Fermilab, April 8 th, 2003F.Roncarolo 1 CERN SPS Emittance Measurements F. Roncarolo, CERN AB/BDI University of Lausanne Acknowledgments: B.Dehning, R.Jung,

Slides:



Advertisements
Similar presentations
FNAL Emittance Devices Flying Wires (FW) Sync Lite Ion Profile Monitors (IPM) aah,6/20/2000.
Advertisements

Low energy electron beam as a nondestructive diagnostic tool for high power beams. P. Logachev, D. Malutin, A. Starostenko, BINP, RUPAC’2006, Novosibirsk.
March 14-15, 2007ECloud Feedback, IUCF1 Electron-Cloud Effects in Fermilab Booster K.Y. Ng Fermilab Electron-Cloud Feedback Workshop IUCF, Indiana March.
AGS pp Status Feb. 6, 2015 RSC Meeting Haixin Huang.
Ulrich RaichLinac-4 instrumentation day May 2007 Longitudinal Bunch Shape Monitor U. Raich.
Matching and Synchrotron Light Diagnostics F.Roncarolo, E.Bravin, S.Burger, A.Goldblatt, G.Trad.
Searching for Quantum LOVE at the Australian Synchrotron Light Source Eugene Tan On behalf of Rohan Dowd 120/10/2010Eugene Tan – IWLC 2010, Genega ASLS.
Beam profile measurements based on modern vertex detectors and beam-gas interactions Slides from: Colin Barschel - TIPP 2014 third international conference.
Loss maps of RHIC Guillaume Robert-Demolaize, BNL CERN-GSI Meeting on Collective Effects, 2-3 October 2007 Beam losses, halo generation, and Collimation.
The LHC: an Accelerated Overview Jonathan Walsh May 2, 2006.
Eric Prebys USPAS, Knoxville, TN, Jan , 2014.
AB-ABP/LHC Injector Synchrotrons Section CERN, Giovanni Rumolo 1 Final results of the E-Cloud Instability MDs at the SPS (26 and 55 GeV/c) G.
SPS scrubbing experience: electron cloud observables L. Mether on behalf of the LIU-SPS e-cloud team LIU SPS scrubbing review, September 8, 2015.
H. Bartosik, K. Cornelis, A. Guerrero, B. Mikulek, G. Rumolo, Y. Papaphilippou, B. Salvant, E. Shaposhnikova June 16 th, 2011.
1 Status of EMMA Shinji Machida CCLRC/RAL/ASTeC 23 April, ffag/machida_ ppt & pdf.
AAC February 4-6, 2003 Protons on Target Ioanis Kourbanis MI/Beams.
Details of space charge calculations for J-PARC rings.
Mathilde FAVIER Fellow in BE/BI/QP Mathilde FAVIER BE/BI-QPSCHOTTKY STATUS - BI DAY - December 6th
October 4-5, Electron Lens Beam Physics Overview Yun Luo for RHIC e-lens team October 4-5, 2010 Electron Lens.
Simulation of direct space charge in Booster by using MAD program Y.Alexahin, A.Drozhdin, N.Kazarinov.
CASA Collider Design Review Retreat HERA The Only Lepton-Hadron Collider Ever Been Built Worldwide Yuhong Zhang February 24, 2010.
Diagnostics for intense e-cooled ion beams by Vsevolod Kamerdzhiev Forschungszentrum Jülich, IKP, COSY ICFA-HB2004, Bensheim, October 19, 2004.
C. Fischer – LHC Instrumentation Review – 19-20/11/2001 Gas Monitors for Transverse Distribution Studies in the LHC LHC Instrumentation Review Workshop.
1 FFAG Role as Muon Accelerators Shinji Machida ASTeC/STFC/RAL 15 November, /machida/doc/othertalks/machida_ pdf/machida/doc/othertalks/machida_ pdf.
Tests of AWAKE spectrometer screen and camera at PHIN Introduction Layout Procedure Setup, results (runs 1 – 5) Conclusions L. Deacon, S. Mazzoni, B. Biskup.
8/12/2000Guy Crockford BI days New application software for SPS wire scanner controls G.Crockford SL/OP.
Chromaticity dependence of the vertical effective impedance in the PS Chromaticity dependence of the vertical effective impedance in the PS S. Persichelli.
Vertical Emittance Tuning at the Australian Synchrotron Light Source Rohan Dowd Presented by Eugene Tan.
28-May-2008Non-linear Beam Dynamics WS1 On Injection Beam Loss at the SPring-8 Storage Ring Masaru TAKAO & J. Schimizu, K. Soutome, and H. Tanaka JASRI.
