CONSTRUCTION CONTRACTS PRIME CONTRACTS Format and Major Components CHAPTER - 4.

Slides:



Advertisements
Similar presentations
PRE-QUALIFICATION/ SHORT LISTING OF CONSULTANTS PRE-QUALIFICATION/ SHORT LISTING OF CONSULTANTS.
Advertisements

Construction Contracting
Field Orders on Construction Contracts Guidance Document CLC-8 May 13, 2013.
THE PARTIES TO CONSTRUCTION-RELATED PRIME CONTRACTS Construction-related prime contracts involve owners, architect/engineers, construction managers, and.
Presented by: Fouad Al-Malazi ID No.: Managing Construction Contracts By Robert D. Gilbreath Chapter 1 CONSTRUCTION CONTRACTS: Roles and Relationships.
USDA Child Nutrition Programs.  Procurement (purchasing rules) must apply to all purchases that are supported, in whole or in part, with non-profit food.
Session 8 Implementing PPPs
Bidding Requirements ACT 380. Objective Provide an overview of the bidding process, including documents included in the bidding requirements.
Presented by: Kathryn Hodges, NH
Alternative Project Delivery Mechanisms The J. K. Spruce Experience Katherine Yates Assistant General Counsel.
Procurement and Tendering Presentation to [NAME OF CLIENT] [YOUR NAME] [DATE]
Marcy Mealy Procurement Specialist CDBG Program
Discussion on SA-500 – AUDIT EVIDENCE
ARCH 330 Contract Documents to Specifications. Contract Documents: Are defined as the legally enforceable requirements that become part of the contract.
CIVL202 Construction Engineering I
PROJECT DELIVERY SYSTEMS
PROCEDURES FOR SELECTING THE CONTRACTOR
Lecture(3) Instructor : Dr. Abed Al-Majed Nassar
Construction Engineering 221 Drawings and Specifications.
Construction Industry Development Board development through partnership Construction Procurement documents 2c.
Construction Engineering 380 Professional Design Services Chapter 12 Appendix G.
Construction Engineering 221 Cost Estimating and Bidding.
WELCOME TO THE PROCUREMENT SEMINAR Procurement and Contracts An Overview of Contract Administration.
Construction Contract Documents
What Are Construction Documents Construction documents serve as a means of obtaining bids from contractors and are used by contractors to obtain price.
Construction Specifications
Nabil dmaidi1 Bid Submission Documents A LATE BID IS NO BID.
Chapter 42 Construction Specifications. 2 Links for Chapter 42 Introduction Construction Specifications Construction Documents.
Construction Contracts and Project Delivery Methods
S10 CONS5Q25 Lara Tookey. Review of estimators workings Decision on what margin to apply Bid submission details Submit your Tender.
Public Procurement Procedure – Bidding Documents
YUSUF OZ FATIH BOLUKBAS HUSEYIN ANIL KARABULUT. A contract is a legally binding agreement between two or more parties.
CHAPTER#08 MANAGEMENT OF TECHNICAL PROPOSALS AND SPECIFICATIONS Lecture No. 08 Course: Engineering Management 19 april 2013 MED DEPARTMENT, U.E.T TAXILA.
Advanced Project Management Project Procurement/Contract Management Ghazala Amin.
1 Procurement. 2 Overview Every municipality should keep procurement records that allow an auditor or other interested party to track the specific nature.
