ODOT Programmatic ESA Consultation on the Federal-Aid Highway Program (FAHP) User’s Guide Training, June-July 2013 Oregon’s Federal Highway Aid Programmatic.

Slides:



Advertisements
Similar presentations
Stormwater Management Initiative Update. ODOTs Goal Develop a streamlined stormwater runoff treatment program to: Develop a streamlined stormwater runoff.
Advertisements

Managing Environmental Compliance for ODOT’s OTIA III State Bridge Delivery Program: Many Regulations – One Framework Michelle Eraut Environmental Program.
Overview What is the National ITS Architecture? User Services
Section 4(f) Section 6(f). Section 4(f) Process Overview 2 Project Initiation Package Field Review 4(f) Property Present Use Coordination NEPA Document.
Environmental Scoping Guidance Jerry Vogt Region Environmental Coordinator ODOT – Region 3.
Ecological Survey Reports The level of ESR Report is determined by the type of project and its probable level of impacts.
Dam Removal in Rhode Island: Present and Future David Chopy, DEM July 16, 2009.
Jennifer Horn, Preservation Pennsylvania. Who is Preservation Pennsylvania? Pennsylvania’s only private, non-profit, statewide organization dedicated.
ODOT – FHWA Environmental Performance Measures February 2012.
ODOT STIP Process and Funding Jerri Bohard –Planning Section Manager –Transportation Development Division Jeff Scheick –Northwest Region Manager –Highway.
Capilano Road Improvement Project WELCOME TO THE OPEN HOUSE.
ODOT Programmatic ESA Consultation on the Federal-Aid Highway Program (FAHP) User’s Guide Training, June-July 2013 Oregon’s Federal Aid Highway Programmatic.
Keeping Maine’s Forests Pilot Project Update Fisheries Habitat Restoration Pleasant River Watershed.
1 C E T A S Range of Alternatives Presentation Date Project Name Project location (city, county) ODOT Key Number:
Newport South Beach Peninsula Refinement Plan. Newport South Beach Peninsula Located on the south side of the mouth of the Yaquina Bay and the crossing.
Use of the Endangered Species Act in Alaska Doug Vincent-Lang, Special Assistant Alaska Department of Fish & Game 1.
ODOT Programmatic ESA Consultation on the Federal-Aid Highway Program (FAHP) User’s Guide Training, June-July 2013 Contract Specifications Background on.
Wetlands and Waterways Permits Patti Caswell Statewide Wetlands/Permits Program Coordinator Geo-Environmental, ODOT.
Oregon Jobs and Transportation Act Section 18 CETAS Director’s Meeting Action Items.
Jan 22-24, 2007 Transportation Research Board U.S. Army Corps of Engineers Wilmington District North Carolina’s Interagency Agreements to Streamline Project.
BIOLOGICAL RESOURCES Ken Cannon ODOT Aquatic Biology and Fish Passage Program Coordinator.
HABITAT CONSERVATION PLANNING Charles J. Randel, 1 III, Howard O. Clark, Jr., 2 Darren P. Newman, 2 and Thomas P. Dixon 3 1 Randel Wildlife Consulting,
West Texas Legislative Summit ENVIRONMENTAL ISSUES Environmental Regulations Affecting Transportation Carlos Swonke Director, Environmental Affairs Division.
2012 FTIP/FSTIP Workshop Project Selection Process.
BUILDING STRONG ® 1 Regional General Permit (RGP) 31 Interagency Meeting June 11, 2015.
U.S Department of Transportation Federal Highway Administration Federal Transit Administration MAP-21 Moving Ahead with Progress in the 21 st Century Linking.
ODOT Programmatic ESA Consultation on the Federal-Aid Highway Program (FAHP) User’s Guide Training, June-July 2013 When a new project begins early coordination,
EDMS structure ODOT GIS Steering Committee EDMS Steering Committee EDMS RES/RAZ mapping Workgroup EDMS Data & Tools Workgroups EDMS proposes projects to.
Federal Highway Administration Emergency Relief (ER) Program Brian Hogge Field Operations Team Leader July 2013.
Dispersant Workgroup Update Jan 28 th, 2015 Marcia Combes EPA CDR Bo Stocklin, USCG.
Biological Opinions & Endangered Species Act Consultation – A “How To” Guide for Working with Agencies on ESA Issues MATTHEW A. LOVE Partner- Seattle,
Practical Design in ODOT Roadway Conference April 13, 2010 Cathy Nelson, PE Technical Services Manager/ Chief Engineer.
ODOT Programmatic ESA Consultation on the Federal-Aid Highway Program (FAHP) User’s Guide Training, June-July 2013 Bank Stabilization Streambank or channel.
ODOT Programmatic ESA Consultation on the Federal-Aid Highway Program (FAHP) User’s Guide Training, June-July 2013 Welcome to Oregon’s Programmatic ESA.
Stormwater Management Initiative Update. ODOT’s Goal Develop a streamlined stormwater runoff treatment program to: Develop a streamlined stormwater runoff.
