Joe Stephens 16 February 2010 Joe Stephens 16 February 2010 “Good Practices”

Slides:



Advertisements
Similar presentations
Project Cycle Management
Advertisements

Copyright © 1999 Harcourt Brace & Company Canada, Ltd. Chapter 9 Human Resource Development Falkenberg, Stone, and Meltz Human Resource Management in Canada.
A BPM Framework for KPI-Driven Performance Management
Ensure the Disaster Housing Strategy is institutionalized throughout the jurisdiction Identify a process to update and maintain the Disaster Housing Strategy.
ISOE Presentation 30 May 2011 Joe Stephens. The Tsb Context  Tsb Sugar – Wholly owned subsidiary of Remgro with Head Office in Malelane and was founded.
Presentation to HRPA Algoma January 29, My favourite saying… Fail to plan, Plan to Fail. 2.
Improving Individual Performance: Effective Performance Management for Small States Presented by Curt P. Wellington.
Ministry of Public Health and Sanitation Ministry of Medical Services PERFORMANCE REPORTING 1.
HOUSTON EMPLOYEE ASSESSMENT AND REVIEW (HEAR) PROCESS INFORMATION SESSION NON-SUPERVISOR For more information, visit
HOUSTON EMPLOYEE ASSESSMENT AND REVIEW (HEAR) INTERIM APPLICATION ORIENTATION FOR TRAINERS & HEAR ADMINISTRATORS For more information, visit
“How” We Do It An Introduction to NSLIJ’s Behavioral Expectations Model.
System Office Performance Management
1 Introduction to Workforce Planning and Development in State of Alaska Executive Branch Departments.
PERFORMANCE FOR ALL The Project & the System. A HE project co-ordinated by University of Bristol, open to HE internationally. Developing the requirements.
Introduction to Management
Performance Management
22000 Food Safety Management Systems
Quality Performance Appraisal for Library Staff Teresa To Run Run Shaw Library City University of Hong Kong 11 April 2007.
Organizational Design, Diagnosis, and Development Session 19 Techno-structural Interventions, II Employee Involvement.
WGEA Benchmark Reporting Our gender reporting outcomes Detailed report pack THIS IS A TEMPLATE DOCUMENT.
System Office Performance Management
Building a Continuous Improvement Culture BackgroundBackground The Client is a global innovator, manufacturer and distributor of Applied Thermal equipment.
Performance Management Upul Abeyrathne, Dept. of Economics, University of Ruhuna, Matara.
Human Resource Management (Business Strategy)
Levels of management Functions of managers Managerial skills Management styles Management.
Introduction to Human Resource Development Moving from HRM to HRD Contd…. Lecture 10.
Strategic Management of Human Capital Recruitment Strategy
BASICS OF WORKFORCE PLANNING
Welcome ISO9001:2000 Foundation Workshop.
Key changes from OHSAS 18001:1999

Foundations of Planning
****** MUSOLINO Management, Leadership, and Empowerment 7 CHAPTER *
9 Closing the Project Teaching Strategies
©2013 Cengage Learning. All Rights Reserved. Business Management, 13e Management, Supervision, and Decision Making Increasing Management Effectiveness.
MANAGEMENT…. INTRODUCTION
BBA 229 Training and Development Lecture 2 Strategic Training
McGraw-Hill/Irwin Copyright © 2008 by The McGraw-Hill Companies, Inc. All rights reserved. Providing Orientation and Training Training is important to.
Lecture 06
EFFECTIVENESS OF TRAINING Group 5. Effectiveness of Training  What is “effectiveness of training”? Effectiveness means producing an intended result.
Traditional Organizational Structures
Developing and Implementing a Successful Workforce Development Plan Ron Bialek, President, Public Health Foundation John Moran – Senior Quality Advisor,
© Grant Thornton | | | | | Guidance on Monitoring Internal Control Systems COSO Monitoring Project Update FEI - CFIT Meeting September 25, 2008.
Copyright  2005 McGraw-Hill Australia Pty Ltd PPTs t/a Australian Human Resources Management by Jeremy Seward and Tim Dein Slides prepared by Michelle.
Performance Management  Performance Management Cycle  Organizational Success  Shared Responsibilities  Setting Goals and Expectations.
Basic Concepts in Management. Management Types All manager’s job are not the same. Managers are responsible for different departments, work at different.
Basic Concepts in Management. Manager Someone who coordinates and oversee the work of other people so that organizational goal can be achieved.
1.
Performance Management
Human Resource Management (Business Strategy) Prepared by Grace Amin, M.Psi, Psikolog.
System Office Performance Management Human Resources Fall 2015.
EN Regional Policy EUROPEAN COMMISSION Information and Publicity SFIT meeting, 12 December 2005 Barbara Piotrowska, DG REGIO
A Guide for Management. Overview Benefits of entity-level controls Nature of entity-level controls Types of entity-level controls, control objectives,
Hitting the Leadership Target Through Leadership and Accountability.
Evaluate Phase Pertemuan Matakuliah: A0774/Information Technology Capital Budgeting Tahun: 2009.
1-1 Chapter IV – Controlling Objectives: I.Definition of Controlling II.The importance of Controlling III.Levels of Control IV.Major Steps in Controlling.
MINE SAFETY MANAGEMENT PLAN. DIRECTORATE GENERAL OF MINES SAFETY DGMS n It is recommended that mines be required to put in place Mine Safety Management.
COMPETENCY MAPPING ASSESSMENT & DEVELOPMENT BY : SUBHASHIS CHATTERJEE Sr. MGR (PERSONNEL)
UNIT 4 WORKER / EMPLOYEE INVOLVEMENT AND PARTICIPATION.
School practice Dragica Trivic. FINDINGS AND RECOMMENDATIONS FROM TEMPUS MASTS CONFERENCE in Novi Sad Practice should be seen as an integral part of the.
Performance Management -Uttam Acharya
Performance Management -Uttam Acharya
Strategic Management of Human Capital Recruitment Strategy
Chapter 2 Performance Management Process
Career Banding Program for North Carolina State Government Employees
Performance Management
Project Management Process Groups
FUNCTION OF MANAGEMENT
ESTABLISHING A TRAINING COMMITTEE
Department of Planning Monitoring and Evaluation
Presentation transcript:

Joe Stephens 16 February 2010 Joe Stephens 16 February 2010 “Good Practices”

Background Three Level Company Training Structure Three Level Company Training Structure CHAIRMAN Strategic T & D Committee Departmental Training Sub-Committee Divisional Training Steering Committee Upward & DownwardFeedback & Guidance

Three Level Company Training Structure in Operation  Tsb Sugar RSA Ltd is a Sugar Milling Company situated in the eastern part of the Mpumalanga Province. Cane husbandry also forms a substantial part of the Company operations. Over many years Tsb has placed a high emphasis on People development.  The way in which the Organization has planned, implemented, monitored and evaluated its skills development interventions is by utilizing an integrated Performance Management System, which is sponsored from the highest level of authority down to the lowest Supervisory levels in the Company.  The emphasis on People Training and Development originated on MD level from where he represents the highest managerial level in the organization and then this emphasis cascaded down to the lower levels in the hierarchy. ( See Strategic T&D Committee, Divisional Steering Committee and Departmental Training Sub-Committee here below)  The Company SDF plays a significant role in terms of the various Training initiatives on all Company levels, monitors the Training processes on all the said levels and also provides constant vertically up- and downward feedback regarding progress on various Training projects and new directions to be taken up.  Trade Union participation is accommodated on the Departmental levels where Employee representatives are participating in Training discussions and decisions.

Person 1 Competence 1 Skills Required - Competence 2 Skills Required - Evaluate  x x  Skills GAP Person 2 Competence 1 Skills Required - Competence 2 Skills Required - Skills GAP Evaluate  x x   x x x x  x x Competence Dept Training Plan : W.S.P SKILLS Person 1 Person 2 Person 3 Person x   xxx xxxxxx Determine Competency % Filling the Gaps Dept Training Schedule Person 1 Person 2 J F M A M J J A S O N D Unit Standards Assessment Process RPL Portfolios Evaluation & Judgement Review skills gaps (Jobs discussion) Job 1 Description Job 2 Description Job 3 Description Competencies required Competencies required Competencies required Job 4... Record evaluation & Judgement Feedback to Assessed, SETA + Training Department (A.T.R.) Training/ Development Process Training Budget

The Training Process  The Planning, Implementation, Monitoring and Evaluation of all the Training & Development interventions originates at employee level where his/her Competencies are evaluated against the required competencies listed in his/her Job Description. (See top left of Diagram above and follow description in a clock wise direction).  The “Gaps” are then captured in a “Workplace Skills plan”, which is a life document and which serves as a Performance Management tool to the Line Manager. These “Gaps” are also listed on the WSP which gets sent off to the AgriSETA.  The training “Gaps” are then scheduled to be addressed during training sessions and if any Unit Standards are available for the required training, it will be retrieved from the Web in order to be used during Training.  The Training/Development intervention requires funding as indicated here above.  The “heart” of the process is Evaluation/Assessment, after which certain judgments have to be made. The assessments are recorded and communicated to the individual.  The “training done” are then captured in a “Annual training report ”, which is a controlling instrument to the Line Manager. This “training done” is also listed on the ATR which gets sent off to the AgriSETA.  The circled arrow indicates that the process is constantly repeated in order to ensure that the “Skills Gap” is closed at some point in time.

Sugar Supervisors - ROBOT

The ROBOT  The ROBOT approach is the Skills Development “good practice” within our Production Plants which contributes to our Success.  The example which is used refers to the evaluation of Production Supervisors in our Sugar Manufacturing Plants.  The levels of competencies are determined by means of a “ Four point scale, weighed dimensional evaluation form”, (See diagram above) which is designed to cover Plant Control-, Management of Shift personnel- and also Safety dimensions.  The detail of each dimension is evaluated per person, quantified and then displayed on the ROBOT diagram. All outcomes of the various dimensions are added together which places the employee in either the “green band” (Fully competent), “yellow band” (still a few learning areas) or the “red band” which is an indication of many developmental areas still to be covered.  The ROBOT diagram gives a Line Manager a quick overview of the real competency levels of employees in various jobs, whether it is critical or not. The ROBOT diagram triggers training interventions throughout all Company Divisions

Implementation

Outcome

Selati !