Damping Ring Parameters and Interface to Sources S. Guiducci BTR, LNF 7 July 2011.
RHIC Run11 Summary May 6, 2011 RSC Meeting Haixin Huang Luminosity Availability Polarization RHIC setup issues.
4 th Order Resonance at the PS R. WASEF, S. Gilardoni, S. Machida Acknowledgements: A. Huschauer, G. Sterbini SC meeting, 05/03/15.
Update on injection studies of LHC beams from Linac4 V. Forte (BE/ABP-HSC) Acknowledgements: J. Abelleira, C. Bracco, E. Benedetto, S. Hancock, M. Kowalska.
1 Experience at CERN with luminosity monitoring and calibration, ISR, SPS proton antiproton collider, LEP, and comments for LHC… Werner Herr and Rüdiger.
The SPS as a Damping Ring Test Facility for CLIC March 6 th, 2013 Yannis PAPAPHILIPPOU CERN CLIC Collaboration Working meeting.
Andreas Jansson, "Quadrupole Pick-ups", LHC BI-Review, November 19-20, Quadrupole Pick-ups  What is a quadrupole pick-up?  PS pick-ups and experimental.
SPS proton beam for AWAKE E. Shaposhnikova 13 th AWAKE PEB Meeting With contributions from T. Argyropoulos, T. Bohl, H. Bartosik, S. Cettour.
09-21 Study of bunch length limits Goals: To identify and observe effects which put limits on the minimum bunch length in RHIC. Try to distiguish the limitation.
The Introduction to CSNS Accelerators Oct. 5, 2010 Sheng Wang AP group, Accelerator Centre,IHEP, CAS.
Electron Spectrometer: Status July 14 Simon Jolly, Lawrence Deacon 1 st July 2014.
Comparison of stainless steel and enamel clearing electrodes E. Mahner, F. Caspers, T. Kroyer Acknowledgements to G. Arduini, H. Damerau, S. Hancock, B.
Robert R. Wilson Prize Talk John Peoples April APS Meeting: February 14,
F f Quadrupole Pick-Ups at CERN & Fermilab A.Jansson FNAL.
Pushing the space charge limit in the CERN LHC injectors H. Bartosik for the CERN space charge team with contributions from S. Gilardoni, A. Huschauer,
Beam on Target Diagnostics Beam on Target Meeting 2013 March Tom Shea.
Beam Diagnostics Seminar, Nov.05, 2009 Das Tune-Meßverfahren für das neue POSI am SIS-18 U. Rauch GSI - Strahldiagnose.
AB/BI J. Koopman New WS design - Brain storm session 18/06/2007 1/16 New WS design - Brain storm session.
Summary of ions measurements in 2015 and priorities for 2016 studies E. Shaposhnikova 3/02/2016 Based on input from H. Bartosik, T. Bohl, B. Goddard, V.
Requirements from BI and new instruments after LS1 LHC Optics Measurement and Correction Review; B.Dehning 1 Bernd Dehning CERN BE/BI
W. Blokland*, R. Potts#, S. Cousineau#
LHC Wire Scanner Calibration
Cryo Problem MD Planning Tue (1.11.) C B Day Time MD MP Tue 01:00
Space charge studies at the SPS
M. Migliorati, C. Vaccarezza INFN - LNF
LEIR IMPEDANCE AND INSTABILITY MEASUREMENTS
ELENA Overview and Layout Start of ELENA Commissioning Next Steps
Summary of experience with IPM measurements at BNL-RHIC
Longitudinal beam parameters and stability
Saturday 21st April 00:33 Interlock during ramp on BLM HV
Coupling Correction at the Australian Synchrotron
Acknowledgments: LIU-PT members and deputies, H. Bartosik
LHC Emittance Measurements and Preservation
Instrumentation for Colliding Beam Physics 2017
Machine Operation and Progresses in SSRF
Proton Beam Diagnostics
J. Uythoven, W. Venturini Delsolaro, CERN, Geneva
LHC (SSC) Byung Yunn CASA.
Transverse emittance measurements
Linac Diagnostics Commissioning Experience
Measurement of the beam (transverse) emittances
Presentation transcript:

Fermilab, April 8 th, 2003F.Roncarolo 1 CERN SPS Emittance Measurements F. Roncarolo, CERN AB/BDI University of Lausanne Acknowledgments: B.Dehning, R.Jung, J.Koopman, G.Ferioli, C.Fischer J.J.Gras, A.Guerrero G.ArduiniF.Caspers