Completing the NEPA Process for CatEx Projects: Part 3 to CE Closeout.
Stormwater Management Initiative Update. ODOT’s Goal Develop a streamlined stormwater runoff treatment program to: Develop a streamlined stormwater runoff.
SAFETEA-LU Changes  Exemption of the Interstate System from Section 4(f) [Section 6007]  de minimis impacts to historic sites [Section 6009(a)]  de.
Reclamation Bureau Interagency Forum Local Agency Planning Process City of Rancho Cordova December 6, 2007.
Blue Book Roll Out Revised Expectations Expectations: NOAA Fisheries “ODOT has spent significant effort updating the Guide and making modifications.
OREGON ECONOMIC & BRIDGE OPTIONS STUDY The problem is not just the bridges, or the freight system, It is about Oregon’s economy and quality of life. FHWA.
ODOT Programmatic ESA Consultation on the Federal-Aid Highway Program (FAHP) User’s Guide Training, June-July 2013 Roles & Responsibilities Project Biologist.
INTRODUCTION TO SECTION 4(f) Presented by Ian Chidister Environmental Program Manager FHWA – Wisconsin Division December 4, 2013.
At the last Steering Team meeting… Goals (Rule-level) EPS (Measurable and Reportable) Natural Resources Human/Cultural Environment Administrative Avoid,
Local Government Section Welcome Marty Andersen ODOT Local Government Section 355 Capitol Street NE, Rm. 326 Salem, Oregon Ph:
ODOT Programmatic ESA Consultation on the Federal-Aid Highway Program (FAHP) User’s Guide Training, June-July 2013 Welcome to Oregon’s Programmatic ESA.
Endangered Species Act Counterpart Regulations for National Fire Plan Projects Bureau of Land Management Forest Service June 9, 2004.
1 C E T A S Purpose and Need Presentation Date Project Name Project location (city, county) ODOT Key Number:
1 C E T A S Triage Presentation, Date Project Name Project location (city, county) ODOT Key Number:
Marin Coastal Watersheds Permit Coordination Program Marin Resource Conservation District U.S.D.A. Natural Resources Conservation Service Sustainable Conservation.
WRITING A BETTER PURPOSE AND NEED A COMMON SENSE APPROACH Kevin E. Davis Environmental Supervisor ODOT-OES.
U.S. Army Corps of Engineers Decision Authority l All permit decisions, scope of analysis, 404(b)(1), mitigation, alternatives, jurisdiction -- Corps.
Innovative Approaches to Wildlife/Highway Interactions Funding Opportunities.
ODOT Programmatic ESA Consultation on the Federal-Aid Highway Program (FAHP) User’s Guide Training, June-July 2013 Fish Habitat Restoration.
Wetlands and Waterways Permits Ken Franklin Statewide Permits Program Coordinator Geo-Environmental, ODOT.
Regulatory Permits for Farm Bill Projects Jackie Charbonneau, Ecologist Natural Resources Conservation Service September 20, 2012.
ODOT STIP Process and Funding Jerri Bohard –Planning Section Manager –Transportation Development Division Steve Leep –Program and Funding Services Manager.
Locally Administered Federal-Aid Project Initiation Workshop Prospectus Part 3 and NEPA Requirements Presenter: Howard Postovit; ODOT Region 5 Region Environmental.
Oregon Department of Transportation Stormwater Management Initiative: Meeting New Challenges Presented by: William Fletcher, ODOT February 5, 2008.
ODOT Programmatic ESA Consultation on the Federal-Aid Highway Program (FAHP) User’s Guide Training, June-July 2013 Pile Driving/Pile Removal.
ODOT Programmatic ESA Consultation on the Federal-Aid Highway Program (FAHP) User’s Guide Training, June-July 2013 Early Coordination This required step.
Oregon Department of Transportation Stormwater Management Initiative: Meeting New Challenges Presented by: William Fletcher and Jennifer Sellers January.
Dispersant Workgroup Update May 20th th, 2015 CDR Bo Stocklin, USCG.
ODOT Programmatic ESA Consultation on the Federal-Aid Highway Program (FAHP) User’s Guide Training, June-July 2013 Clearing and Site Preparation and Site.
Environmental Site Assessments Hazardous Materials/ Regulated Substances Categorical Exclusion Training Class.
Environmental Issues Update - Endangered Species 1.
PAC Meeting July 2, Agenda  Introductions and thanks  Project to date  Next steps  Questions.
ODOT Programmatic ESA Consultation on the Federal-Aid Highway Program (FAHP) User’s Guide Training, June-July 2013 Early Coordination This required step.
Environmental Compliance & Bridge Maintenance
2015 FAHP Annual Meeting For Oregon’s Programmatic Endangered Species Act Consultation on the Federal-Aid Highway Program March 15, 2016.
Presentation transcript:

ODOT Programmatic ESA Consultation on the Federal-Aid Highway Program (FAHP) User’s Guide Training, June-July 2013 Oregon’s Federal Highway Aid Programmatic Biological Opinion Presentation to SCOE Natural Resources Subcommittee June 19, 2013

ODOT Programmatic ESA Consultation on the Federal-Aid Highway Program (FAHP) User’s Guide Training, June-July 2013 Background & Purpose Emphasis on Programmatic Agreements Previous Programmatic outdated FHWA as the lead Federal Nexus Increasing role of ODOT in Local Agency projects

ODOT Programmatic ESA Consultation on the Federal-Aid Highway Program (FAHP) User’s Guide Training, June-July 2013 Programmatic Goals Overall Goals 1.Improve the condition of the environmental baseline most directly impacted by the transportation program (e.g., habitat connectivity, water quality) 2.Avoid and minimize adverse impacts to federally-listed species and critical habitat 3.Decrease consultation time and associated costs

ODOT Programmatic ESA Consultation on the Federal-Aid Highway Program (FAHP) User’s Guide Training, June-July 2013 Communication Better tracking of project impacts (good and bad)…fewer actions need regulatory approval in future –Necessary for ODOT and Local Agency Greater transparency & communication

ODOT Programmatic ESA Consultation on the Federal-Aid Highway Program (FAHP) User’s Guide Training, June-July 2013 Quick Facts Initial coordination started in 2010 Averaged 1 FTE with duties shared among a small team 13 months to complete formal consultation Anticipate coverage for up to 70 projects a year Reduces project approval time down to as little as a few days with most being approved in under a month

ODOT Programmatic ESA Consultation on the Federal-Aid Highway Program (FAHP) User’s Guide Training, June-July 2013

ODOT Programmatic ESA Consultation on the Federal-Aid Highway Program (FAHP) User’s Guide Training, June-July 2013 Project Type Bike/Pedestrian Facilities Bridge Repair Bridge Replacement Culvert Extension/Repair Culvert Replacement Fish Habitat Restoration Intersection Safety Modernization/New Alignment/Bypass Pavement/Facility Preservation Roadside Development Rockfall/Slide Mitigation Signals/Signs Widening/Adding Lanes Qualifying Actions

