C30-20080416-003 1 3GPP2 TSG-C WG3 TITLE : UMB performance results SOURCE: TSG-C WG3 EMAH Contact to: Satoshi Konishi, Vice-chair of EMAH

Slides:



Advertisements
Similar presentations
Evaluation Criteria and Traffic Models Status Update Farooq Khan IEEE Plenary Meeting Portland, Oregon, USA July 12-16, 2004.
Advertisements

IMT-Advanced Technical Requirements Summary of status after 22 nd Meeting of WP8F.
Submission doc.: IEEE /1214r1 September 2014 Leif Wilhelmsson, Ericsson ABSlide 1 Impact of correlated shadowing in ax system evaluations.
Doc.: IEEE /1420r1Nov 2014 Submission Po-Kai Huang (Intel) Slide 1 The Impact of Preamble Error on MAC System Performance Date: NameAffiliationsAddressPhone .
Submission doc.: IEEE /1452r0 November 2014 Leif Wilhelmsson, EricssonSlide 1 Frequency selective scheduling in OFDMA Date: Authors:
An Introduction of 3GPP Long Term Evolution (LTE)
C r2. 2 Conference call summaries Major open issues  Open issues in Traffic models  Other open issues addressed by contributions  Other.
A 4G System Proposal Based on Adaptive OFDM Mikael Sternad.
C Date:30 March, 2009 Abstract: This contribution contains the active set management proposal for cdma2000 1x Rev E Notice Contributors.
Title: Source: Contact: Date: Abstract: Recommendation: Notice © 2000, Panasonic. All rights reserved. The information contained in this contribution is.
Submission doc.: IEEE /0868r0 July 2015 Hakan Persson, Ericsson ABSlide 1 Impact of Frequency Selective Scheduling Feedback for OFDMA Date:
Project: IEEE P Working Group for Wireless Personal Area Networks(WPANs) Submission Title: Link Budget for m Date Submitted: 5 March 2012.
Evaluation Criteria and Traffic Models Update Farooq Khan IEEE Plenary Meeting Orlando, FL, USA March 15-19, 2004.
C GPP2 TSG-C WG3 TITLE : UMB performance results SOURCE: TSG-C WG3 EMAH Contact to: Satoshi Konishi, Vice-chair of EMAH
Date:16 February, 2009 Abstract: This contribution contains OFDMA preamble proposal for EV-DO Rev. C Notice Contributors grant a free, irrevocable license.
Slide title In CAPITALS 50 pt Slide subtitle 32 pt Dynamic and Persistent Scheduling for Voice over IP Traffic in the Long-Term Evolution Uplink Master’s.
© 2006 Sprint Nextel WP5D Meeting Results
Donghee Kim Samsung Electronics ABSTRACT: This contribution shows the summary of changes in evaluation methodology text.
Submission doc.: IEEE /0304r2 March 2015 Joonsuk (Apple) etc.Slide 1 Evaluating Power Save Performance Date: Authors:
Performance Evaluation of Transformation Codebook for 8TX IEEE Presentation Submission Template (Rev. 9) Document Number: IEEE C802.16m-09/2731.
[Qualcomm, Ericsson, Nokia Networks, Huawei,…]
Performance Evaluation of MIMO midamble design for IEEE m IEEE Presentation Submission Template (Rev. 9) Document Number: IEEE C802.16m-09/1237.
[Qualcomm, Ericsson, Nokia Networks, Huawei,…]
Donghee Kim Samsung Electronics ABSTRACT: This contribution shows the summary of changes in evaluation methodology text.
1 Performance comparison of Modulation and Coding set for IEEE m system Document Number: IEEE C802.16m-09/0555r2 Date Submitted: Source:
Evaluation of DL subchannelization IEEE Presentation Submission Template (Rev. 9) Document Number: IEEE C802.16m-09/0347 Date Submitted:
C r3a2 Issues Discussed in Conference Call - Dec 7 Reviewed list of open issues Evaluation Criteria Status Report from the Plenary updated.
Issues in Evaluation Criteria Document November 15, 2006.
Doc.: IEEE /0383r0 Submission Considerations on evaluation methodology for candidate HEW PHY&MAC techniques Date: March 2014 Le Liu, et.
C xx2 Summary of Conference Call – Feb 8 Reviewed contribution C r3 to recap the status of evaluation criteria document Sections in.