Fermilab, April 8 th, 2003F.Roncarolo 2 Contents The proton acceleration from the LINAC to the LHC Introduction to emittance measurements  The quantities to be measured  Some of the SPS-LHC beam design parameters Overview of the CERN SPS emittance monitors  Flying Wires  Ionization Profile Monitor  Luminescence Monitor  Synchrotron Light Monitor Data Analysis and Results  The off-line analysis with ROOT  The fitting strategies  Some results Conclusions

Fermilab, April 8 th, 2003F.Roncarolo 3 Proton Acceleration Chain CNGS

Fermilab, April 8 th, 2003F.Roncarolo 4 SPS-LHC Design Parameters Particle collision: 7TeV 12 SPS Pulses with the scheme:  ( )  39 PS Pulses = 2808 bunches Proton Momentum 26  450 GeV/c Protons/Bunch 1.1*10 11 Bunches/Batch72 N Batches 3 or 4 Bunch Length Bunch Spacing 4  1.5 ns 4  ) 25 ns H (V) Emittance From PS (26 GeV) H (V) Emittance To LHC (450 GeV) 3  m 3.5  m LHC Beam in the SPS Some LHC numbers

Fermilab, April 8 th, 2003F.Roncarolo 5 Transverse Emittance The transverse emittance is measured in the SPS during machine development periods dedicated to the LHC beam Profile Monitors The normalized emittance is specified in [  m] Betatron Function: we performed measurements in 2002, exciting 6 Quad  K)  measuring the tune (  Q  and getting the Beta according to (the data analysis has to be completed) (the data analysis has to be completed) Dispersion Function: is computed from lattice design (MAD) Momentum Spread: is derived from RF voltages and when possible is also derived from the profile monitors

Fermilab, April 8 th, 2003F.Roncarolo 6 Monitors Overview Gas Monitors: IPM in the V Plane + Luminescence in the H Plane Luminescence in the H & V Planes Synchrotron Light Monitor IPM in the H Plane

Fermilab, April 8 th, 2003F.Roncarolo 7 SPS Flying Wires Location Each tank is equipped with H&V FW BWS414 D x = 2.95 m BWS416 D x =-0.14 m BWS519 D x = 0.02 m Rotational BWS421 D x = 2.58 m BWS517 D x =-0.32 m BWS521 D x = 1.93 m Linear

Fermilab, April 8 th, 2003F.Roncarolo 8 Flying Wire Pictures Rotational Tank Rotational Fork Linear Motor Linear Wire

Fermilab, April 8 th, 2003F.Roncarolo 9 Ionization Profile Monitor in LSS4 Installed in 1997 (from Desy) Modified in 2000 (electron collection) Characteristics It provides horizontal profiles The phosphor decay time is 300 ns It collects electrons, by means of two high voltage plates and a dipole magnetic field ranging from to T (B maz = 0.06 T) ranging from to T (B maz = 0.06 T) During operation the image is acquired with a CCD camera Performances The maximum refresh rate is 1 profile each 40ms (the limit is imposed by the camera which is always recording images in the two planes and taking 20ms for each image) (the limit is imposed by the camera which is always recording images in the two planes and taking 20ms for each image) The acquisition window size is adjustable, the maximum number of profiles per acquisition depends on the window dimensions There is also a second acquisition mode tested:  A multi anode PMT with 32 channels equipped with a 40MHz electronics  It was used to do turn-to-turn measurements with acceptable results despite the short integration time (1 turn=23us to be compared to the 20ms integration time of the camera)

Fermilab, April 8 th, 2003F.Roncarolo 10 Ionization Profile Monitor in LSS5 A second IPM monitor has been installed in 2002 LAYOUT LAYOUT Characteristics It provides vertical profiles The phosphor decay time is < 1 ns It is also equipped with a dipole magnet, 4 times stronger than the one of the IPM in LSS4) The design includes 2 MCP plates 2002 Operation Only one MCP was available (the second was not provided by firm) Frequent HV perturbations appeared with the LHC beam  HV trips The gain was unstable (electron cloud?) Several tests have been performed, few profiles were recorded 2003 Planning The installation of the second MCP will enhance the signal amplification The HV electrodes have been NEG coated in order to reduce SEY

