Chapter 8 – Leveling, Cont.

Slides:



Advertisements
Similar presentations
Cross Section and Borrow Pit Methods
Advertisements

Earthwork Profile Leveling 1.
Isometric ellipses In an isometric drawing, the object is viewed at an angle, which makes circles appear as ellipses. Holes Cylinders Example object –
Road Design Basic Road Design
Applying Profiling Leveling Techniques
Section 6-3 Applications of Normal Distributions.
Wes Marshall, P.E. University of Connecticut March 2007
Profile Leveling.
Tech Ed Dept Technical Drawing Stuarts Draft High School
PSC 121 Prince George's Community College
Chapter 13 Site Plan Layout.
Geology and Surveying (Part B - Surveying) Volumes and DTMs
CE 260 SURVEYING CHAPTER 5.
You are designing the vertical alignment of an east-west portion of SR 528 through Marysville. An equal tangent crest vertical curve must go over an.
CE 453 Lesson 24 Earthwork and Mass Diagrams
Differential Leveling Mr. Conrado Agm 230. Leveling Operations The basic function of the tripod level is to provide the operator with a level line of.
First-Year Engineering Program 1 Isometric Pictorials Goals Creating an isometric sketch.
Indiana LICA Contractor Certification Training Workshop 2008 Basic Surveying Concepts.
CHAPTER 3 LEVELING.
Profile and Differential Leveling
Differential Leveling
Weights of Observations
Lesson Applying Profiling Leveling Techniques. Interest Approach Discuss with the students why producers sometimes put drainage ditches in their fields.
PROFILES CREATE STATION LABELS LABEL CENTERLINES OF DAMS, WATERWAYS, DIVERSIONS ETC. To create a profile, you must first sample the existing ground from.
Copyright © 2010, 2007, 2004 Pearson Education, Inc. All Rights Reserved. Section 6-1 Review and Preview.
Chapter (5) Leveling Introduction:
Introduction to Projections Four Basic Types
DigitalTerrainModelling: 1 Digital Terrain Model also known as –digital ground model (DGM) & –digital height model (DHM) a method of representing the.
Copyright © 2010, 2007, 2004 Pearson Education, Inc. Chapter 6 Normal Probability Distributions 6-1 Review and Preview 6-2 The Standard Normal.
Section 8.4.  The definition of a hyperbola is similar to that of an ellipse. However, this time it is the difference in the distances to the two foci,
Slide Slide 1 Lecture 6&7 CHS 221 Biostatistics Dr. Wajed Hatamleh.
How Do We Construct a Topographic profile? Objective: To accurately construct a profile along any two points on a contour map.
L15 – Spatial Interpolation – Part 1 Chapter 12. INTERPOLATION Procedure to predict values of attributes at unsampled points Why? Can’t measure all locations:
Tension & Compression Labs SMTL 246. These are the results from one of the tension labs.
Introduction to Drafting and Design
Lesson Applying Differential Leveling Techniques.
1 Applications Stream cross sections Highways Canals Sewers Water mains Sidewalks Retaining walls Fences Application of Differential Leveling Introduction.
Seventh Edition By David A. Madsen, Terence M. Shumaker, and David P. Madsen Civil Drafting Technology Chapter 12 Earthwork.
Notes Set 2. The darkness or lightness of a color. Value.
Civil Engineering Surveying Roy Frank. Planning A Survey  Planning requires a well rounded understanding of surveying practices  Process: 1. Choice.
Surveying 1 / Dr. Najeh Tamim
What is the slope of (10, 4) and (20,3)?
Orthographic Projection
Starter: y = x + 1 B) y = x – 1.
DIFFERENTIAL – PROFILE LEVELING
Profile Leveling.
Drawing Profiles.
Surveying a Level Loop Surveying a Level Loop
Contour Lines Sbmitted By: Pramit Sharma R.B.S E.T.C Bichpuri Agra.
Surveying a Level Loop Surveying a Level Loop
Surveying a Level Loop Surveying a Level Loop
Surveying a Level Loop Surveying a Level Loop
Standard Normal Calculations
Unit: Surveying Lesson: Differential Leveling
Level Loop (or Closed Circuit)
Topographic Survey Introduction „ Mapping surveys are made
Cross section It is supposed a hill has been cut vertically, then we can see the side view, or cross section of the hill A section is a slice vertically.
Topographic Survey Introduction „ Mapping surveys are made
Leveling.
Leveling.
Tachometry.
Leveling.
Section II Applications of Measurements
Leveling.
Leveling.
Orthographic Projection
Leveling.
Surveying a Level Loop Surveying a Level Loop
Leveling.
Stream Crossing Bootcamp
Presentation transcript:

Chapter 8 – Leveling, Cont. Adjustment of Circuits Precise Leveling Profile Leveling Cross-sectioning

Adjustment of Circuits Misclosure Difference between determined and known elevation Error adjusted by proportioning misclosure Proportion based on sources of errors Distance from start – better Number of set-ups

Adjustments are Cumulative Given: Misclosure = 0.05’ over 5 set-ups Assume: each set-up contributed equally Adjustment for each set-up = -Misclosure/No. of Setups = -0.05/5 = -0.01’ Adjustment to the 4th point = -0.01*4 = 0.04’

Precise Leveling Shade the level Three-wire leveling Precise Level Rods Double-rodded Lines

Profile Leveling Used in route surveys Route: definite beginning and end points Follows a baseline or center line Determine terrain along a center-line Tells you nothing about cross-section Location reference – Stationing Assign an arbitrary starting point Every 100’ is one station Sta 6+53.25 is 653.25’ from the assigned start Don’t assign start point to 0+00

Profile Leveling Elevations needed every 100’, 50’ or 25’ Rough elevations – nearest 1/10th Too many set-ups if each point is a BM Take intermediate shots – IFS Find TP at acceptable limits of sight

Profile Leveling

Profile Drawing Scales not the same: V & H Fit a smooth curve Assume: no intermediate shots means straight grade between

Cross-sectioning Determines elevations along a line perpendicular to centerline Prism glass Wing-ding Shots at pre-determined distances Rod-person chooses additional points

Cross-sectioning Notes Often laid out bottom to top Centerline appears as IFS All other shots shown on grid Reading/Distance, e.g. 3.2/16 Rod Reading = 3.2 Rod located 16’ right or left Elevations calculated from last HI

Cross-sectioning Notes

Borrow-Pit Cross Sections Lay out a grid Every 25’, 50’, etc. Use lath to find grid points Label A1, B3, etc. Shots at grid points are IFS

Borrow Pit Cross Sections