PSB MPS Building 245 CV Status EN-CV-PJMichel OBRECHT – Frédéric TEIXEIRA2014-03-27.

Slides:



Advertisements
Similar presentations
BEPCII RF POWER SYSTEM RF group, IHEP Sep ~ April 1.The 1 st transmitter had finished installing,commissioning and SAT (Site Acceptance Test).
Advertisements

Russ Rucinski, FNAL, Oct. 8, MICE Cryostat Status 1.Prototype cryostat A. Status & Plans B. Parts C. Operating data (supplemental) 2.Four final cryostats.
A New Building Data Center Upgrade capacity and technology step 2011 – May the 4 th– Hepix spring meeting Darmstadt (de) Pascal Trouvé (Facility Manager.
M. Battistin – 1 st September 2009 EN/CV/DC 1 M. Battistin (EN/CV/DC) 1 st October 2009 ATLAS cooling Group - Thermosiphon solution for ATLAS ID cooling.
For more information, please contact 19/11/2010 EN/CV/DC Chiller design and purchase by Elena Perez Rodriguez.
Paolo Guglielmini TS / CV / DC08th April 2005 BIDDERS’ CONFERENCE Invitation to Tender 3307 Supply and Installation of water cooling equipment for the.
EvergreenEcon.com Heat Pump Water Heater Model Validation, Market Progress Assessment, and Process Evaluation RTF HPWH Sub-Committee Meeting October 15,
+ STAR HFT Upgrade – Installation and Integration Rahul Sharma Brookhaven National Laboratory.
Detector Cooling Project Thermosiphon Project Status Report
Data centre air management Case studies Sophia Flucker.
Electrical Integration CM38 Steve Griffiths & Ian Mullacrane.
F-595 Chiller contract report Jose Botelho Direito EN/CV/DC Thermosyphon cooling workshop §5 Thursday, October 20, 2011.
ISOLDE: Status report building th ISCC meeting CERN, 31 March 2014 Erwin Siesling, Magda Kowalska.
Bulding 245 schedule update LIU Booster Meeting Fulvio Boattini & Michel Obrecht TE-EPC / EN-CV TEEPC.
IT-4082 Design, Supply, Installation and Commissioning of the ventilation of the BAF3 building Alexandre Broche EN-CV-PJ.
ISOLDE: Status report building th ISCC meeting CERN, 22 October 2013 Maria Borge, Erwin Siesling.
Subcommittee 20 Supply Chain Management Report for Subcommittee 18 January 2015.
19 th November 2010EN/CV/DC Thermosiphon project IV review - Overall cost estimation and planning Michele Battistin Elena Perez Rodriguez 19 th November.
D. Gasser ST/CV 1 Fluid distribution from UW85 Fully available now.
Project schedule and status R. Guida, F. Ravotti, D. Pfeiffer November 14th, 2012 GIF++ users meeting.
Bulding 245 schedule update LIU Booster Meeting Fulvio Boattini TE-EPC TEEPC.
Computing Facilities CERN IT Department CH-1211 Geneva 23 Switzerland t CF CERN Computer Centre Upgrade Project Wayne Salter HEPiX November.
M. Battistin – 1 st September 2009 EN/CV/DC 1 M. Battistin (EN/CV/DC) 1 st September 2009 ATLAS Working Group Thermo-siphon review - Low temperature condensation.
Paolo Guglielmini - TS / CV LHCb Install Meeting - 20/04/2005 LHCb Install Meeting 20/04/05 TS / CV / Detector Cooling Installations.
Paolo Guglielmini - TS / CV LHCb Install Meeting - 12/10/2005 LHCb - Install Meeting 12/10/05 TS/CV/DC Installations STATUS Ongoing works 1.chilled / mixed.
MICE Oversight Committee Meeting RAL, 24 April 2014 Paul Soler on behalf of the MICE Collaboration Status of MICE and Spectrometer Solenoids.
S. Claudet - 31st May 2007Power refrigeration for LHC Power refrigeration at 4.5K & 1.8K for the LHC S. Claudet, CERN AT-ACR.
Computing Facilities CERN IT Department CH-1211 Geneva 23 Switzerland t CF CERN Computer Centre Consolidation Project Vincent Doré IT Technical.
The Building 180 Cryogenic infrastructure water cooling system Stefano Moccia, EN-CV Coordination meeting 26/09/14.
The Building 180 Cryogenic infrastructure water cooling system Status Update Stefano Moccia, EN-CV Coordination meeting 14/10/15.
2011 Calendar Important Dates/Events/Homework. SunSatFriThursWedTuesMon January
Thermosiphon project management and quality assurance EN/CV/DC Presentation done by Elena Perez Rodriguez For further information contact
IBL CO 2 cooling planning 03 July 2013 Jan Godlewski, Bart Verlaat, Lukasz Zwalinski 1
ISOLDE: Status report building th ISCC meeting CERN, 24 June 2014 Erwin Siesling, Magda Kowalska.
For more information, please contact 14/12/2010 EN/CV/DC Technical specification IT-3684 by Elena Perez Rodriguez.
1 S-FRS Magnet Test Bench SuperFRS Magnet Test Bench Power Converter Status H. Thiesen 13 May 2015.
A.Henriques (JCOV meeting 31/5/2001) ATLAS Calorimeter cooling project Goal: u Definition of a common frame work for the cooling of the ATLAS calorimeter.
SPS 200 MHz RF Upgrade Eric Montesinos LIU-SPS coordination meeting 17 th December 2013.
EN-CV Progress EHN1 Extension Project Jérôme Rodary EN-CV-PJ 2016/01/21.
Status of Review October,  Metals Translators  Human Health Criteria  Cadmium and Silver Criteria  Ammonia  Spill Notification  Reasonable.
SPS 200 MHz RF Upgrade Eric Montesinos LIU-SPS coordination meeting 15 th August 2012.
LHC cycle power consumption FCC I&O meeting 23 rd September 2015 D Bozzini & G. Peon EDMS xxxxx.
MICE RF – Installation at RAL Tim Stanley RAL 7 November 2013.
MICE RF – Installation at RAL Tim Stanley, MICE RF Engineer, RAL 2 June 2014.
110 th November 2010EN/CV/DC Detector Cooling Project - advancement status of Work Package N3 Thermosiphon project Michele Battistin 18 May 2011.
M. Battistin –6 th July 2009 EN/CV/DC 1 M. Battistin (EN/CV/DC) 6 th July 2009 DCP WP3 First thermo-siphon workshop - Low temperature condensation.
Warm cabling, cooling and ventilation L. Tavian, ATS-DO On behalf and under the controls of SWP17.2 and SWP17.3 Conceptual Design Review of the Magnet.
CV Activities for PSB-LIU POPS-B (new MPS for the PSB-LIU) B 245 PSB Demi water cooling plant Stefano Moccia, EN-CV Meeting 07/03/16.
V Thermo-siphon Workshop Test protocol Jan Godlewski PH/DT-PO On behalf of thermo-siphon working group
5K shield removal experiment in STF cryomodule Norihito Ohuchi 2008/11/181ILC08-GDE-Meeting (CHICAGO)
EN-CV Progress EHN1 Extension Project Jérôme Rodary EN-CV-PJ 2016/01/14.
EN-CV Progress EHN1 Extension Project Jérôme Rodary EN-CV-PJ 2016/02/04.
S A Griffiths CM42 June 2015 Electrical & Control.
POPS-B Project Update 07 June 2016 POPS-B: Project update and Feedback from POPS Experience LIU-PSB Meeting June 2016 Fulvio Boattini TE/EPC 2.
Update on the PSB Cooling and Ventilation Systems
Demineralised water cooling system
SR1 extension follow up 27-Mar-17 Marco Ciapetti.
Feb March April May June July Spiral 1 Spiral 2
CBETA Technical Review
PSB/PS/TT2/Linac2-3 YETS 2017–2018 & LS2 preparation meeting
Cooling systems for HL-LHC (WP17.3)
Thermal Energy Storage
EN-CV interventions during EYETS for PS and PSB
ATLAS Thermosiphon Electrical Distribution and Run Modes
East Hall under construction
5th Review Committee October 4th, 2004 Facilities and Schedule C
Elettra – Sincrotrone Trieste S.C.p.A.
Buildings Entrance Tunnel. 5th Review Committee October 4th, 2004 Buildings, Facilities and Schedule C. Sanelli.
Aziz AMAMOU EACM – 21th May 2019
2015 January February March April May June July August September
Presentation transcript:

PSB MPS Building 245 CV Status EN-CV-PJMichel OBRECHT – Frédéric TEIXEIRA

CV Planning – First draft

physicsLS1physicsLS2physics May 2016 Building Ready No ressources Services Integration (EL, CV,..) GS/SE studies and procurement Building construction Power converter Design & specification Market Survey & Call for tender Power converter Design (supplier) Power converter construction Power converter Installation and cold commissioning System commissioning on PSB magnets 17 October March March 2015 FC 25 August June 2014 FC 14 April 2017 Start Commissioning on dummy load Power converter commissioning on test magnets Project Time Schedule

CV – Cost estimation

CV – Electrical supply

Building 245 CV Conceptual Design URS inputs Cooling power on water: confirmed 470 kW = 2 units at 100% + 30% of the third unit Flow rate, delta T of 2.3 °C, Conductivity of the water confirmed, maxi 0,8 micro S/cm at 30 °C, Need to run independently : 2 fully independent stations for cooling located in the new building, Requirements for internal temperature revised, 26 °C in summer with maxi of 30 °C during limited periods Conceptual Design based on : Independent cooling station : Cost optimised Air conditioning system : No chilled water production, Indirect adiabatic cooling system, Units placed on the roof,

Building 245 CV Conceptual Design

CV - Integration