XXVI Workshop on Recent Developments in High Energy Physics and Cosmology Theodoros Argyropoulos NTUA DCS group Ancient Olympia 2008 ATLAS Cathode Strip.

Slides:



Advertisements
Similar presentations
ALICE DCS, Heidelberg 8 Sept G. De Cataldo, CERN CH and INFN Bari;A. Franco INFN Bari 1 Updating on the HV control systems in ALICE The DELPHI HV,
Advertisements

DCS workshop 13-14/6/2005G. De Cataldo, CERN-CH and INFN bari1 Common FSM’s updates An exercise to design the standard FSMs for the DCS, the HV and the.
The Control System for the ATLAS Pixel Detector
Alarms and interlocks handling in the FSM environment Hypernet 1.The standardization of the FSM state diagram; 2.The FSM error states and their recovering.
CPV DCS STATUS REPORT Mikhail Bogolyubsky (IHEP, Protvino) Serguei Sadovsky (IHEP, Protvino) CERN, DCS meeting, 30 January, 2007.
Il sistema di HV del sottorivelatore DT S. Braibant, P. Giacomelli, M. Giunta, E. Borsato Bologna, 20/01/2007.
Detector Control System at the GIF++ A. Polini, M. Romano (AIDA+INFN Bologna) on behalf of WP group Gif++ User Meeting 11/07/2014 Outline Status.
1 ALICE Detector Control System (DCS) TDR 28 January 2004 L.Jirdén On behalf of ALICE Controls Coordination (ACC): A.Augustinus, P.Chochula, G. De Cataldo,
HV for SM surface testing 2 nd Workshop on the Detector Control System for TRD University of Tsukuba Kengo Watanabe.
Clara Gaspar, May 2010 The LHCb Run Control System An Integrated and Homogeneous Control System.
L. Granado Cardoso, F. Varela, N. Neufeld, C. Gaspar, C. Haen, CERN, Geneva, Switzerland D. Galli, INFN, Bologna, Italy ICALEPCS, October 2011.
1 CALO DCS power supply status CALO meeting Anatoli Konoplyannikov [ITEP / LAPP] Outline  Introduction  Power supply description with hardware.
Robert Gomez-Reino on behalf of PH-CMD CERN group.
3 June 2003U. Frankenfeld1 TPC Detector Control System Status.
System Integration Tool Basic Introduction. „System Integration Tool “2Content I.Nomenclature I.Nomenclature II.Introduction II.Introduction III.Implementation.
Calo Piquet Training Session - Xvc1 ECS Overview Piquet Training Session Cuvée 2012 Xavier Vilasis.
Designing a HEP Experiment Control System, Lessons to be Learned From 10 Years Evolution and Operation of the DELPHI Experiment. André Augustinus 8 February.
Towards a Detector Control System for the ATLAS Pixeldetector Susanne Kersten, University of Wuppertal Pixel2002, Carmel September 2002 Overview of the.
09/11/20061 Detector Control Systems A software implementation: Cern Framework + PVSS Niccolo’ Moggi and Stefano Zucchelli University and INFN Bologna.
MDT PS DCS for ATLAS Eleni Mountricha
SMACS Slow Monitor And Control System Developed system for CDF-TOF proposed for Atlas-MDT/RPC.
JCOP Workshop September 8th 1999 H.J.Burckhart 1 ATLAS DCS Organization of Detector and Controls Architecture Connection to DAQ Front-end System Practical.
Development and Performance of the High Voltage Distribution System for the ALICE TRD A. Markouizos, P. Mantzaridis, P. Mitseas, A. Petridis, S. Potirakis,
Clara Gaspar, October 2011 The LHCb Experiment Control System: On the path to full automation.
ATLAS MDT Power Supply DCS Anastasios Iliopoulos 15/08/2006.
The Joint COntrols Project Framework Manuel Gonzalez Berges on behalf of the JCOP FW Team.
André Augustinus 10 September 2001 DCS Architecture Issues Food for thoughts and discussion.
1 Status and Plans DCS workshop L.Jirdén u Budget u Status u Planning u Goals for end 2002.
D etector C ontrol S ystem ALICE DCS workshop G. De Cataldo CERN-CH, A. Franco INFN Bari, I 1 Finite State Machines (FSM) for the ALICE DCS:
TPC Prototype III TPC module anode HV edge LV module analog digital Cool sensor Gas sensor Shift Expert DCS Ch Skirt.
André Augustinus 10 October 2005 ALICE Detector Control Status Report A. Augustinus, P. Chochula, G. De Cataldo, L. Jirdén, S. Popescu the DCS team, ALICE.
DCS workshop July 2007 Overview Installed detectors Installed detectors FMD3 commissioning FMD3 commissioning FSM Hierarchy FSM Hierarchy LV+HV FSMs LV+HV.
Controls EN-ICE Finite States Machines An introduction Marco Boccioli FSM model(s) of detector control 26 th April 2011.
Giovanni Polese1 RPC Detector Control System for MTCC Pierluigi Paolucci, Anna Cimmino I.N.F.N. of Naples Giovanni Polese Lappeenranta University.
The Detector Control Power System of the Monitored Drift Tubes of the ATLAS Experiment Theodoros Alexopoulos NTU Athens TWEPP08 September 17, 2008 Naxos,
15-16/3/04 DCS workshop G. De Cataldo, A,.Franco and A. Tauro 1 Answers from the HMPID to the ACC questions 1.Concerning global DCS overview drawing 2.Concerning.
ECAL Prototype DCS system using PVSS Günther Dissertori (for Alison Lister) ETHZ
Bruno Belbute, October 2006 Presentation Rehearsal for the Follow-up meeting of the Protocol between AdI and CERN.
CERN, O.Pinazza: ALICE TOF DCS1 ALICE TOF DCS Answers to DCS Commissioning and Installation related questions ALICE week at CERN O. Pinazza and.
ACC ? Detector PVSS II Ethernet Database(s) OPC client DIM client High VoltageLow Voltage User interface PVSS II LV PMD Control room (ACR) [FSM?]
ALICE Pixel Operational Experience R. Santoro On behalf of the ITS collaboration in the ALICE experiment at LHC.
Controls EN-ICE FSM for dummies (…w/ all my respects) 15 th Jan 09.
Alice MTR DCS F.Jouve 15 th DCS workshop CERN 13/03/2006 UX-A,B,D Detector PVSS II Detector Ethernet Database(s) OPC client DIM client 1672 Detector ?
XXVI workshop on resent developments in High Energy Physics and Cosmology Ancient Olympia,16-19 April 2008 Tsarouchas Charilaos NTUA Detector Control System.
Xavier Le Gouard Rich Power Supplies Monitoring and Control RICH Monitoring and Control using FSMs.
DCS overview - L.Jirdén1 ALICE ECS/DCS – project overview strategy and status L.Jirden u Organization u DCS system overview u Implementation.
Clara Gaspar, April 2006 LHCb Experiment Control System Scope, Status & Worries.
T0 DCS Status DCS Workshop March 2006 T.Karavicheva on behalf of T0 team.
22/May/02 JCOP meeting G. De Catatldo-A.Franco INFN Bari Italy 1 The Control System of the HMPID up to the end of 2001 ; 2002: The FSM toolkit, Hierarchy.
DCS workshop,march 10th P.Saturnini, F. Jouve Slow control trigger of the muon arm Muon trigger of the muon arm Low voltage VME Crate External parameters.
André Augustinus 17 June 2002 Detector URD summaries or, what we understand from your URD.
DCS Meeting - 17/6/2002 G. De Cataldo, A.Franco - INFN Bari - 1 The implementation of the HMPID DCS in the PVSS-JCOP Framework The Liquid Circulation and.
André Augustinus 18 March 2002 ALICE Detector Controls Requirements.
CLAS12 ECAL PCAL DC FTOF... Region 2 DewPnt Region 3 Region 4 Region 1 Mod 1... Mod 2 HV TEMP LV Hierarchy of Slow Controls: Driven by Finite State Machine.
20OCT2009Calo Piquet Training Session - Xvc1 ECS Overview Piquet Training Session Cuvée 2009 Xavier Vilasis.
PVSS an industrial tool for slow control
ATLAS MDT HV – LV Detector Control System (DCS)
CMS – The Detector Control System
The LHCb Run Control System
RPC Detector Control System
TPC Detector Control System
The IFR Online Detector Control at the BaBar experiment at SLAC
Pierluigi Paolucci & Giovanni Polese
RPC Detector Control System: towards the final system
RPC Detector Control System
Pierluigi Paolucci & Giovanni Polese
Pierluigi Paolucci & Giovanni Polese
Pierluigi Paolucci & Giovanni Polese
Tools for the Automation of large distributed control systems
Pierluigi Paolucci & Giovanni Polese
Presentation transcript:

XXVI Workshop on Recent Developments in High Energy Physics and Cosmology Theodoros Argyropoulos NTUA DCS group Ancient Olympia 2008 ATLAS Cathode Strip Chambers Control System

