MODEL Assumes no customers will be lost because of stockouts Instantaneous reordering –This.
Chapter 5 Inventory Control Subject to Uncertain Demand
INDR 343 Problem Session
Module C5 Reorder Point/Service Levels. DETERMINING A REORDER POINT, r* (Without Safety Stock) Suppose lead time is 8 working days The company operates.
1 Operations Management Inventory Management. 2 The Functions of Inventory To have a stock of goods that will provide a “selection” for customers To take.
ISE 216 Question Hour Chapter 5
A) If average demand per day is 20 units and lead time is 10 days. Assuming zero safety stock. ss=0, compute ROP. b) If average demand per day is 20 units.
Chapter 8: Confidence Intervals
Economic Order Quantity
Inventory Management.
5-1 ISE 315 – Production Planning, Design and Control Chapter 5 – Inventory Control Subject to Unknown Demand McGraw-Hill/Irwin Copyright © 2005 by The.
1 Slides used in class may be different from slides in student pack Chapter 17 Inventory Control  Inventory System Defined  Inventory Costs  Independent.
1 INVENTORY MODELS Outline Deterministic models –The Economic Order Quantity (EOQ) model –Sensitivity analysis –A price-break Model Probabilistic Inventory.
When to re-order with EOQ Ordering
Economic Order Quantity The economic order quantity (EOQ) is the fixed order quantity (Q) that minimizes the total annual costs of placing orders and holding.
Economic Order Quantities (EOQs) The concept of an economic-order quantity addresses the question of how much to order at one time. The concept of an economic-order.
Inventory Management. Learning Objectives  Define the term inventory and list the major reasons for holding inventories; and list the main requirements.
CHAPTER 5 Inventory Control Subject to Uncertain Demand McGraw-Hill/Irwin Copyright © 2009 by The McGraw-Hill Companies, Inc. All rights reserved.
Inventory Management Chapter 12 Independent Demand A B(4) C(2) D(2)E(1) D(3) F(2) Dependent Demand Independent demand is uncertain. Dependent demand.
LSM733-PRODUCTION OPERATIONS MANAGEMENT By: OSMAN BIN SAIF LECTURE 18 1.
MBA 8452 Systems and Operations Management
Operations Research II Course,, September Part 3: Inventory Models Operations Research II Dr. Aref Rashad.
Inventory Management for Independent Demand Chapter 12.
CSE 2813 Discrete Structures Solving Recurrence Relations Section 6.2.
Simulation Chapter 16 of Quantitative Methods for Business, by Anderson, Sweeney and Williams Read sections 16.1, 16.2, 16.3, 16.4, and Appendix 16.1.
Solving Linear Systems by Substitution
Y=3x+1 y 5x + 2 =13 Solution: (, ) Solve: Do you have an equation already solved for y or x?
Time Inventory Demand During Lead Time. LT ROP when demand during lead time is fixed.
FORECAST 2 Exponential smoothing. 3a. Exponential Smoothing Assumes the most recent observations have the highest predictive value – gives more weight.
PENGENDALIAN PERSEDIAAN (Bagian 2)
Copyright © Cengage Learning. All rights reserved. 8 PROBABILITY DISTRIBUTIONS AND STATISTICS.
8.2 The Geometric Distribution 1.What is the geometric setting? 2.How do you calculate the probability of getting the first success on the n th trial?
PERSEDIAAN PROBABILISTIK: PERIODIC REVIEW
Statistical Modelling
Equations Quadratic in form factorable equations
Managing Facilitating Goods
NATCOR Stochastic Modelling Course Inventory Control – Part 2
Chapter 15 Inventory Systems for Independent Demand
Managing Uncertainty in the Supply Chain: Safety Inventory
Random Demand: Fixed Order Quantity
Chapter 12 Inventory Management.
Outline Multi-Period Models Lot size-Reorder Point (Q, R) Systems
Solve a system of linear equation in two variables
More about Posterior Distributions
Solving Systems of Equations using Substitution
Chapter 17 Inventory Control.
Slides by John Loucks St. Edward’s University.
Chapter 12 Inventory Management.
Equations Quadratic in form factorable equations
Chapter 12 Inventory Management.
Presentation transcript:

Example A company purchases air filters at a rate of 800 per year $10 to place an order Unit cost is $25 per filter Inventory carry cost is $2/unit per year Shortage cost is $5 Lead time is 2 weeks Assume demand during lead time follows a uniform distribution from 0 to 200 Find (Q,R)

Solution Partial derivative outcomes:

Solution From Uniform U(0,200) distribution:

Solution Iteration 1: F(R) 2000 R

Solution Iteration 2:

Solution Iteration 3:

Solution R didn’t change => CONVERGENCE (Q*,R*) = (94,190) I(t) Slope -  With lead time equal to 2 weeks: SS = R –  = (2/52)=159

Example Demand is Normally distributed with mean of 40 per week and a weekly variance of 8 The ordering cost is $50 Lead time is two weeks Shortages cost an estimated $5 per unit short to expedite orders to appease customers The holding cost is $ per week Find (Q,R)

Demand is per week. Lead time is two weeks long. Thus, during the lead time: Mean demand is 2(40) = 80 Variance is (2*8) = 16 Demand observed in one week is independent from demand observed in any other week: E(demand over 2 weeks) = E (2*demand over week 1) = 2 E(demand in a single week) = 2 μ = 80 Standard deviation over 2 weeks is σ = (2*8) 0.5 = 4 Solution

Finding Q and R, iteratively 1. Compute Q = EOQ. 2. Substitute Q in to Equation (2) and compute R. 3.Use R to compute average backorder level, n(R) to use in Equation (1). 4. Solve for Q using Equation (1). 5. Go to Step 2 until convergence.

Solution Iteration 1: From the standard normal table:

Solution Iteration 2: This is the unit normal loss expression. Table A - 4 gives values.

Solution Iteration 2: