9-1 Project Management from Simple to Complex. 9-2 This work is licensed under the Creative Commons Attribution-Noncommercial-Share Alike 3.0 Unported.

Slides:



Advertisements
Similar presentations
Project Cost Management
Advertisements

Connoizor Enabling Performance for Businesses through Software Website: Contact:
Budget Management. 57 Budget Management Budget Development Good scheduling skills and abilities Understanding of the project scope Well developed WBS.
Project Cost Management Chapter 7
Chapter 6: Project Cost Management
Chapter 7: Project Cost Management
Monitoring and Control Earned Value Management (EVM)
Project Cost Management Sections of this presentation were adapted from A Guide to the Project Management Body of Knowledge 4 th Edition, Project Management.
Chapter 7: Project Cost Management
BTS730 Cost Management. Average cost overrun: –1995 CHAOS study: 189% of the original estimates –2001 study: 145%
Irwin/McGraw-Hill ©The McGraw-Hill Companies, 2000 Chapter 13 Progress and Performance Measurement and Evaluation.
Degree and Graduation Seminar Cost Management
Information Technology Project Management, Sixth Edition Note: See the text itself for full citations.
Monitoring and Controlling
Project Monitoring and Control. Introduction Goal: ensuring that the project is on time and on budget and/or highlight any deviation from the plan Areas.
Project Cost Management J.-S. Chou, P.E., Ph.D.. 2 Learning Objectives  Explain basic project cost management principles, concepts, and terms.  Discuss.
HIT241 - COST MANAGEMENT Introduction
Project Cost Management J.-S. Chou, P.E., Ph.D.. 2 Learning Objectives  Explain basic project cost management principles, concepts, and terms.  Discuss.
Project Cost Management
Progress and Performance Measurement and Evaluation CHAPTER THIRTEEN Student Version Copyright © 2011 by The McGraw-Hill Companies, Inc. All rights reserved.
Project Management 6e..
EARNED VALUE MANAGEMENT SYSTEM A Project Performance Tool
Earned Value Analysis by John Cornman. Introduction “Earned Value Analysis” is an industry standard way to measure a project’s progress, forecast its.
This work is licensed under a Creative Commons Attribution 3.0 Unported LicenseCreative Commons Attribution 3.0 Unported License (CC-BY). Project Management.
PowerPoint Presentation by Charlie Cook THE MANAGERIAL PROCESS Clifford F. Gray Eric W. Larson Progress and Performance Measurement and Evaluation Chapter.
Project Management Methodology Project monitoring and control.
Progress and Performance Measurement and Evaluation CHAPTER THIRTEEN Student Version Copyright © 2011 by The McGraw-Hill Companies, Inc. All rights reserved.
Chapter 13: Progress and Performance Measurement and Evaluation
Understanding Earned Value Analysis
PPMT CE-408T Engr. Faisal ur Rehman CED N-W.F.P UET P.
Conducted By: Dr. Madhu Fernando, PMP, DBA, MEng. MGT PROJECT MANAGEMENT LESSON 5 AND 6: PROJECT PLANNING – TIME AND COST PLANNING AND MANAGEMENT.
Project Cost Management. Information Technology Project Management, Fourth Edition 2 Learning Objectives Explain basic project cost management principles,
PowerPoint Presentation by Charlie Cook Copyright © 2006 The McGraw-Hill Companies. All rights reserved. THE MANAGERIAL PROCESS Clifford F. Gray Eric W.
Project Cost Management
Software Project Management (SPM)
7-1 Project Management from Simple to Complex. 7-2 This work is licensed under the Creative Commons Attribution-Noncommercial-Share Alike 3.0 Unported.
EARNED VALUE MANAGEMENT (EVM)
Project Cost Management
PowerPoint Presentation by Charlie Cook Copyright © 2006 The McGraw-Hill Companies. All rights reserved. THE MANAGERIAL PROCESS Clifford F. Gray Eric W.
Chapter 7: Project Cost Management
Evaluating EVM January 13, EVM Issues and Opportunities ▪ EVM Basics ▪ EVM Issues ▪ EVM ETC and EAC Calculations ▪ EVM Cost and Schedule Value Calculations.
Introduction To Earned Value November 14, Definition Earned Value is a method for measuring project performance. It compares the amount of work.
Earned Value Analysis Tracking Project Progress. Introduction | Components | Project Scenario | Values | Calculations | Forecasts | Summary l What Is.
1 Earned value analysis Planned value (PV) or Budgeted cost of work scheduled (BCWS) – original estimate of the effort/cost to complete a task (compare.
Information Technology Project Management, Six th Edition Kathy Schwalbe Copyright Disampaikan Oleh : Wiwid Dolianto S.Kom, MT Universitas Muhammadiyah.
EARNED VALUE  Earned Value Management Systems  Earned Value Analysis.
1 Chapter 7: Project Cost Management. 2 Learning Objectives Understand the importance of good project cost management Explain basic project cost management.
Chapter 6 Project Cost Management. 2 Learning Objectives Explain basic project cost management principles, concepts, and terms. Discuss different types.
Information Technology Project Management, Seventh Edition Note: See the text itself for full citations.
Agenda ‒ Cost Management ‒ Cost Budgeting ‒ Cost Control Learning Goals 1.Cost Control 2.Earned Value Management.
Developing the schedule – Tracking Gantt charts Critical path method – Longest path, earliest time Schedule trade-offs using CPM – Free slack, total slack.
Project Cost Management
Earned Value Analysis by Miles M. Hamby, PhD Copyright©2014 Miles M
Budget Planning.
CHAPTER:7 Project Cost Management
Earned Value Management
Project Management – PTM712S
Chapter 7: Project Cost Management
Project Communication, Tracking, and Reporting
Earned Value Management
Project Cost Management
Understanding Earned Value Analysis
Understanding Earned Value Analysis
Chapter 7: Project Cost Management
Project Cost Management
Earned Value Measures Planned Value (PV) Earned Value (EV)
Project Cost Management
Monitoring and Controlling
Understanding Earned Value Analysis
Chapter 7: Project Cost Management
Presentation transcript:

9-1 Project Management from Simple to Complex

9-2 This work is licensed under the Creative Commons Attribution-Noncommercial-Share Alike 3.0 Unported License. To view a copy of this license, visit send a letter to Creative Commons, 171 Second Street, Suite 300, San Francisco, California, 94105, USA

9-3 Chapter 9 Estimating and Managing Costs

9-4 Learning Objectives Describe methods of estimating costs Identify the effects of project phase and complexity on the choice of estimating method Describe the method of combining cost estimates with a schedule to create a budget Describe methods to manage cash flow Describe the terms and relationships of budget factors used in earned value analysis

9-5 Learning Objectives Calculate and interpret budget and schedule variances Calculate and interpret the schedule performance index and the cost performance index Calculate and interpret estimates to complete the project Calculate the revised final budget

9-6 Estimating Costs to Compare and Select Projects Economic factors are an important consideration when choosing between competing projects To compare the simple paybacks/internal rates of return between projects, an estimate of the cost of each project is made The estimates must be accurate enough so that the comparisons are meaningful

9-7 Estimating Costs to Compare and Select Projects Compared to later phases, the methods of estimating project costs during the selection phase: – Are faster – Consume fewer resources – Rely on expert judgment of experienced managers Expert judgment: Decisions based on incomplete information made by people who have extensive personal experience

9-8 Estimating Costs to Compare and Select Projects Analogous estimate: Budget estimate based on a similar project Parametric estimate: Estimates that are calculated by multiplying measured parameters by cost-per-unit values

9-9 Estimating Costs to Initiate Projects Vendor bid analysis – An RFP is issued and sent to a list of qualified vendors – Vendors respond with a proposal and an estimate of the cost – The project management team reviews the vendor responses – The project selection decision might have to be reconsidered if: Vendors’ estimates are much higher than expected The project cannot be completed for the cost that was used to select the project

9-10 Estimating Costs to Initiate Projects Bottom-up estimating: Sum of estimates of each detail of the activity and project – Very accurate – Time-consuming – On projects with low complexity, the cost estimates can be done on spreadsheet software – On larger projects, software that manages schedules can manage and display costs by activity and category

9-11 Figure Detailed Cost Estimate Click below to view full-size

9-12 Figure Sum of Detailed Costs by Type Click below to view full-size

9-13 Estimating Costs to Initiate Projects Activity-based estimates – An activity can have costs from more than one vendor plus costs for labor and materials from internal sources – Detailed estimates from all sources are reorganized – Costs associated with a particular activity are grouped by adding the activity code to the detailed estimate

9-14 Figure Detailed Costs Associated with Activities Click below to view full-size

9-15 Estimating Costs to Initiate Projects Establishing a Budget – Determine how much money is needed for: Each group of tasks The whole project – Cost aggregation: Sum of component costs – Transfer of money to the project account must be appropriately timed – Reconciliation: Matching funds provided with funds spent

9-16 Figure Fund Transfers and Expenditures Click below to view full-size

9-17 Managing the Budget Funding for the project should be available when it is needed Financial people prefer to keep the company’s money working in other investments before transferring it to the project account The project manager prefers to have as much cash available as possible to use if activities exceed budget expectations

9-18 Managing the Budget Contingency reserve: Money held to pay for predictable but unspecified extra costs – Likely to be spent – Part of the total budget for the project Management reserve: Money available for changing project scope – Not likely to be spent – Not part of the project’s budget baseline – Can be included in the total project budget

9-19 Evaluating the Budget Earned value management (EVM): Method of comparing the budgeted and actual costs of a project during the project – Budgeted cost of work scheduled (BCWS): All the items in the cost estimate – Planned value (PV): Sum of the items in the BCWS that should have been spent by a particular day – Budgeted cost of work performed (BCWP): The budgeted cost of work scheduled that has been done – Earned value (EV): Sum of budgeted expenses up to a particular point in the schedule – Actual cost (AC): Sum of money spent so far

9-20

9-21

9-22

9-23

9-24

9-25 Figure Planned Value, Earned Value, and Actual Cost Click below to view full-size

9-26 Evaluating the Budget Schedule variance (SV): Difference between earned value and planned value – SV = EV − PV – A negative schedule variance means the project is behind schedule Cost variance: Difference between earned value and actual cost – CV = EV − AC – A positive CV indicates the project is under budget

Evaluating the Budget Schedule performance index (SPI): Ratio of earned value to planned value – SPI = EV/PV – A SPI value less than one indicates the project is behind schedule Cost performance index (CPI): Ratio of earned value to actual cost – CPI = EV/AC

9-28 Evaluating the Budget Estimate to complete (ETC): Estimate of the amount of money needed to complete the unfinished part of the project Atypical cost variance – ETC = Budget at completion (BAC) − Earned value (EV) Budget at completion: Budget for the entire project Typical cost variance – ETC = (BAC – EV)/CPI CPI: Cost performance index

9-29 Evaluating the Budget Estimate at completion (EAC): Revised project budget based on actual cost to date plus the estimate to complete (ETC) – EAC = AC + ETC

9-30 Figure Summary of Terms and Formulas for Earned Value Analysis Click below to view full-size