Fermilab, April 8 th, 2003F.Roncarolo 11 Luminescence Monitor It works with N 2 injection 1 light channel is going to a PM for gas- luminescence studies (decay time etc.) 2 channels are used for profile measurements:  The H channel is in air: it showed high background with LHC beam, due to beam losses  The V channel is in vacuum The MCP has a pre-programmed variable gain over cycle (it showed some problems to log on timing events) (it showed some problems to log on timing events)

Fermilab, April 8 th, 2003F.Roncarolo 12 Data Analysis ROOT Graphical User Interface dedicated to the off-line profiles data analysis  Input profile or list of profiles  Fit with different strategies  Compare results of different fits  Compare beam size and emittance from different instruments- different measurements

Fermilab, April 8 th, 2003F.Roncarolo 13 The Fitting Strategies Sigma=1.750 mm -- Sigma=1.852 mm --

Fermilab, April 8 th, 2003F.Roncarolo 14 Assignment of Error Bars (I) The assignment of the uncertainty of each profile point is implemented in the ROOT based Graphical User Interface The error bars are computed from the spread of N consecutive point (default N = 4) The estimation is good outside the tails and on the peak (each of the 4 points is supposed to measure the same quantity) The uncertainty results over-estimated in the regions with slope

Fermilab, April 8 th, 2003F.Roncarolo 15 Assignment of Error Bars (II) Err=Spread over 4 points Zoom on the beam-core region Zoom on the beam-tail region

Fermilab, April 8 th, 2003F.Roncarolo 16 Assignment of Error Bars (III) Error distribution as function of position Green Line: residuals to fit Zoom on the beam-tail region Residuals, Errors [bit] Pos [mm] Residuals, Errors [bit]

Fermilab, April 8 th, 2003F.Roncarolo 17 Example of PS-SPS comparison PS-SPS Studies done on PS-SPS Studies done on The beam has been injected The beam has been injected with 3 different proton intensities with 3 different proton intensities For each beam intensity the dots are the average over all the scans and the error bars average over all the scans and the error bars their spread their spread It is not clear yet whether the differences come from: come from:  instrument systematic  beam mismatching The Vertical Emittance at low intensity The Vertical Emittance at low intensity is likely wrong is likely wrong The SPS measurements were performed The SPS measurements were performed using 5 different FW using 5 different FW

Fermilab, April 8 th, 2003F.Roncarolo 18 IPM Results (I) These are two set of measurements measurements with an LHC Beam of with an LHC Beam of 3 Batches  3 Batches  72 bunches/batch  1.1*10 11 p/bunch Different MCP gains give different results give different results IPM is likely 12 s IPM is likely 12 s where the energy ramp where the energy ramp has just begun has just begun WS Results Example: Emitt vs Time, Different MCP gains

Fermilab, April 8 th, 2003F.Roncarolo 19 IPM Results (II) Low MCP gain High MCP gain Errors = spread of 4 consecutive points (is important for the   computation) Amplitude [bit] Pos [mm] Chi Square Cycle Time [s] When Applying an high MCP gain there are indications of saturation When Applying an high MCP gain there are indications of saturation

Fermilab, April 8 th, 2003F.Roncarolo 20 1 Time = 0 [s] 2 Time = 1.4 [s] 3 Time = 3 [s] 4 Time = 5 [s] Profiles from the Luminescence Monitor

Fermilab, April 8 th, 2003F.Roncarolo 21 Parameters From Luminescence Beam Size These measurements were done on the SPS fix target beam The integral signal indicates the efficiency of the MCP pre-programmed gain Time [ms] Profile Integral Sigma [mm] Integral [mm*Bit] 25e3 225e3

Fermilab, April 8 th, 2003F.Roncarolo 22 Wire Breaking (I) All rotational WS wires broke during two periods of measurements (Sept 26th, Oct 20th) The LHC beam had the following characteristics: The injection of 2 Batches at full intensity was enough to break the wires in the parking position The bunch length was pushed to the nominal value for the first time The bunch length and the spacing give the characteristic beam spectrum From 1 to 4 Batches From 12 to 72 Bunches/Batch From 3·10 10 to 1.1 · p/bunch 1.5 From 4 to 1.5 ns (4 sigmas) bunch length ns bunch spacing

Fermilab, April 8 th, 2003F.Roncarolo 23 Wire breaking (II) Voltage ~ Heating Thermiomic Em.Current 1 nd Batch Injection 2 rd Batch Injection Beam Energy Ramp These measurements are done on a rotational wire in the parking These measurements are done on a rotational wire in the parking position position

