DOC ID © Chevron 2005 Chevron PRODML Pilot Activities Vendor Participants: Invensys Weatherford Tibco Halliburton Matrikon Euriware Energy Components.

Slides:



Advertisements
Similar presentations
PRODML WG 2007 Smart well zonal allocation. PRODML WG 2007 The Problem To run smart wells at its optimum level it must be possible to determine the zonal.
Advertisements

Completion Object Overview June 2013 WITSML/PRODML Standards.
Reliability Software1 Reliability Software Minimum requirements & Best practices Frank Macedo - FERC Technical Conference July 14, 2004.
Karolina Muszyńska Based on:
© 2011 Chevron Copyright People, Process and Technology Making IT a strategic capability Randy Krotowski CIO, Global Upstream Chevron Corporation.
Enterprise Upstream Product Direction and Enhancements.
Enabling Integration of Core Work Processes in Upstream Oil and Gas
TECH 101 Product Design and Manufacturing. TECH 1012 System Life-Cycle Engineering 2 Major phases in almost all products and in many cases services –Acquisition.
Stephen S. Yau CSE , Fall Security Strategies.
Igal Kaptsan Research Director Applied Research, Bentley Systems Change Management.
1 CONCENTRXSept 2000 Our Perspective “Integration without an architecture is like doing a jigsaw puzzle on your lap “ – R Tessier We look at the big picture.
Integrated Information Platform for reservoir and subsea production systems The Integrated Information Platform (IIP) project IIP Chairman Svein Omdal,
Preliminary Assessment Tribal Emergency Response Preparedness Dean S. Seneca, MPH, MCURP Agency for Toxic Substances and Disease Registry Centers for Disease.
ISA–The Instrumentation, Systems, and Automation Society SP99 Work Group 2 TR#2 “Second Edition” Long Beach Meeting April 28, 2004.
Shell Pilot Project PRODML Work Group 2007 DTS Reconciliation Workflow.
RAM Modelling in the Project Design Phase Friday 30 th April, 2010 Paul Websdane Reliability Modelling for Business Decisions Asset Management Council.
© Copyright 2005 POSC Production Reporting (draft specifications) Overview.
<PRODML/> - Industry Standard
Energistics Asia South Region Meeting (Production) PRODML SIG Update
PRODML Review Energistics Western Europe London, 31 May 2011.
Slide 1. © 2012 Invensys. All Rights Reserved. The names, logos, and taglines identifying the products and services of Invensys are proprietary marks.
Shell Global Solutions PRODML Business Overview Ron Cramer.
PRODML Overview – Energistics Seminar
So What? Operations Management EMBA Summer TARGET You are, aspire to be, or need to communicate with an executive that does not have direct responsibility.
Workflow for Finding Bypassed Reserves in Mature Assets  Real Time Integration of Simulation, Seismic Interpretation, and Geophysics  Best Answers Possible.
©2005 Aspen Technology, Inc. All rights reserved. Oil & Gas Integrated Operations using aspenONE Nick Barnett.
Demand Forecasting
Office of Pipeline Safety Integrity Management Inspection Process Louisiana Pipeline Safety Seminar August 2003.
Approvals Management with TCA Hierarchy Ajoy A. Devadawson Oracle Corporation - Consulting.
SPE Digital Energy Conference Session Rusty Foreman - BP.
Shell Global Solutions PRODML Business Overview Ron Cramer.
1 VALUE NOW, VALUE OVER TIME © 2010 OSIsoft, Inc. | Company Confidential Empowering Business in Real Time. © Copyright 2010, OSIsoft LLC. All rights Reserved.
1 Agenda Introduction Energistics Standards Panorama / History / Participants Web Services Interoperability Standards v1.0 WITSML Version 1.x Services.
WITSML Paris 16-May-2007 Rick Morneau
Overview of All Tasks March , Milan, Italy.
WITSML Public Seminar and Vendor Exhibition: Welcome Alan Doniger, Energistics CTO May 28, 2009.
NTEU Update Briefing World-Class Enterprise Operations
Submitted by Pawan kumar sharma Pgdm 2 nd sem.. Objective of presentation Introduction Definition History Production Types of production Operation Objective.
Advance Notification Streamlined Acceptance and Visibility for First-Class Mail MTAC Workgroup 102.
CEOS accomplishments in 2011 and future challenges Enrico Saggese ASI 25th CEOS Plenary Lucca 8-9 November 2011.
Manufacturing Plant maintenance Materials management Quality management.
PRODML Network Model Pilot November BP Network Model Team Joe PalatkaBP Jim BettencourtBP (SAIC) Ray VerhoeffOSIsoft Per Arild AndersonKongsberg.
e-petroleumservices.com 1 Gas Lift Automation Dr Alasdair S Brown Technical Manager EPS Americas.
e&pdct Using WITSML to deliver enhanced D&C performance in BP Presentation to public meeting 19/10/06 Julian Pickering, Domain Lead Drilling & Completions.
Pro–Op Process Optimization Review  How can we get as much product, produced at the wellhead, to the sales meter? PRO-OP Concept  PRO-OP – a systematic.
1 Future Consideration for WITSML from Total Products should migrate to the same version of WITSML Need provisions for backup in case of system failure.
PRODML Roadmap Energistics 2 nd Annual Standards Summit 2 November 07 Laurence Ormerod, Weatherford.
Employment of scada system in water purification and transmission system.
1 State of Connecticut Core-CT Continuing Education Initiative Asset Management for Asset Processors.
Preliminary Assessment Tribal Emergency Response Preparedness
Cash and Liquidity Management Scenario Overview
Over-the-Counter Sales Scenario Overview
Orange Contribution to ONAP project Northbound API October update
Pull Manufacturing and Just In Time
CMRP - Certified Maintenance & Reliability Professional.
Materials in Projects from Project Purchase Requests Scenario Overview
Julian Pickering, Domain Lead Drilling & Completions
Customer Contract Management Scenario Overview
RAIN Live Oak Data Provenance API
Order-to-Cash (Project-Based Services) Scenario Overview
Processing Supplier Invoices Processing Payables and Payments
Materials in Projects from Project Purchase Requests Scenario Overview
Customer Contract Management Scenario Overview
Over-the-Counter Sales Scenario Overview
Order-to-Cash (Project-Based Services) Scenario Overview
Add Engineering Value to your Project through BIM Preconstruction Services Preconstruction Services BIM Engineering U.S., L.L.C. – Best Preconstruction.
Processing Supplier Invoices Processing Payables and Payments
PRODML WG07 Chevron Pilot
Presentation transcript:

DOC ID © Chevron 2005 Chevron PRODML Pilot Activities Vendor Participants: Invensys Weatherford Tibco Halliburton Matrikon Euriware Energy Components

DOC ID © Chevron 2005 Background Chevron’s pilots have a few common characteristics: Using a large brownfield waterflood field as a basis Concentrating on water handling Providing a number of vendor opportunities Developing in-house capability Expanding in scope over time

DOC ID © Chevron 2005 Background (cont…) 2006: Compared Field vs Facility forecasts and notified operator. Stress tested the standard with multiple 700 well data calls in a single process model 2007: Combined multiple elements – forecasting, real time capacity management, field network optimization and cross- functional visualization 2008: A: Continue to refine pilot to plug and play pieces (8) that are “fit for purpose” B: Testing new WG07 functionality (SAM-Shared Asset Model, extensibility) C: Working with other PRODML members on NOJV reporting D: Preparing to test the use of WITSML data for well modeling

DOC ID © Chevron 2005 Characteristics of a Workflow A workflow … should systematically organize components; should define roles, for operator personnel, for vendors and for automated systems; must have endpoints that effectively define the purpose of the process; needs defined information exchanges (such as those defined as part of the PRODML Standards); needs visibility of information flow; … and looking ahead to results, a workflow: leads to achievable results; has a process that can be documented and learned; enables measurement of results.

DOC ID © Chevron 2005 End to end workflows are complicated

DOC ID © Chevron 2005 We chose water management so we could prepare definable process blocks

DOC ID © Chevron 2005 Typical setup – Note how we can separate IT and Tech activities

DOC ID © Chevron 2005 Data Integrator Chevron Pilot Invensys Facility SCADA History Weatherford Well Test History Local System (SS) Field Oil Sales / Inventory History Local System Field Gas Sales History Weatherford Status History Energy Components Daily Allocation / Status / Well Listing Weatherford LOWIS Well Status Forecast Halliburton DSS Well Production Forecast Invensys InFusion Tank Forecast Invensys Notification 2b 4a 14 Future: Check well test before shut in order 15 Same as 9a/b 2a a 6a 7a 89a 1112a 13 Future; Add to tank forecast 1 Trigger: Clock set for once a day 2 GetFromStore: Get tank data (7 days) 3 Model: 7 day tank forecast 34 AddToStore: Pass tank forecast 4b 5 AddtoStore: Alarm to notification 5b 6 GetFromStore: Well forecasts 6b 7 GetFromStore: Well allocated production (x days) 7b 8 Model: 7 day production forecast 9 GetFromStore: well status forecast 9b 10 Model: Maintenance forecast 11 Model: Well vs Facility Qw in 12 AddToStore: Consolidate data 12b

DOC ID © Chevron 2005 Chevron Pilot

DOC ID © Chevron – Meet Workflow Criteria Plug & Play / Intersecting Workflows B Forecast A Pre- Processor C RT Tank Level Mngt D Well Changes E Source Wtr Needs F Network Opt. G Except. Report H X-F(x) Visual E’ Injection Targets G’ Well Model B’ Alternate Model B” Alternate Model Fit for purpose – forecast accuracy meets need of next step Test WITSML Data acquisition – Automate well model building Touch point – Reservoir management sets targets Test Shared Asset Model – Network changes

DOC ID © Chevron – NOJV Reporting BA Opportunity Assessment CD E Organize interested parties Prepare project plan Given: use North Sea example as guide Get internal input vs guide