ODOT Programmatic ESA Consultation on the Federal-Aid Highway Program (FAHP) User’s Guide Training, June-July 2013 Exclusions Tidegates EIS Solely related to mass transit or rail New permanent stream crossings or roads in the riparian zone ( With some exceptions ) In-water work downstream of Willamette Falls Dec. 1 - Jan. 31 Stream channel realignment ( except to restore former channels or eroding banks) Excluded activities may require Individual Consultation

ODOT Programmatic ESA Consultation on the Federal-Aid Highway Program (FAHP) User’s Guide Training, June-July 2013 Exclusions (cont.) New lanes/intersections that contribute to other land use changes that trigger effects Earthwork Superfund Sites and other hazardous material sites Direct or indirect take of Steller sea lion, killer whale Effects to USFWS species (for now) Large projects with greater than “programmatic-scale effects”

ODOT Programmatic ESA Consultation on the Federal-Aid Highway Program (FAHP) User’s Guide Training, June-July 2013 Modifications Expedite Project Notification by designing & building according to Design Standards NMFS recognizes one-size-does-not-fit-all Substantive modifications –Early Coordination; likely will trigger Services approval of Notification

ODOT Programmatic ESA Consultation on the Federal-Aid Highway Program (FAHP) User’s Guide Training, June-July 2013 Submittal Process ODOT Region submits notification form to FHWA for approval via FHWA Review & Approval –NMFS Approval not required, NMFS is sent copy but no further action required –NMFS Approval required, NMFS is sent copy for review and approval

ODOT Programmatic ESA Consultation on the Federal-Aid Highway Program (FAHP) User’s Guide Training, June-July 2013 NMFS Take Allotment Fish Salvage Numbers are quite low. – listed fish salvaged, 8 known mortalities – listed fish salvaged, 9 known mortalities

ODOT Programmatic ESA Consultation on the Federal-Aid Highway Program (FAHP) User’s Guide Training, June-July 2013 Communication with FHWA & NMFS Quarterly meetings to discuss issues Annual summary report Webmap interface for on demand reporting –Allows geo-spatial view of project locations and status –Quick access to detailed project information –Constantly updated and always available

ODOT Programmatic ESA Consultation on the Federal-Aid Highway Program (FAHP) User’s Guide Training, June-July 2013

ODOT Programmatic ESA Consultation on the Federal-Aid Highway Program (FAHP) User’s Guide Training, June-July 2013

ODOT Programmatic ESA Consultation on the Federal-Aid Highway Program (FAHP) User’s Guide Training, June-July 2013

ODOT Programmatic ESA Consultation on the Federal-Aid Highway Program (FAHP) User’s Guide Training, June-July 2013

ODOT Programmatic ESA Consultation on the Federal-Aid Highway Program (FAHP) User’s Guide Training, June-July 2013

ODOT Programmatic ESA Consultation on the Federal-Aid Highway Program (FAHP) User’s Guide Training, June-July 2013 Key Factors for Success Shared vision of improving the environment Experience with many ESA programmatic approaches Both agencies recognized resources could be used more wisely Long-standing relationship with regulatory partners Built in accountability to demonstrate trust

ODOT Programmatic ESA Consultation on the Federal-Aid Highway Program (FAHP) User’s Guide Training, June-July 2013 Current Status Initial statewide training complete Full in-depth training currently taking place Developing & refining reporting tools Close to receiving USFWS BO Nearly 30 projects rolling –Over half requiring NMFS approval –Receiving approvals in less than a week but no more than 1 month

ODOT Programmatic ESA Consultation on the Federal-Aid Highway Program (FAHP) User’s Guide Training, June-July 2013 Questions? VIRONMENTAL/Pages/fahp.aspx