3GPP2 LTE Workshop SEOUL, Korea, 27 th– 28 th June GPP LTE Status Status Source Source 3GPP TSG RAN Chairman 3GPP TSG RAN Chairman ETSI TC MSG Chairman.
M2M Study Item 3GPP2 Orlett W. Pearson May | 3GPP2 M2M Study Item | May GPP2 M2M This study will include the following study targets: 
SOURCE: Ke-Chi Jang Yi Song Wang Neng ABSTRACT: This contribution provide comment/suggestion/question.
Date:11 May, 2009 Abstract: This contribution contains the recommendations for DO Rev. C FL MIMO Notice Contributors grant a free, irrevocable license.
VIA Telecom Confidential 1 Date:30 March, 2008 Abstract: This contribution contains proposed modifications on 1x Rev. E Power Control Notice Contributors.
Spectral Efficiency Ad-hoc March 18, Status and Continuation The ad-hoc group will meet again Thursday, March 19, 2004 at 7:00 am In preparation.
Submission doc.: IEEE /1214r0 September 2014 Leif Wilhelmsson, Ericsson ABSlide 1 Impact of correlated shadowing in ax system evaluations.
Date:11 May, 2009 Abstract: This contribution contains the considerations and recommendations for DO Rev. C from a DO VoIP user capacity perspective Notice.
Doc.: IEEE / Submission March 2013 Juho Pirskanen, Renesas Mobile CorporationSlide 1 Discussion On Basic Technical Aspects for HEW Date:
C GPP2 TSG-C WG3 TITLE : RL FullBuffer Simulation Results for Calibration SOURCE: KDDI Corporation Hiroyuki SHINBO, Toshihiko KOMINE,
IEEE C /87. Status of Evaluation Criteria IEEE Evaluation Criteria CG IEEE Interim Meeting September 15-19, 2003.
Fast Cell Switching in Distributed Architecture Qualcomm, Lucent, Airvana, Nortel, Hitachi December 2006.
Doc.: IEEE /0818r1 Submission Further Analysis of Feedback and Frequency Selective Scheduling (FSS) for TGax OFDMA July 2015 Slide 1 Date:
Performance Evaluation of Transformation Codebook for 8TX IEEE Presentation Submission Template (Rev. 9) Document Number: IEEE C802.16m-09/2731.
C Title: Next Steps for Femtocells Date: 03 December 2007 Source: Airvana, Alcatel-Lucent, Nortel Abstract:The contribution addresses.
Evaluation Criteria and Traffic Models Status Update Farooq Khan IEEE Interim Meeting Garden Grove, CA, USA May 10-13, 2004.
Uplink scheduling in LTE Presented by Eng. Hany El-Ghaish Under supervision of Prof. Amany Sarhan Dr. Nada Elshnawy Presented by Eng. Hany El-Ghaish Under.
Wireless & Mobile Network Technology Overview Iain Gillott (512)
Adaptive Roaming between LTE and Wi-Fi 1 Daeguil Science high school, Daegu, Republic of Korea. 2 Daegu Gyeongbuk Institute of Science and Technology,
C R1 1 3GPP2 TSG-C WG3 TITLE : FL BRCH Full Buffer Simulation Results in AWGN for Calibration SOURCE: KDDI Corporation Toshihiko Komine,
Date:03 June, 2009 Abstract: This contribution contains detailed proposal for implementing subband OFDMA in DO Rev. C Notice Contributors grant a free,
Performance Evaluation for 11ac
Continuing Cooperation on IMT Standardization
Evaluation Criteria and Traffic Models Status Update
Month Year doc.: IEEE yy/xxxxr0 November 2017
Comparisons of Simultaneous Downlink Transmissions
LTE-A Relays and Repeaters
Evaluation Model for LTE-Advanced
2009 TIMELINE PROJECT PLANNING 12 Months Example text Jan Feb March
TGn Simulation Methodology Validation Proposal
Joint submission for Box 5 calibration
IMT-Advanced Technical Requirements
OFDMA performance in 11ax
Strawmodel ac Specification Framework
Current Status of submission about EUHT
2009 TIMELINE PROJECT PLANNING 12 Months Example text Jan Feb March
AP Coordination in EHT Date: Authors: Name Affiliations
Summary of Conference Call – Feb 8
Consideration on System Level Simulation
doc.: IEEE yy/xxxxr0 Date: September, 2019
Presentation transcript:

C GPP2 TSG-C WG3 TITLE : UMB performance results SOURCE: TSG-C WG3 EMAH Contact to: Satoshi Konishi, Vice-chair of EMAH ABSTRACT: This contribution provides performance results of UMB (Ultra Mobile Broadband) system. In addition, the EMAH (Evaluation Methodology Ad-Hoc) activities for the UMB characterization are also summarized in this contribution. RECOMMENDATION: Review and adopt for the submission from TSG-C ©2008 3GPP2. All rights reserved.

C Outline 1.Introduction 2.Background  Activities in TSG-C WG3 EMAH for performance evaluation of UMB system  Calibration process among companies 3.Simulation conditions for UMB performance evaluation 4.Simulation results 5.Conclusion 6.Appendix: A.Examples of link level simulation results B.System level simulation results for calibration C.Backup slides for simulation results under NGMN setup

C Introduction Standardization of UMB system  March 2006 to February 2007: Decision of framework and components  April, 2007: Publication of UMB Air Interface Specification Version 1.0  May to August, 2007: Revision of UMB Air Interface Specification  September, 2007: Publication of UMB Air Interface Specification Version 2.0 However, UMB characterization has not been completed yet … Necessity of Performance evaluation for UMB system!

C Background (1) ~ History on Activities for Performance Evaluation of UMB ~ History:  June, 2007: agreed upon to start UMB characterization  July to August, 2007: preparatory work (e.g. outline of simulation setting, parameters, timeline)  August to December, 2007: Calibration of link curves  December 2007 until now: Calibration of system level simulation results

C Background (2) ~ Calibration Processes for UMB Performance Evaluation ~ Link level simulations:  From Aug., 2007, each company began to provide simulation results  Oct, 2007: confirmed that three companies (Samsung, Huawei, and KDDI) were aligned  Nov. to Dec., 2007: another two companies (Qualcomm and Alcatel-Lucent) were also aligned with the three companies Appendix A: examples of link level simulation results

C Background (3) ~ Calibration Processes for UMB Performance Evaluation ~ System level simulations:  From Dec., 2007, companies (KDDI, Samsung, Nortel, Qualcomm, Huawei, and Alcatel-Lucent) began to provide simulation results  In total, five rounds have been performed for calibration among companies so far  March, 2008: confirmed that all the companies involved in the calibration (KDDI, Samsung, Nortel, Qualcomm, and Huawei) were aligned on the full-buffer traffic model in the forward link (FL-FB)  April, 2008: confirmed that all the companies involved in the calibration were aligned on the VoIP traffic model in the forward link (FL-VoIP)  Up to now: most of the companies have been aligned in the remaining simulation scenarios as follows Full-buffer traffic model in the reverse link (RL-FB) VoIP traffic model in the reverse link (RL-FB) Full-buffer traffic model in the forward link with MIMO (FL-MIMO) Appendix B: examples of system level simulation results

C Toward UMB Performance Evaluation For the purpose of calibrations among companies, we use a set of simplified simulation models such as  Simplified power control model compared to the UMB air interface specification  No power control in the forward link  No rank adaptation in the FL-MIMO simulations  Etc. This presentation provides actual performances both  taking account of the realistic scenarios as in above and  using simulation parameters in the NGMN’s evaluation methodology document