Outlook HEP 2008, Ancient Olympia 2  CSC Geographical Position  Tools  CSC Control System  Conclusions  PVSS  FSM  FSM Architecture  Presentation of the user interfaces 19/4/2008

 Cathode Strip Chambers (CSCs) are placed in the small endcaps of the ATLAS muonspectrometer.  High values of pseudorapidity, | η |>2. CSC Geographical Position 3 HEP 2008, Ancient Olympia 19/4/2008

4 HEP 2008, Ancient Olympia CSC Chambers 19/4/2008

Tools 1.PVSS provides tools to Graphic User Interface, archive... (basically monitoring and controlling the hardware) 2.SMI++ tools are used to model Devices and sub-system behaviour and to automate their operations. 5 HEP 2008, Ancient Olympia 19/4/2008

PVSS II is a SCADA system. SCADA stands for Supervisory Control And Data Acquisition. PVSS is used to connect to hardware (or software) devices, acquire the data they produce and use it for their supervision, i.e. to monitor their behavior and to initialize, configure and operate them. A PVSS II system consists of function- specific managers known as managers. PVSS II 6 HEP 2008, Ancient Olympia 19/4/2008

…PVSS II With PVSS II it is also possible to Interconnect a number of autonomous systems into an overall system. This is the way that the DCS system of the ATLAS experiment works. CSC sub-detector is one of these subsystems. 7 HEP 2008, Ancient Olympia 19/4/2008

Finite State Machines (FSM)  To reduce the number of parameters exported and managed in the supervisory layer;  To give a certain level of automation at complex Detector Control System; 8 HEP 2008, Ancient Olympia 19/4/2008

...Finite State Machines (FSM) STATE: defines the “operational mode of the system” STATUS: gives more details about “how well the system is working”.  The “STATE” and “STATUS” are two aspects that work in parallel and provide all necessary information about the behaviour of any system at any level in the hierarchy.  The STATUS is useful to find out faster the information when an error occurs.  In ATLAS the STATUS names are fixed. 9 HEP 2008, Ancient Olympia 19/4/2008

CSC Control System 10

FSM Architecture Full local operation of sub detector (divided according to DAQ partition) Overall operation of the detector, control of all sub detectors. Not yet implemented 11 HEP 2008, Ancient Olympia 19/4/2008

User Interface  With the use of PVSS, there was created some expert panels for:  The User Interfaces for the people to work with  Storing data in the Data Base  Creating the Alarm text/status for the devices that are being used 12 HEP 2008, Ancient Olympia 19/4/2008

User Interface – Main Node State Status Take actions Alarm Table Main Panel Secondary Panel Commands Status & Alarms Overview of the PS and the Temps of the side PS and Temps Alarms 13 HEP 2008, Ancient Olympia 19/4/2008

Power Supply - Hardware  For the High Voltage we use:  1 SY1527 CAEN Mainframe  1 CAEN BranchController A1676  2 CAEN EasyCrates  12 CAEN EasyBoards of type A3540P 14 HEP 2008, Ancient Olympia 19/4/2008

Power Supply - Hardware HEP 2008, Ancient Olympia 15  For the Low Voltage we use:  6 Wiener Maraton power supplies  3 Remote Control Modules (RCM) 19/4/2008

Power Supply – User Interface High Voltage State/Status Low Voltage State/Status Voltage & Current Histograms Move Down to the chamber level 16 HEP 2008, Ancient Olympia 19/4/2008

Power Supply – User Interface Voltage & Current plots for all the channels Voltage & Current Actual Values Voltage & Current Settings More Down 17 HEP 2008, Ancient Olympia 19/4/2008

Power Supply – User Interface Voltage & Current Plots Channel Details Channel Mapping Switch Channel On & Off Change Channel Settings Configure the new Settings 18 HEP 2008, Ancient Olympia 19/4/2008

Temperatures – User Interface Temperatures State/Status Low Voltage State/Status Temperature Histogram Change mode to HV PS Down to the Chamber Level 19 HEP 2008, Ancient Olympia 19/4/2008

Temperatures – User Interface Temps & LV State/Status Value & Alarm text Temperature Plot 20 HEP 2008, Ancient Olympia If the temperature of a Sensor exceeds the limit of 35 degrees all the channels of the chamber are switched off. 19/4/2008

Conclusions The System is installed as a Local Control System Was tested by the CSC people and works.  Integrate it in the Muons Control System  Expand it to monitor the Gas and the Cooling System 21 HEP 2008, Ancient Olympia 19/4/2008