Brookhaven Science Associates U.S. Department of Energy 1 LECC2005 Advanced Front End Signal Processing Electronics for ATLAS CSC System: Status and post.

Slides:



Advertisements
Similar presentations
CSC Test Beam Data Analysis Alexander Khodinov and Valeri Tcherniatine.
Advertisements

E/π identification and position resolution of high granularity single sided TRD prototype M. Târzilă, V. Aprodu, D. Bartoş, A. Bercuci, V. Cătănescu, F.
CMS GEM Workshop III, April 20, 2012
Specific requirements for analog electronics of a high counting rate TRD Vasile Catanescu NIHAM - Bucharest CBM 10th Collaboration Meeting Sept 25 – 28,
S 1 Summer Student Sessions 13 August 2008 Chew Soo Hoon University Of Malaya, Malaysia Jan Stark LPSC, Grenoble, France
ESODAC Study for a new ESO Detector Array Controller.
D. Peterson, “Status of the Cornell/Purdue Program” TPC R&D Mini Workshop, Orsay 12-January Status of the Cornell/Purdue Program: first events with.
Muon Tracker Overview The PHENIX Muon Arms detect vector mesons decaying into muon pairs, allow the study of the Drell-Yan process, and provide muon detection.
US FAST site test results – a global view from ROOT T. Ferguson, A. Korytov, N. Terentiev* CMS EMU Meeting The Ohio State University April 16 – 17, 2004.
University of California, Irvine D. Hawkins, A. Lankford, M. Medve, S. Pier, M. Schernau, S. Shim, D. Stoker Brookhaven National Laboratory A. Gordeev,
Module Production for The ATLAS Silicon Tracker (SCT) The SCT requirements: Hermetic lightweight tracker. 4 space-points detection up to pseudo rapidity.
US FAST site test results – a global view from ROOT T. Ferguson, A. Korytov, N. Terentiev* CMS EMU Meeting The Ohio State University April 16 – 17, 2004.
Nilanga Liyanage University of Virginia UVa GEM Team Dr. Kondo Gnanvo, Dr. Vladimir Nelyubin, Kiadtisak Saenboonruang, Chao Gu, Xinzhan Bai, Jie Liu, Seth.
Electromagnetic Compatibility of a Low Voltage Power Supply for the ATLAS Tile Calorimeter Front-End Electronics G. BLANCHOT CERN, CH-1211 Geneva.
Electromagnetic Compatibility of a DC Power Distribution System for the ATLAS Liquid Argon Calorimeter G. BLANCHOT CERN, CH-1211 Geneva 23, Switzerland.
Mass production testing of the front-end ASICs for the ALICE SDD system L. Toscano a, R. Arteche Diaz b,d, S. Di Liberto b, M.I. Martínez a,c, S.Martoiu.
Performance of SPIROC chips in SKIROC mode
Performance test of STS demonstrators Anton Lymanets 15 th CBM collaboration meeting, April 12 th, 2010.
1 HBD Commissioning (II) Itzhak Tserruya HBD group meeting November 28, 2006 Progress from October 3 to November 28, 2006.
PMF: front end board for the ATLAS Luminometer ALFA TWEPP 2008 – 19 th September 2008 Parallel Session B6 – Programmable logic, boards, crates and systems.
Silicon Sensor with Readout ASICs for EXAFS Spectroscopy Gianluigi De Geronimo, Paul O’Connor Microelectronics Group, Instrumentation Division, Brookhaven.
FCAL R&D in Minsk Group: Sensors and Electronics FCAL Collaboration MPI Munich October 17, 2006, Munich, Germany Presented by Igor Emeliantchik.
1 Hall D Drift Chamber ElectronicsFJ Barbosa Drift Chamber Review6-8 March 2007 Electronics for CDC and FDC Hall D 1.Motivation 2.ASIC Development 3.Preamp.
A Study of Time over Threshold (TOT) Technique for Plastic Scintillator Counter 高能物理研究所 吴金杰.
Updates on GEMs characterization with APV electronics K. Gnanvo, N. Liyanage, K. Saenboonruang.
Konstantinos Nikolopoulos University of Athens / BNL ATLAS Cathode Strip Chambers Installation and Commissioning XXVI Workshop on Recent Developments in.
S.Vereschagin, Yu.Zanevsky, F.Levchanovskiy S.Chernenko, G.Cheremukhina, S.Zaporozhets, A.Averyanov R&D FOR TPC MPD/NICA READOUT ELECTRONICS Varna, 2013.
Qualification Test of UFE Board  Schematic diagram of UFE  Board types and current status  Qualification test procedures  VA & UFE test setup 
Performance of a 128 Channel counting mode ASIC for direct X-ray imaging A 128 channel counting ASIC has been developed for direct X-ray imaging purposes.
The Readout Electronics for TPC with GEM readout chamber (and for almost any other readout chamber) Anders Oskarsson Lund Univ. Electronics: Bruxelles,
Update on SBS Back Tracker UVa K. Gnanvo, N. Liyanage, V Nelyubin, K. Saenboonruang, Seth Saher, Nikolai Pillip (visiting from Univ. Tel Aviv, Israel)
Hold signal Variable Gain Preamp. Variable Slow Shaper S&H Bipolar Fast Shaper 64Trigger outputs Gain correction (6 bits/channel) discriminator threshold.
