Www.floodrisk.org.uk EPSRC Grant: EP/FP202511/1 Improved Methods for Predicting Trash Loading at Culverts with Trash Screens Nick Wallerstein & Scott Arthur.

Slides:



Advertisements
Similar presentations
NCeSS e-Stat quantitative node Prof. William Browne & Prof. Jon Rasbash University of Bristol.
Advertisements

A Joint Code of Practice Objectives and Summary Presentation
TRP Chapter Chapter 6.8 Site selection for hazardous waste treatment facilities.
Defra/ Environment Agency Joint Flood and Coastal Erosion Risk Management R&D Programme Geoff Baxter Environment Agency, Evidence Directorate, Flooding.
Assessing Uncertainty when Predicting Extreme Flood Processes.
PRESENTED BY: RICARDO V. LOPEZ, MPH Elucidating Key Variables in the STEM Transfer Student Experience from the Integration of Multi-institutional Research.
Workshop for Birmingham City Council: Risking your Dignity: hearing the citizen’s voice The tension between ‘empowering’ and ‘protecting’ people: Have.
International workshop to discuss the science of asset management, 9 th December 2011 Long term investment planning Developing practical strategic investment.
EPSRC Grant: EP/FP202511/1 Session 2 - Improving the management of flood infrastructure Chair Paul Sayers, Leader Infrastructure Management.
Foresight Flood and Coastal Defence Project Government Office for Science Department for Innovation, Universities and Skills Overview by: Colin Thorne.
Funders: EPSRC Grant: EP/FP202511/1 ENGAGING STAKEHOLDERS WITH UNCERTAINTY ENGAGING STAKEHOLDERS WITH UNCERTAINTY Hazel Faulkner &
Towards Better Exploitation and Economic Impact: Developing the EPSRC Partnership with the University Vince Osgood Associate Director, Economic Impact.
Flooding from Intense Rainfall. Seven Science Themes.
Summarizing Community-Based Participatory Research: Background and Context for the Review Lucille Webb, MEd Eugenia Eng, DrPH Alice Ammerman, DrPH Meera.
Decisions in the Face of Uncertainty Cedar River Sockeye Hatchery Proposed Adaptive Management Plan.
Conclusions, planning and prospects Follow-up committee meeting 6 October, Leuven.
Sustainable growth and water cycle studies Andy McConkey, principal consultant, Halcrow Paul Hickey, growth and equivalence manager, Anglian Water Gerard.
EPSRC Grant: EP/FP202511/1 Probabilistic Forecasting for Local Flooding David Leedal, Paul Smith, Keith Beven and Peter Young Lancaster.
What do reviewers look for in a research proposal? Research Councils’ review criteria Dimitra Koutsantoni Research & Knowledge Transfer Manager.
Living With Environmental Change Mary Barkham LWEC Deputy Director Understanding Society Workshop 27January 2011.
ISO Energy Management System Certification
Quality Risk Management ICH Q9 Annex I: Methods & Tools
Uncertainty in Engineering - Introduction Jake Blanchard Fall 2010 Uncertainty Analysis for Engineers1.
EPSRC Grant: EP/FP202511/1 Emerging Issues in Managing River Sediments, Flood Risks and Habitats Colin Thorne Nottingham University.
WMO UNEP INTERGOVERNMENTAL PANEL ON CLIMATE CHANGE NATIONAL GREENHOUSE GAS INVENTORIES PROGRAMME WMO UNEP IPCC Good Practice Guidance Simon Eggleston Technical.
EPSRC Grant: EP/FP202511/1 International workshop to discuss the science of asset management 9 th December 2011, Brunei Gallery, School.
Anthropogenic Noise from Offshore Wind Farm Construction Background A key element of the UK plan for the delivery of renewable energy.
Creating the relationship between good science and informed policy John C. Tracy, Director Idaho Water Resources Research Institute University of Idaho.
Data Analysis in the Water Industry: A Good-Practice Guide with application to SW Deborah Gee, Efthalia Anagnostou Water Statistics User Group - Scottish.
Grey Literature, E-Repositories and Evaluation of Academic & Research Institutes. The case study of BPI e-repository Maria V. Kitsiou - Head Librarian,
IAEA International Atomic Energy Agency US NRC Approach for Seismic Hazard Assessments INTERNATIONAL WORKSHOP ON LESSONS LEARNED FROM STRONG EARTHQUAKES.
Life Cycle Overview & Resources. Life Cycle Management What is it? Integrated concept for managing goods and services towards more sustainable production.
©NERC Confidential What’s the data? Keynote speech by Dr Simon Jackman Head of Knowledge Exchange Natural Environment Research Council Whose Brains? ESG.
SHORELINE MANAGEMENT PLAN REVIEW (SMP2) South Devon and Dorset Coastal Authorities Group SDADCAG.
