Elk Grove Water District – CAC Meeting Water Rate Update and Connection Fees Habib Isaac – Principal Carlos Villarreal – Technical Advisor January 22,

Slides:



Advertisements
Similar presentations
2013 Water Rate Study and Proposed Multi-Year Water Rate Adjustments 1.
Advertisements

Proposed Water & Sewer Rates FY2014 Department of Utilities & General Services April 1,
October 8, 2013 Eric Fox and Mike Russo. AGENDA »Recent Sales and Customer Trends »Preliminary State Sales and Demand Forecast »Building a No DSM Forecast.
Municipal & Financial Services Group Water and Sewer Rate Study Revenue Requirements and Rates Workshop April 18, 2012 King George County Service Authority.
Presentation to CITY OF PALM COAST, FLORIDA WATER AND WASTEWATER RATE STUDY AND BOND FEASBILITY REPORT Prepared in Conjunction with the Issuance of Utility.
General Fee Schedule Annual Update Fiscal Year 2014 Finance Committee/City Council June 3, 2013.
Municipal & Financial Services Group Village of Downers Grove Water Rate Study Rate Study Overview and Recommendations September 21, 2010 Presented by:
Cost of Service Water Rate Study Habib Isaac – Principal Greg Tobler – Task Manager May 14, 2012.
1 Combined Utility System Cost of Service Rate Study Presentation April 6, 2010.
RETAIL RATE REVISIONS August 1, 2015 Presented By:
Pathways to Lasting Solutions “The Longest Yard” Water Budget Rate Structures & The City of Boulder, Colorado January 25, 2007 © 2006 Malcolm Pirnie, Inc.
TVA Generates Power and sends it down Transmission Lines to Newport Utilities Distribution Substations TVA Newport Utilities Substations Distributes the.
© 2013 McGraw-Hill Ryerson Limited.
Presentation to CITY OF PALM COAST, FLORIDA WATER AND WASTEWATER RATE STUDY AND BOND FEASBILITY REPORT Prepared in Conjunction with the Issuance of Utility.
Recommendation for Board approval of updated nodal fee filing Steve Byone Overview –Historical summary –Highlights from approved interim Nodal Surcharge.
Page: Water and Wastewater Rate Study and Financial Forecast Council Presentation City of Cottonwood July 2009.
1 Why Budgeting Matters NC Local Government Budget Conference Wilmington, NC July 2007.
Elk Grove Water District Water Rate Update and Connection Fees Habib Isaac – Principal April 10, 2013.
Finance Committee Meeting Water Rate Study Update Habib Isaac – Principal Gregg Tobler – Task Manager August 13, 2012.
Slide 1 B O N N E V I L L E P O W E R A D M I N I S T R A T I O N Residential Appliance Measure Updates Danielle Gidding Bonneville Power Administration.
Statewide Level Rate Study Thomas A. Petee, Ph.D. Auburn University at Montgomery Center for Government & Public Affairs.
Updated Estimates of Impervious Area, Equivalent Residential Units, IA Rate, and Customer Bill Impacts AOBA October 27, 2008.
1 SB 695 Impact On Rates LIOB- March 30, Current Residential Electric Rate Structure  Multi-tiered rate structure (up to 5 Tiers) based on the.
Unbilled Revenue Presented by Mindy Willis Orlando Utilities Commission.
Elk Grove WD Board Meeting Water Rates Habib Isaac – Principal Gregg Tobler – Task Manager September 10, 2012.
Elk Grove Water District – Finance Meeting Water Rate Update and Connection Fees Habib Isaac – Principal Gregg Tobler – Task Manager January 30, 2013.
Water Connection Fee Analysis Elk Grove Water District Finance Committee January 30, 2013.
Proposed Deemed Savings Rates for Energy Star 3.0 Plus 30% Televisions By Christina Steinhoff June 1,
NARUC SUMMER COMMITTEE MEETINGS Committee on Water Agenda California Regulatory Initiatives Case History – California American Water B. Kent Turner – President.
DNPC08 Review of Standard LDZ System Charges 6 September 2010.
Smart Irrigation Technology Study Utilities Department June 30,
Commissioners’ Briefing on Front Foot Benefit and House Connection Rates November 16, 2011.
1 Water Utility Regulation Straw Proposal October 13, 2015.
Pasadena Water and Power Public Hearing Date Water Capital Improvement Charge Pasadena City Council Meeting November 16, 2015 Agenda Item #13.
Water Conservation Update Seaneen M Wilson Division of Water & Audits September 17, 2008.
Road Impact Fee Update Discussion Item June 21, 2011 Transportation Impact Fee Update Discussion Item June 21, 2011.
Commission Meeting November 18, 2015 WSSC Customer Use and Pricing.
Pasadena Water and Power Public Hearing Water Capital Improvement Charge Pasadena City Council Meeting January 11, 2016 Item #12.
Keeping Business Record. What are quarters in accounting? January – March is the 1 st quarter April – June is the 2 nd quarter July – Sept is the 3 rd.
Scientific Irrigation Scheduling provisional analysis and research plan BPA December 2014.
Water System Master Plan & Rate Study City of DeKalb, Illinois City Council Presentation May 16, 2015.
RATE ANALYSIS FY FY 2019 March 6, 2014 CARSON VALLEY WATER UTILITY FUND 326 – DEPARTMENT 864.
Christopher M. Quinn, MACC, CPA, CFE, CGFO, CGMA Finance Director Tuesday, May 3 rd, 2016.
Town of Lochbuie Water 2015 Water Rate Options Presented to the Town of Lochbuie Board of Trustees Raftelis Financial Consultants, Inc. December 16, 2014.
Resolution 2014R-099 December 18,  Board Direction ◦ Establish a monthly cost-of-service rate of $ for FY 2015 and utilize a General Fund.
City of Fernley, Nevada – 164 th Ave. NE, Suite 300, Redmond, WA April 18, 2007 Rate Study Findings Water and Sewer Utility Rates.
Water and Wastewater Rates Public Hearing July 15, 2015 The Reed Group, Inc. 1.
1 City of Cocoa Michael Burton - President Andrew Burnham - Sr. Vice President Eric Grau - Project Consultant Presented by: Water, Sewer & Reclaimed Water.
City of Fernley, Nevada – 164 th Ave. NE, Suite 300, Redmond, WA April 18, 2007 Rate Study Findings Water and Sewer Utility Rates.
1 PG&E’s Response to the Summer 2006 Heat Storm LIOB Meeting September 14, 2006 Sacramento, CA.
Pathways to Lasting Solutions June 9, 2009 City Council Work Session – No. 2 © 2008 Malcolm Pirnie, Inc. All Rights Reserved Water and Wastewater Rate.
NEIS Performance Framework Industry Consultation Paper 2017
Current Water Rates $26.66 per month readiness to serve fee (billed on a quarterly basis at $80.00) 5.14 per 1,000 gallons of water used The City of Flushing.
City of Petersburg Water and Wastewater Rates
Water and Wastewater Rates
Receivables LO 6 – Accounting for Notes Receivable.
Final Rate Study Findings
City of Sisters, OR 2017 Water & Sewer Rate Study
City of Petersburg Water and Sewer Rates April 26, 2011
Biennial Budget Update for FY & FY
Springfield Utility Board Proposed 5.0%
Update on Implementation of Proposed Rates for CII Customers; Outreach
Cost of Service Analysis & Rate Design
Comprehensive Rate Study & Cost Allocation Analysis
Non-Residential Customer Non- Residential - Capacity Evaluation Borough of Conshohocken Authority Customer Informational Meeting June 20, East.
Water Cost-of-Service
LDZ System Charges – Structure Methodology 26 July 2010
WASTEWATER and SOLID WASTE Rate Study
Behavior Modification Report with Peak Reduction Component
2018 Water/Wastewater Rate Study and Financial Forecast
Presentation transcript:

Elk Grove Water District – CAC Meeting Water Rate Update and Connection Fees Habib Isaac – Principal Carlos Villarreal – Technical Advisor January 22, 2013

Elk Grove Water District - Utility Rate Project | 2 Topics of Discussion Adjustments to Rate Analysis –Consumption adjustments –Revenue check –Residential non-metered accounts –FY consumption projection –Revised proposed rates for each scenario (fix/variable split) –Customer impact based on usage levels Connection Fees –Background –Methodology

Elk Grove Water District - Utility Rate Project | 3 Consumption Adjustments Received additional usage records –2011 through 2012 –Usage slightly higher in 2012 versus 2011 – Incorporated average of 2 years into analysis –Result: slightly more units of water to spread cost Rate per unit of water reduces

Elk Grove Water District - Utility Rate Project | 4 Applied current rates and proposed rates to FY consumption figures –Revenue test confirmed model is generating appropriate amount of revenue –Difference less than 1% Revenue Check

Elk Grove Water District - Utility Rate Project | 5 Reduced average usage to equal metered customers –Flat rate reduced Projected conversion rate of non-metered accounts –All non-metered accounts converted by April 2014 –Consumption for metered accounts increases in first 2 years –New baseline consumption calculated for FY Residential Non-Metered Accounts

Elk Grove Water District - Utility Rate Project | 6 Between July 2012 – December 2012 –Used 2 year average derived from 2011 and 2012 –Already accounts for non-metered conversions Between January 2013 – June 2013 –Used 2 year average derived from 2011 and 2012 for existing metered accounts –Projected usage of non-metered account conversions Conversion rate equals 125 meters per month Expected usage derived on a per month basis based on 2011 and 2012 data c FY Consumption Projection

Elk Grove Water District - Utility Rate Project | 7 Step Up Rates: Scenario 1 – ~(60% / 40%) Residential Accounts Tier 1 = $1.60 Tier 2 = $1.92 Tier 3 = $3.11 Non-Residential Accounts $1.87 Irrigation Accounts $2.00 Existing Structure Tier 1 = $1.46 Tier 2 = $1.80

Elk Grove Water District - Utility Rate Project | 8 Step Up Rates: Scenario 1 - ~(60% / 40%)

Elk Grove Water District - Utility Rate Project | 9 Customer Impact – Scenario 1: Step Up ~(60%/40%) (1.10)

Elk Grove Water District - Utility Rate Project | 10 Step Up Rates: Scenario 2 - ~(65% / 35%) Residential Accounts Tier 1 = $1.41 Tier 2 = $2.81 Non-Residential Accounts $1.60 Irrigation Accounts $1.72 Existing Structure Tier 1 = $1.46 Tier 2 = $1.80

Elk Grove Water District - Utility Rate Project | 11 Step Up Rates: Scenario 2 - ~(65% / 35%)

Elk Grove Water District - Utility Rate Project | 12 Customer Impact – Scenario 1: Step Up (35%/65%)