MSC recent activities Commissioning Cascina 2 Apr 2007.

Slides:



Advertisements
Similar presentations
1 GWADW Elba The commissioning of the Virgo interferometer H. Heitmann Observatoire de la Côte dAzur, Nice for the VIRGO collaboration Evolution.
Advertisements

MSC recent activities virgoweek Cascina 4 Dec 2006.
Status of the Virgo Commissioning G.Losurdo – INFN Firenze/Urbino for the Virgo Collaboration.
September 21, 2005Virgo Status – ESF Workshop1 Status of Virgo B. Mours.
One Arm Cavity M0 L1 L2 TM M0 L1 L2 TRIPLE QUAD 16m R = 20m, T=1% R = ∞, T=1%  Optimally coupled cavity (no mode matched light reflected back)  Finesse.
Takanori Sekiguchi Italy-Japan Workshop (19 April, 2013) Inverted Pendulum Control for KAGRA Seismic Attenuation System 1 D2, Institute for Cosmic Ray.
Locking improvements after the end of VSR1 Gabriele Vajente for the Locking Group 14 th ILIAS WG1 meeting Cascina – March 6 th 2008.
Payload design methods versus modeling E. Majorana.
1 ILIAS WG1 meeting, Hannover, Alignment electronics noise budget ● Sources of electronic noise ● C7 electronic noise ● Electronic noise for.
1 Virgo commissioning status M.Barsuglia LAL Orsay.
Virgo commissioning update - VSR1 first month summary E. Tournefier WG1 meeting, Cascina June 20 th,2007.
Suspended Mirror control: Learning through Virgo Experience E. Majorana - I.N.F.N. Pisa Aspen GWAD February 16, 2004.
1 Virgo Commissioning progress and plans ILIAS, Jan 23 rd 2007 Matteo Barsuglia on behalf of the Commissioning Team.
rd ILIAS-GW annual general meeting 1 VIRGO Commissioning progress J. Marque (EGO)
SIESTA for Virgo locking experience L. Barsotti University of Pisa – INFN Pisa on behalf of the Virgo Locking Group Cascina, March 16th 2004 Simulation.
COMMISSIONING PROGRESS G.LOSURDO – INFN Firenze for the Virgo Collaboration.
Present Superatttenuator performance vs. AdV & ET Requirements S.Braccini for Virgo Suspension group.
1 Virgo commissioning since the end of VSR1 E. Tournefier for the commissioning team ILIAS WG1, Cascina March 5 th,2008.
Virgo Control Noise Reduction
1 Ist Virgo+ review Cascina H. Heitmann Alignment: Virgo+ changes.
Thoughts on short term improvements for Mirror Suspension Control G.Losurdo - P.Ruggi.
March 17, 2008LSC-Virgo meeting1/12 Virgo Status B. Mours.
EM-MSC MSC Columbus’ eggs VW EM-MSC outline EQG  SFR Note Actuation Noise: still under study, a framework of actions is being.
Virgo Commissioning update Gabriele Vajente for the Virgo Collaboration LSC/VIRGO Meeting – MIT 2007, July LIGO-G Z.
ILIAS – WG1 Hierarchical suspension control G.Losurdo INFN Firenze.
Experimental tests of SA simulation Irene Fiori – Simulation Workshop – March 18, 2004 Virgo dataSiesta simulation 1. Inertial Damping simulation  test.
Takanori Sekiguchi External Review Control and tuning of suspension 1 T. Sekiguchi KAGRA 4th External Review.
1 Virgo commissioning: Next steps December 12 st 2005 Hannover, ILIAS-GWA WG1 Matteo Barsuglia, LAL/CNRS.
1 Virgo Commissioning progress ILIAS, Nov 13 th 2006 Matteo Barsuglia on behalf of the Commissioning Team.
EM-MSC MSC staus & plans Commissioning meeting
1 The Virgo noise budget Romain Gouaty For the Virgo collaboration GWADW 2006, Isola d’Elba.
MSC - 18 Oct 071 LOW FREQUENCY SEISMIC NOISE: LOCKING AND SENSITIVITY ISSUE Paolo Ruggi noise meeting.
ILIAS Geneva 29 March 2007 Virgo suspension control progress E. Majorana INFN Mirror Suspension Control workgroup.
Status of VIRGO Lisa Barsotti - University and INFN Pisa – on behalf of the VIRGO collaboration ANNECY - December 15 th, 2004  Status of the Commissioning.
Nov 3, 2008 Detection System for AdV 1/8 Detection (DET) Subsystem for AdV  Main tasks and requirements for the subsystem  DC readout  Design for: the.
LIGO-G Z The Status of VIRGO E. Tournefier for the Virgo Collaboration GWADW 2004, Aspen From the CITF to VIRGO Commissioning of the Fabry-Perot.
1 PAY Review Meeting 1 18/3/2009 Piero Rapagnani 18/03/2009.
M. Mantovani, ILIAS Meeting 7 April 2005 Hannover Linear Alignment System for the VIRGO Interferometer M. Mantovani, A. Freise, J. Marque, G. Vajente.
MSC latest weeks activities V. Dattilo, A. Gennai, D. Huet, E. Majorana, F. Paoletti, D. Passuello, P. Ruggi.
1 Virgo Commissioning Status WG1 meeting Potsdam, 21 st July 2006.
Mirror Suspension Control commissioning learning
1 Commissioning meeting, Cascina, LA electronics noise budget ● Sources of electronic noise ● C7 electronic noise ● Electronic noise for optimized.
The VIRGO Suspensions Control System Alberto Gennai The VIRGO Collaboration.
MSC winter, short-term schedule Commissioning meeting Cascina 2 Oct 2006.
The control of the Virgo Superattenuator: present and future Giovanni Losurdo - INFN Firenze/Urbino on behalf of the Virgo Collaboration.
Paolo La Penna ILIAS N5-WP1 meeting Commissioning Progress Hannover, July 2004 VIRGO commissioning progress report.
M. Mantovani ILIAS Cascina March 2008 Automatic Alignment system Improvements after the VSR1 M. Mantovani for the Alignment team.
Gabriele Vajente ILIAS WG1 meeting - Frascati Noise Analysis Tools at Virgo.
Status of Virgo GWDAW12 Status of Virgo GWDAW Dec Leone B. Bosi INFN and University of Perugia (Italy) On behalf of the Virgo Collaboration.
1 Locking in Virgo Matteo Barsuglia ILIAS, Cascina, July 7 th 2004.
Status of Virgo a short update Michele Punturo. A bit of History July 29 – August –C6 run Duty cycle: Locking 89%, Science Mode 86% September.
MSC recent activities COMM Cascina 5 Feb EM-MSC Commissioning-oriented running activity Operation and interface updates Hardware checkup.
Caltech, February 12th1 Virgo central interferometer: commissioning and engineering runs Matteo Barsuglia Laboratoire de l’Accelerateur Lineaire, Orsay.
1 Frequency Noise in Virgo by Matt Evans. 2 The Actors  Noise Sources  Input Mode Cleaner length noise  Sensing noise on IMC lock  Frequency Servo.
SAT Plans for System R&D Signal Recycling Construction and A&I Short Suspension Upgrade Roberto Passaquieti Università di Pisa and INFN-Pisa AdV Review.
MSC, focus on: WI ghost noise. 1 “Recent” history and effect July 11 July 22 Aug 1 Jul 28 Aug 1 The disturbance, with us since Dec , had disappeared.
1 ILIAS WG1 meeting, Hannover The 2 nd modulation frequency project.
1 Detector Monitoring requirements ( V.Dattilo for the EGO Operations Group ) ( with the collaboration of S.Braccini)  Short history  Current status.
Filter #7 control April 18, 2016 –, Cascina Paolo Ruggi.
20/09/2006 EM MSC September /09/2006 EM MSC “activities” (from the web page, by Giovanni) are: - Inertial damping - Local control - Tide control.
Type-A SAS Local Control Simulation (Current Status)
Status of Virgo GWDAW Dec 13-16
Alignment status & plans
Advanced VIRGO Experiment
Superattenuator for LF and HF interferometers
MSC report September weekly meeting EM-MSC
Weekly meeting Cascina 9 Jan 2007
Status at the Prague meeting
5/10/2019 MSC briefing Cascina 11-Dec 2006 wwwwwww.
weekly meeting Cascina 28 Nov 2006
Presentation transcript:

MSC recent activities Commissioning Cascina 2 Apr 2007

EM-MSC Recent/present Quite state recovery (duty cycle) Disturbance Re-jection (duty cycle, sensitivity) > xDamp, cleaner coarse signals to improve control accuracy: meas and offline OK, to be fully implemented (1 standalone shift) > saturation at the WE site (gain tuning): OK > Tall towers, GIPC (global IP control): tested under various conditions, in line. Ready further improvement for anti-  seism sensor blending for NI,WI. > Short tower optimization: off-line work to prepare the optimization works OK, some tests done, to be completed (2 shifts, standalone+ITF check) Noise budget (sensitivity) ===>>> Hierarchical control: 1 st step: improvement of NE,WE actual Ma/Mi blending 2 nd step: BS marionette reallocation (today/tomorrow).

EM-MSC GIPC (Global Inverted Pendulum Control) benefits: wind disturbance rejection, lock acquisition, duty-cycle. Once the ITF is locked, the mirror position, provided by the Global Control, can be used instead of LVDTs, referred to the ground. Features: - automatic engagement (soft!) - anti-wind blending in NE-WE-BS-PR - anti-  seism in NI-WI GC (reconstructed z) LVDT Splitted anti-  seism /anti-  seism

EM-MSC Example1: NE_GIPC,WE_GIPC only NE “follows” NIWE “follows” WI step9

EM-MSC Example 2: NE_ GIPC, WE_ GIPC only step9

EM-MSC Example 3: NE_ GIPC, WE_ GIPC, BS_ GIPC, PR_ GIPC step9

EM-MSC Example3: NE_GIPC,WE_GIPC only Thanks to GIPC benefit to Automatic Alignment step9 Short suspension (i.e.beam) improvement necessary ?

EM-MSC Example,environmental: central Bld, GIPC shock absorption

EM-MSC > synthesis: net improvement of recent activity Much more  seism and similar peak at 130 mHz In this example: - red data (now) show up similar peak at 130 mHz but much larger  seism. In spite of this: => the force reallocated to the marionette is smaller !

EM-MSC > noise budget: actuation noise & reallocation -Suitable resistors are used to reduce coil-drivers noise (ln/HP to accomplish sensitivity/locking) -a trade-off with DAC noise using emphasis/de-emphasis was found. Still some work:  BS requires marionette reallocation.  WE,NE have a  seism peak that should be reduced by further force reallocation to the marionette. Too large correction directly on the mirror Low frequency component that can be moved upwards (marionette)

EM-MSC > conclusions Operation: Continuous attention on operation issues related to operation Strategy disturbance rejection: - A large effort was spent on ID sensing optimization and on “soft operation” - Tools to emulate crucial environmental situations have been developed - Marionette reallocation in 4 suspensions - GIPC in-line To be done before (possibly before the MegaRun): -further technical noise reduction (locking reallocation improvs being done) -improvement of short suspension performance (InjB,MC,OutB, possibly)