DEFRA 1 st IMPACT Workshop - 16/17 May 2002 How does this research fit within the UK? Dr Mervyn Bramley Flood Defence Development Manager, Environment.
EPSRC Grant: EP/FP202511/1 From offshore wave to coastal erosion and overtopping Nicolas Chini 1, Lucy Bricheno 2, Chris Wilson 2,
Chapter 6 : Software Metrics
1 SAFEGROUNDS SAFety and Environmental Guidance for the Remediation of UK Nuclear and Defence Sites.
LIFE THIRD COUNTRIES Development and Implementation of an Integrated System for the Control and Monitoring of the Urban Wastewater Treatment Plants in.
Ranking NZ river values – application of the River Values Assessment System (RiVAS) Ken Hughey and Mary-Anne Baker
Industry & Research: Issues, needs and conclusions from the US IMPACT Investigation of Extreme Flood Processes & Uncertainty Workshop at HR Wallingford,
ACT & ACF Draft Programmatic Environmental Impact Statements SAD Water Supply Conference Wilmington, NC David Luckie (CESAM-PD)
Water Quality Training for Small Systems: Working Together to Develop a Common Sense Approach Bill Schutzman Government of Canada Water Safety Conference,
Business Process Change and Discrete-Event Simulation: Bridging the Gap Vlatka Hlupic Brunel University Centre for Re-engineering Business Processes (REBUS)
1 Water Services Training Group 19 th Annual Conference Optimising Services Delivery in the Water Industry Radisson Blu Hotel Sligo, 3 rd. September 2015.
Reducing the Risk of Embankment Failure Under Extreme Conditions Mark Morris HR Wallingford IMPACT Project Workshop Wallingford, 17 May 2002.
The ToolBox Product Management & Product Development Framework Welcome to the Product Management & Product Development “Good Practice” workshop Facilitated.
David Carr The Wellcome Trust Data management and sharing: the Wellcome Trust’s approach Economic & Social Data Service conference.
Funders: EPSRC Grant: EP/FP202511/1 Communicating flood risk science at the academic- practitioner interface Meghan Alexander * Hazel.
EPSRC Grant: EP/FP202511/1 WP4.4 A Rapid Embankment Breach Assessment (AREBA) Myron van Damme Sept 2011.
SNIFFER’S ROLE IN FLOOD RISK MANAGEMENT Fiona Mactaggart Research Manager.
IMPACT 3-5th November 20044th IMPACT Project Workshop Zaragoza 1 Investigation of extreme flood Processes and uncertainty IMPACT Investigation of Extreme.
IMPACT 3-5th November 20044th IMPACT Project Workshop Zaragoza 1 Investigation of extreme flood Processes and uncertainty IMPACT Investigation of Extreme.
Integrated and Planned Enforcement of Environmental Law Phare Twinning Project CZ03/IB/EN/01 MONITORING Mr. Jan Prášek IPPC Agency.
C HU H AI C OLLEGE O F H IGHER E DUCATION D EPARTMENT O F C OMPUTER S CIENCE Preparation of Final Year Project Report Bachelor of Science in Computer Science.
Adaptive Integrated Framework (AIF): a new methodology for managing impacts of multiple stressors in coastal ecosystems A bit more on AIF, project components.
EPSRC Grant: EP/FP202511/1 Good Practice Guidelines for Flood Risk Mapping Keith Beven, Lancaster University With Dave Leedal (Lancaster),
IMPACT 13 May Investigation of extreme flood Processes and uncertainty IMPACT Investigation of Extreme Flood Processes and Uncertainty.
1 Tom Edgar’s Contribution to Model Reduction as an introduction to Global Sensitivity Analysis Procedure Accounting for Effect of Available Experimental.
AdaptNRM Adaptation information for NRM planning Lilly Lim-Camacho 10 September 2014 Image: River, by L Gener, Credits: SA MDB,
3 rd WG F meeting: CRUE ERA-Net update Andreas Pichler CRUE ERA-Net dissemination officer.
RASP - Risk Assessment of flood and coastal defence for Strategic Planning A High Level Methodology Project partners and co-authors Paul Sayers / Corina.
Beach Modelling: Lessons Learnt from Past Scheme Performance Project: SC110004/S Project Summary.
Calderdale Catchment Plan Update July 2016 Helen Batt: Calderdale Catchment Director Environment Agency.
COLLABORATION IN CLIMATE POLICY ASSESSMENT:IRELAND AT RISK(Homework 6)
MONITORING Mr. Jan Prášek IPPC Agency.
Knowledge Transfer Partnership Project Nottingham Trent University and Nottinghamshire County Council Dr Adam Barnard Rachel Clark Catherine Goodall 19/4/16.
Chartered College of Teaching
ENVIRONMENTAL ASSESSMENT TOOLS
IMPRESS Guidance and Policy Summary Water Directors Copenhagen, 21-22nd November 2002 Working Group leaders: Volker Mohaupt, Umwelt Bundes Amt Isobel.
Presentation transcript:

EPSRC Grant: EP/FP202511/1 Improved Methods for Predicting Trash Loading at Culverts with Trash Screens Nick Wallerstein & Scott Arthur (Heriot-Watt University) FRMRC 2 WP 4.1 Advances in Flood Risk Management Science The Royal Society 5 th September 2011

Material delivered into the river system includes natural (organic) debris The problem Culverts represent pinch-points in the river system which often have trash screens installed to prevent internal blockage. However these can be a flood hazard in themselves if not cleared and maintained at an appropriate inspection interval. and also anthropogenic trash.

Build on the current scientific knowledge base regarding trash screen blockage. Develop evidence based decision support tools to aid with screen management. Specifically tools to help estimate the: Aims 1.Probability of significant debris load delivery to screens 2.Potential screen area likely to block Aim to use the findings to help update current best-practice guidance: Culvert Design and Operation Guide (CDOG) (CIRIA, 2010) Attempt to explicitly quantify the uncertainties associated with such tools.

Analysis approach Used detailed inspection records (25000) from 140 screens located in Belfast (supplied by NIRA) to determined (P d ) and (Sa b ) for each screen in the dataset. flow l anduse social dep. (screen) P d / Sa b = f channel predictive equations Related these parameters to hypothesised driving variables using multiple regression analysis to generate predictive equations :-

Application (prob. delivery) rank screens according to risk and base inspection frequency upon rank select screens of concern obtain equation input data calculate P d for each screen using the appropriate equation calculate associated risk: = P d x blockage consequence

Key collaborative partners FRMRC Industrial Partners JBA } Bayesian analysis of dataset leading to research publication Royal Haskoning } report on research needs + key output reviewer HR Wallingford } report on integration of WP 4.1 outputs with FRM EA (lead end user) } key steer Independent initiatives Northern Ireland Rivers Agency (NIRA) Edinburgh City Council South Lanarkshire Council EA (Bridgewater) H.W. Uni. Dept. Maths } obtained EPSRC ‘Bridging the Gaps Fund’ grant facilitating joint research analysis leading to publication data-sets

Conclusions The installation of trash screens at culverts does not preclude flooding. Screens must have both an effective inspection regime and an optimal design to minimise blockage potential. Through WP 4.1 we have gained an improved understanding of the key variables driving debris delivery to, and blockage at, trash screens. Exploration of this subject has led to internationally leading academic research. Simple regression equations have been developed to act as decision support tools for assessing optimal screen inspection frequency and design.

Outputs FRMRC WP 4.1 Final Science Report Technical note to accompany CDOG Report on integration of science outputs with FRM Report on trash screen research needs practical books / papers / conference proceedings Chapter in forthcoming Flood Defence Design and Analysis Methods book Four international journal publications (various stages of completion) Papers in proceedings of five international conferences

The research reported in this presentation was conducted as part of the Flood Risk Management Research Consortium with support from the: Engineering and Physical Sciences Research Council Department of Environment, Food and Rural Affairs/Environment Agency Joint Research Programme United Kingdom Water Industry Research Office of Public Works Dublin Northern Ireland Rivers Agency Data were provided by the EA and the Ordnance Survey Acknowledgement