GEM Trackers for Super BigBite Spectrometer (SBS) in Hall JLab The Super Big Bite Spectrometer (SBS) is one of the major new equipment in hall A in.
Optical Part of the CMB for AHCAL-CALICE Jaroslav Zalesak Institute of Physics, Prague.
A Study of Proton-Proton Collisions at the LHC The Ohio State University - Task A.2 B.G. Bylsma, L.S. Durkin, D. Fisher, J Gilmore, J.H. Gu, D. Larson,
Anatoli Romaniouk TRT Introduction TRT in ATLAS p. 2-4TRT in ATLAS p. 2-4 TRT design p. 5-7TRT design p. 5-7 TRT operation principles p. 8-9TRT operation.
Status Report for KEK-PS E391a KEK IPNS G.Y.Lim 14 April 2003.
BNL’s Role in ATLAS Hong Ma DOE Annual HEP Review Brookhaven National Lab April 22, 2003 From Construction to the Installation/Commissioning.
Mariana Petris, NIPNE Bucharest CBM Meeting, March 9 -12, 2005 HIGH COUNTING RATE TRANSITION RADIATION DETECTOR Bucharest Prototype In Beam Tests.
The GEM activities at Tsinghua University Zhigang Xiao 1, Yan Huang 1, Rensheng Wang 1, Haiyan Gao 1,2 1 Department of Physics, Tsinghua University 2 Dept.
Front-End Electronics for PHENIX Time Expansion Chamber W.C. Chang Academia Sinica, Taipei 11529,Taiwan A. Franz, J. Fried, J. Gannon, J. Harder, A. Kandasamy,
June 6, 2001 Paul O’Connor, BNL ATLAS Cathode Strip Chambers.
DOE/NSF Review of U.S. ATLAS May 21-23, 2003 CSC Mechanics and Electronics Paul O’Connor Tom Muller BNL May 22, 2003.
CALICE Tungsten HCAL Prototype status Erika Garutti Wolfgang Klempt Erik van der Kraaij CERN LCD International Workshop on Linear Colliders 2010, October.
2002 LHC days in Split Sandra Horvat 08 – 12 October, Ruđer Bošković Institute, Zagreb Max-Planck-Institute for Physics, Munich Potential is here...
GEM R&D updates from Chinese groups Yuxiang Zhao University of Science and Technology of China May 24,
1 HBD Commissioning Itzhak Tserruya DC meeting, BNL December 13, 2006 Progress from October 3 to November 28, 2006.
LHCf Detectors Sampling Calorimeter W 44 r.l, 1.6λ I Scintilator x 16 Layers Position Detector Scifi x 4 (Arm#1) Scilicon Tracker x 4(Arm#2) Detector size.
MuTr Chamber properties K.Shoji Kyoto Univ.. Measurement of MuTr raw signal Use oscilloscope & LabView Read 1 strip HV 1850V Gas mixture Ar:CO 2 :CF 4.
DHCAL Jan Blaha R&D is in framework of the CALICE collaboration CLIC08 Workshop CERN, 14 – 17 October 2008.
The PHENIX Time Expansion Chamber A. Franz, J. Gannon, J. Mahon, S. Mioduszewski, E. O’Brien, R. Pisani, S. Rankowitz Brookhaven National Lab, Upton, New.
Juan Valls - LECC03 Amsterdam 1 Recent System Test Results from the CMS TOB Detector  Introduction  ROD System Test Setup  ROD Electrical and Optical.
HCAL1 Status 2004 Oleg Gavrishchuk, JINR, Dubna 1. HCAL1 performance in 2004 General design High Voltage system LED monitoring 2. Stability in 2003 Led.
A Brand new neutrino detector 「 SciBar 」 (2) Y. Takubo (Osaka) - Readout Electronics - Introduction Readout electronics Cosmic ray trigger modules Conclusion.
Performance characteristics of COTS 10Gb/s Optical Links for SLHC Experiments Jan Troska, Markus Axer, Karl Gill, Robert Grabit, Raquel Macias Jareno,
CBM 12 th Meeting, October 14-18, 2008, Dubna Present status of the first version of NIHAM TRD-FEE analogic CHIP Vasile Catanescu and Mihai Petrovici NIHAM.
17 Apr 2002 MCLARG Electronics Meeting News HEC Preshaper PRR passed on Thursday Apr 11 LECC02 (Workshop on LHC Electronics) will be held in Colmar, France.
G.F. Tassielli - SuperB Workshop XI LNF1/11 02/12/2009 Status report on CLUster COUnting activities G. F. Tassielli on behalf of CLUCOU group SuperB Workshop.
BRAN at IR2 and IR8: status, commissioning and operation Enrico Bravin AB-BI Joint LHC Machine-Experiments Workshop on Very Forward Detectors 25 January.
MDT second coordinate readout: status and perspectives
A General Purpose Charge Readout Chip for TPC Applications
EZDC spectra reconstruction and calibration
VMM3 Early Testing George Iakovidis, V. Polychronakos
Resolution Studies of the CMS ECAL in the 2003 Test Beam
Pulse Shape Fitting Beam Test September, October CERN
Multigap Resistive Plate Chambers for EAS study in the EEE Project
A Low Power Readout ASIC for Time Projection Chambers in 65nm CMOS
The digital read-out for the CSC system of the TOTEM experiment at LHC
The digital read-out for the CSC system of the TOTEM experiment at LHC
Setup for testing LHCb Inner Tracker Modules
Presentation transcript:

Brookhaven Science Associates U.S. Department of Energy 1 LECC2005 Advanced Front End Signal Processing Electronics for ATLAS CSC System: Status and post production performance Sachin Shrirang Junnarkar, Paul O’Connor, Anand Kandasamy Brookhaven National Laboratory 11th Workshop on Electronics for LHC and future Experiments September 2005, Heidelberg, Germany Plenary Session B5

Brookhaven Science Associates U.S. Department of Energy 2 LECC2005 OverviewOverview 1. Introduction to Cathode Strip Chambers (CSCs) 2. Amplifier shaper modules’ (ASM) pack 3. Production test setup for ASMpack 4. Production test results 5. Conclusion

Brookhaven Science Associates U.S. Department of Energy 3 LECC2005 Introduction to CSCs

Brookhaven Science Associates U.S. Department of Energy 4 LECC2005 Front end electronics facts n 2 ASM-I and 1 ASM- II make one pack n 5 ASM packs per chamber 4 x-strip (2 per side) 1 y-strip n 160 packs for the system (128 x-strip, 32 y-strip) n 192 Channels per pack (30720 total channels) HAMAC/Muon SCAs ASM-II AD9042AST ASM2MUX HDMP1022 and HDMP1024 Optical Transceivers SDX S Preamp/Shaper ASIC ASM-I

Brookhaven Science Associates U.S. Department of Energy 5 LECC2005 Signal Flow on CSC ASM-IIASM-ICSC

Brookhaven Science Associates U.S. Department of Energy 6 LECC2005 Production Test Setup

Brookhaven Science Associates U.S. Department of Energy 7 LECC2005 Labview Interface

Brookhaven Science Associates U.S. Department of Energy 8 LECC2005 Linearity

Brookhaven Science Associates U.S. Department of Energy 9 LECC2005 RMS Noise Distribution For 96 Channels

Brookhaven Science Associates U.S. Department of Energy 10 LECC2005 Representative Pedestal Distribution

Brookhaven Science Associates U.S. Department of Energy 11 LECC2005 RMS Noise in ADC count vs. Strip #

Brookhaven Science Associates U.S. Department of Energy 12 LECC2005 Mean of Maximum Amplitude ADC Count Distribution for 96 Channels

Brookhaven Science Associates U.S. Department of Energy 13 LECC2005 Reconstructed Track

Brookhaven Science Associates U.S. Department of Energy 14 LECC2005 ConclusionConclusion n Production for the front end electronics for the ATLAS CSC is complete n Testing of ASM-Packs is 91% complete n Chamber assembly is underway n We hope to ship assembled CSCs along with the front end electronics to CERN by the end of this month

Brookhaven Science Associates U.S. Department of Energy 15 LECC2005 Acknowledgements Vinnie Polychronakos Valeri Tcherniatine Vadim Gratchev Alexander Khodinov Sri Harsha Marmaraju Jack Fried Kim Ackley Ronald Ryan John Triolo Kevin Wolniewicz Ron Angona Howard Hansen

Brookhaven Science Associates U.S. Department of Energy 16 LECC2005

Brookhaven Science Associates U.S. Department of Energy 17 LECC2005 Radiation qualified COTs on ASM packs

Brookhaven Science Associates U.S. Department of Energy 18 LECC2005 ASICs on ASM Packs

Brookhaven Science Associates U.S. Department of Energy 19 LECC2005 CSC Environment

Brookhaven Science Associates U.S. Department of Energy 20 LECC2005 ASM-Pack: Front end electronics requirements

Brookhaven Science Associates U.S. Department of Energy 21 LECC2005 ASM-I: Preamplifier Shaper ASIC specifications

Brookhaven Science Associates U.S. Department of Energy 22 LECC2005 Power Distribution on ASMPack

Brookhaven Science Associates U.S. Department of Energy 23 LECC2005 Cooling of ASM pack

Brookhaven Science Associates U.S. Department of Energy 24 LECC2005 ADC Counts and fc relations n Preamp gain = 3.8mV/fc n 1700mV=2048 ADC counts n 0.83mV=1 ADC Count at the preamp n Noise in ADC Count = 2.5RMS n Noise in mV= 2.158mV n Noise in fC = 0.56fC = 3549 e-