Construction Documents ACT Objective To acquire a basic understanding of the contents and relationship between the documents which make up the.
CONSTRUCTION CONTRACTS DOCUEMENTS
PSU ISQA 440, Spring, 2012 Governmental Procurement 1 The Structure of Oregon Law Lloyd Rain Associates
ARC 807: Professional Practice and Procedure Department of Architecture, Federal University of Technology, Akure, Nigeria ARC 807: Professional Practice.
IDM Chapter 104 Utility Coordination Gail Lee Utility and Railroad Engineer, INDOT June 10, 2015.
Conditions of the Contract ACT Objective To provide an overview of the Conditions of the Contract, their purpose, content, and relationship to.
PROJECT PHASES ACT Objective To provide an understanding of the design & construction process and the roles of the different participants in this.
Introduction Procurement of Consultant Services (based on PPA 2004 and Best Practices) Presented by: NM Lema Macrh, 2013.
34 Specifications Chapter Permission granted to reproduce for educational use only.© Goodheart-Willcox Co., Inc. Objectives Explain the purpose of specifications.
MGT 575 Summer 2008 Purchasing. MGT 575 Summer 2008 Steps in the Purchasing Process Accurate description of desired commodity or service Selection of.
Project Procurement Management
Elevating the Quality of Life in the District Contracting and Procurement Division Information Session 2 Request for Proposal November 5, 2015.
1 CONTRACTING. 2 WHAT IS CONTRACTING ? CONTRACTING IS BASICALLY AN AGREEMENT BETWEEN TWO PARTIES, ONE CALLED THE CONTRACTING PARTY AND THE OTHER THE CONTRACTED.
TOTAL QUALITY MANAGEMENT
Uniform Grant Guidance Roundtable Discussion: October 5, 2015 Procurement 1.
UNIVERSITY OF DAR ES SALAAM t Selection and Employment of Consultants Negotiations with Consultants; Monitoring Performance of Consultants; Resolving Disputes.
Introduction to Procurement for Public Housing Authorities Sealed Bids Unit 5.
The Public Tendering and Bidding (招投标) Law of the People's Republic of China Effective since January 1, 2000.
Building Capacity of SMEs for Participation in Public Procurement Draft Presentation for Training of Trainers June 2014.
English for Construction Engineering Management ,建筑工 程专业英语 赖小东 授课教师:赖小东 Cell# 江西财经大学旅游与城市管理学院工程管理系.
Building Capacity of SMEs for Participation in Public Procurement Draft Presentation for Training of Trainers June 2014.
FIDIC Tendering Procedures
Introduction to FIDIC - Manuals
Technical Specifications & Employer's Requirements
Administration of a FIDIC Contract - Project Control
Administration of a FIDIC Contract - Commencement Date to + 28 Days -
Particular Conditions of Contract & Appendix to Tender
Drawings Introduction to FIDIC - Drawings -.
Bidding Requirements Review Questions.
Particular Conditions of Contract & Appendix to Tender
9/18/2018 Bids CONTRACTING Khamis…..
Department of Community Development
FIVE PROJECT PHASES 5C-3 Sun. 8:00-10:00am 21/ 2/2016.
Designers’ Manual Appendix Contents
Presentation transcript:

CONSTRUCTION CONTRACTS PRIME CONTRACTS Format and Major Components CHAPTER - 4

STANDARD FORMS-OF-CONTRACT American Institute of Architects (AIA) Contracts –Standard form of Agreement Between Owner and Contractor –Most widely used form for fixed-price building construction works in USA. FIDIC - International Federation of Consulting Engineers – act.asphttp://www1.fidic.org/resources/contracts/which_contr act.asp

Conditions of Contract for Construction, which are recommended for building or engineering works designed by the Employer or by his representative, the Engineer. Under the usual arrangements for this type of contract, the Contractor constructs the works in accordance with a design provided by the Employer. However, the works may include some elements of Contractor-designed civil, mechanical, electrical and/or construction works. These Conditions of Contract are recommended for engineering and building work of relatively small capital value. However, depending on the type of work and the circumstances, the Conditions may be suitable for contracts of considerably greater value. They are considered most likely to be suitable for fairly simple or repetitive work or work of short duration without the need for specialist sub-contracts. This form may also be suitable for contracts which include, or wholly comprise, contractor-designed civil engineering, building, mechanical and/or electrical works.

Conditions of Contract for Plant and Design-Build, which are recommended for the provision of electrical and/or mechanical plant, and for the design and execution of building or engineering works. Under the usual arrangements for this type of contract, the Contractor designs and provides, in accordance with the Employer’s requirements, plant and/or other works; which may include any combination of civil, mechanical, electrical and/or construction works Conditions of Contract for EPC Turnkey Projects, which are recommended where one entity takes total responsibility for the design and execution of an engineering project. Under the usual arrangements for this type of contract, the entity carries out all the Engineering, Procurement and Construction: providing a fully- equipped facility, ready for operation (at the "turn of the key"). This type of contract is usually negotiated between the parties.

The purpose of these guidelines is to present the commonly used methods of consultant selection, to explain the respective procedures and to combine them all in one compact document, as well as to emphasize and explain FIDIC's policies on the subject of selection. The terms of the Client Consultant Model Services agreement (The White Book) have been prepared by FIDIC and are recommended for general use for the purposes of pre-investment and feasibility studies, designs and administration of construction and project management, where proposals for such services are invited on an international basis: They are equally adaptable for domestic agreements.

Sub-consultancy Agreement

STANDARD FORMS OF CONTRACT-INDIA CPWD MES State PWD Model Standard Contract For Domestic Construction – CIDC ONE-OF-A-KIND CONTRACTS –Created for a particular project –Little about them is standard or traditional

TYPICAL DOCUMENTS COMPRISING THE CONTRACT Bidding documents consisting of the Invitation to Bid, the Instruction to Bidders, and the Bid Form General Conditions of Contract Special Conditions of Contract Specifications Drawings Reports of investigations of physical conditions

BIDDING DOCUMENTS Normally begins with an advertisement –Identifies the project for which bids are desired –The owner –Time and place of bid opening –Instructions to potential bidders on how to obtain a full set of contract documents Invitation for Bids (IFB) or Request for Proposals (RFP) –IFB used when bidders must strictly confirm to drawing and specs. –RFP when bidders may propose variations for the project

IFB or RFP typically include: –A description of the contract work –The identity of the owner –The place, date, and precise time of the bid opening –The penal sum of the required bonds (bid bond, performance bond etc.) –A description of the drawings and specs, their cost, and where they may be obtained –Rules regarding withdrawal, modifications, late bids etc. BIDDING DOCUMENTS

Instructions to Bidders Bid Form –Bidders complete this document, sign, seal and turn it in –Constitutes the “offer” –To constitute a responsive bid, the bid form must be completely filled, signed and sealed in accordance with the IFB or RFP and Instructions to Bidders

BIDDING DOCUMENTS Bid Forms Contents –A definitive statement of the general terms and conditions of the offer –The format of the commercial terms applying to the offer –Supplementary information that the owner may want to know about the bidder –Requirement for public projects –Bid security

GENERAL CONDITIONS OF CONTRACT Very definitive statements, clause by clause, of all general terms and conditions that will govern the performance of the contract work The general concept of this section is to include all clauses that will remain the same, contract after contract, changing very infrequently

SPECIAL CONDITIONS OF CONTRACT Also known as Supplementary Conditions Project specific matters Those that are either site specific or in some other way apply only to the specific contract

SPECIFICATIONS The technical requirements for each division of work in the contract will be completely detailed in specifications Conforms to Uniform Construction Index or Master spec format Should be carefully drafted so that both parties to the contract have a mutual understanding of the precise technical requirements

DRAWINGS Complement the specifications Should be sufficiently clear to adequately show exactly what is to be built Certain features may be shown in fairly general terms, requiring the contractor to prepare the detailed drawings In fixed-priced bids should be adequately sufficient and clear

REPORTS OF INVESTIGATION OF PHYSICAL CONDITIONS Often concern the geotechnical aspects of subsurface conditions Usually appear in the form of written evaluations and soil boring logs Other examples are weather records, stream flow hydrographs etc. Is such material to be considered part of the contract documents? Owners often use disclaimers, to escape liability