C Simulation Parameters

C Simulation Conditions for Full Queue Traffic Model System bandwidth – 992 subcarriers over 10MHz Overhead  Guard band – 32 subcarriers  CP us  Control overhead – 6 tiles (96 subcarriers) in FL with 10% power overhead, one CDMA subsegment (128 subcarriers) every 8 frames and 2 tiles (32 subcarriers) for R-ACKCH every frame  Superframe preamble – one out of 26 frames (3.85%) Scheduler – Equal resource scheduler (similar to proportional fair) Power control – No power control for FL. OSI-based power control for RL with DataCtoI range [-3dB,10dB] and IoT target 7.5dB Antenna configurations  SIMO1x2 for FL and RL  MIMO2x2 with precoding (64 precoding matrices used) and rank selection for FL

C ~ Full Queue Traffic Model ~ Simulation Results Average sector throughput and spectrum efficiency Average user throughput and spectrum efficiency Cell-edge user throughput and spectrum efficiency Non-MIMO (1x2) 12.5 Mbps1.25 Mbps0.38 Mbps MIMO (2x2) 13.3 Mbps1.33 Mbps0.50 Mbps  Forward link (Downlink) Average sector throughput and spectrum efficiency Average user throughput and spectrum efficiency Cell-edge user throughput and spectrum efficiency Non-MIMO (1x2) 9.46 Mbps0.95 Mbps0.36 Mbps  Reverse link (Uplink)

C Simulation Conditions for VoIP Traffic Model System bandwidth – 480 subcarriers over 5MHz Overhead  Guard band – 32 subcarriers  CP us  Control overhead – 4 tiles (64 subcarriers) in FL with 26% power overhead, 160 subcarriers in RL, including one CDMA subsegment (128 subcarriers) and 2 tiles (32 subcarriers) for R-ACKCH  Superframe preamble – one out of 26 frames (3.85%) Power control – Target termination based power control. Antenna configurations – SIMO1x2 for FL and RL

C ~ VoIP Traffic Model ~ Simulation Results VoIP capacityAverage latency95 percent tile of 98% packet delay Non-MIMO (1x2) ms45ms  Forward link (Downlink) VoIP capacityAverage latency95 percent tile of 98% packet delay Non-MIMO (1x2) 30015ms50ms  Reverse link (Uplink) * Since the VoIP system is RL limited, though the FL VoIP capacity is far more than 350, we did not simulate to find the actual number.

C Conclusions This contribution summarizes activities in TSG-C WG3 EMAH for UMB characterization  Calibration of both link- and system-level simulations has been almost completed UMB performance results are provided using NGMN simulation conditions.

C References [1]3GPP2, “Ultra Mobile Broadband (UMB) Air Interface Specification,” C.S ~009 v.2.0, Sep [2]NGMN Alliance, “NGMN Performance Evaluation Methodology” Version 1.2, June 2007.

C Appendix A ~ Examples of link level simulation results ~

C Link level results (1) FL, BRCH, 8 tiles, PF#10 H: Huawei S: Samsung K: KDDI Q: Qualcomm A: Alcatel-Lucent AV: Averaged values

C Link level results (2) RL, 1 tiles, PF#5 H: Huawei S: Samsung K: KDDI Q: Qualcomm A: Alcatel-Lucent AV: Averaged values

C Appendix B ~ System level simulation results for calibration~

C System level simulation results (1) ~ FL, Full-buffer Traffic, Ped-B w/ 3km/h ~

C System level simulation results (2) ~ FL, VoIP Traffic, Ped-B w/ 3km/h ~

C System level simulation results (3) ~ RL, VoIP Traffic, Ped-B w/ 3km/h ~

C Appendix C ~ Backup slides for simulation results under NGMN setup~

C ~ Full Queue Traffic Model ~ Simulation Results (1)

C ~ Full Queue Traffic Model ~ Simulation Results (2)

C ~ Full Queue Traffic Model ~ Simulation Results (2)

C ~ VoIP Traffic Model ~ Simulation Results (1)

C ~ VoIP Traffic Model ~ Simulation Results (2)

C ~ VoIP Traffic Model ~ Simulation Results (2)