Fermilab, April 8 th, 2003F.Roncarolo 24 RF Coupling Studies Ferrite: Lower Q – Lower RF power Absorption Plot from laboratory measurements dedicated to simulate the RF mode coupling between the beam and the wire Plot from laboratory measurements dedicated to simulate the RF mode coupling between the beam and the wire The insertion of ferrite tiles insures mode dumping The insertion of ferrite tiles insures mode dumping F [MHz]

Fermilab, April 8 th, 2003F.Roncarolo 25 Wire Material Studies Carbon SiC, Quartz Classical cavity modes technique Classical cavity modes technique TE01N rectangular resonator TE01N rectangular resonator (from F.Caspers) (from F.Caspers) Wire of different materials inserted Wire of different materials inserted Carbon Silicon Carbide (SiC) Quartz C has been used in SPS WS C has been used in SPS WS until now SiC and Quartz fibers used in LEP SiC and Quartz fibers used in LEP SiC used as RF absorber SiC used as RF absorber (i.e. CLIC, fiber composition different (i.e. CLIC, fiber composition different from LEP one) from LEP one) Results: C proves to be an excellent absorber SiC & Quartz not SiC & Quartz drawbacks: High resistivity Possible problems due to static charges Wire integrity check & S.E. detection not available

Fermilab, April 8 th, 2003F.Roncarolo 26 Conclusions and Planning (IPM) The 2002 SPS confirmed that the IPM monitors are suitable for continuous emittance measurements in almost all the LHC beam conditions They need a more systematic calibration and the problems with unstable gain have to be understood A second MCP will be installed in the new IPM, providing an enhanced signal enhanced signal The automatic setting of the instrument gain, over the energy ramp, will control saturation problems One IPM has been also coated in order to reduce the secondary emission yield of the electrodes material and thus face the possible formation of the e-cloud In this monitor we will also try gas injection to further improve the signal and go for bunch-to-bunch measurements

Fermilab, April 8 th, 2003F.Roncarolo 27 Conclusions and Planning (FW) The Flying Wires proved to be the only available instrument for an absolute calibration of the whole emittance monitoring system They are constantly used by beam instrumentation experts and by the machine operators during the LHC beam setup and tuning in the SPS All the rotational wires broke in the second part of the 2002 run The 2003 hardware modifications  Ferrite tiles to dump the RF modes  Installation of SiC wires on test instruments should protect the wires from the RF heating should protect the wires from the RF heating

Fermilab, April 8 th, 2003F.Roncarolo 28 Conclusions and Planning (Data Analysis) The presented off-line analysis is investigating the beam-related and the instrument-related emittances uncertainty Preliminary results demand attention on the fitting strategies and error assignment A detailed error propagation analysis for each monitor type could help in understanding and correcting systematic errors The 2003 SPS run will be dedicated to repeated measurements under different beam conditions The aim is to organize the measurements in order to synchronize the emittance monitoring with all the available instruments, including the Luminescence and Synchrotron Light monitors

Fermilab, April 8 th, 2003F.Roncarolo 29 References J.Bosser et al. ”The micron wire scanner at the SPS”, CERN-SPS ABM (1987) C.Fischer and J.Koopman,”Measurements made in the SPS with a rest gas profile monitor by collecting electrons”, CERN-SL BI (2000) G.Burtin et al. “The luminescence profile monitor of the CERN SPS”, CERN-SL BI (2000) F.Roncarolo et al. “Cavity mode related wire breaking of the SPS wire scanners and loss measurements of wire materials”, Proceedings of PAC2003 Measurement of the Beam Transverse Distribution in the LHC LHC Ring LHC beam

Fermilab, April 8 th, 2003F.Roncarolo 30 Rotational FW Tank

Fermilab, April 8 th, 2003F.Roncarolo 31 Rotational FW Fork (1)

Fermilab, April 8 th, 2003F.Roncarolo 32 Rotational FW Fork (2)

Fermilab, April 8 th, 2003F.Roncarolo 33 Linear FW Motor

Fermilab, April 8 th, 2003F.Roncarolo 34 Linear FW Wire

Fermilab, April 8 th, 2003F.Roncarolo 35 IPM Installed in SPS LSS4

Fermilab, April 8 th, 2003F.Roncarolo 36 IPM installed in LSS5

Fermilab, April 8 th, 2003F.Roncarolo 37 IPM Layout The whole tank is in between the dipole magnet poles Two light channels  IPM  Luminescense (not drawn) IPM light is split to  CCD Camera  Photo Tube

Fermilab, April 8 th, 2003F.Roncarolo 38 IPM inside