Presented by: Masoud Shams Ahmadi February 2007 Enterprise Resource Planning (ERP) Selection Presented by: Masoud Shams Ahmadi

Slides:



Advertisements
Similar presentations
Office of Purchasing and Contracts Research Funded Procurement Outreach Training Level III Procurements $50,000 and Above.
Advertisements

Project Procurement Management
Effective Request for Proposal for effective businesses
Roadmap for Sourcing Decision Review Board (DRB)
November 19, 2013 Preparing a Successful RFP to get Desired Results.
Systems Analysis and Design in a Changing World
Chapter 8: Evaluating Alternatives for Requirements, Environment, and Implementation.
Robert D. Walla, Larry A. Hacker, Ph.D. Astrix Technology Group 1090 King Georges Post Rd Edison, NJ LIMS Selection In A Forensic Toxicology Laboratory.
Introduction to Integrated Library Systems
More CMM Part Two : Details.
Government Services How to Respond to a Request for Proposal (RFP) 2006.
ECM RFP 101 Presented by: Carol Mitchell C.M. Mitchell Consulting.
Identifying and Selecting Projects
© Prentice Hall CHAPTER 10 Alternative Approach: Purchasing Systems.
Business Research Requests and Proposals
Procurement and Tendering Presentation to [NAME OF CLIENT] [YOUR NAME] [DATE]
Chapter 3 Project Initiation
IS4799 Information Systems and Cybersecurity Capstone Project
Project Bidding Procedures Enhancing Data and Presentation Skills for Engineers EDASPE Writing the RFP Training Courses – July 2004.
The System Development Life Cycle
1 Human Resource Management Systems Chapter 6: HRMS Vendors Joseph Y-W. Deng
© 2015 Cengage Learning. All Rights Reserved. May not be scanned, copied or duplicated, or posted to a publicly accessible website, in whole or in part.
© 2007 COPLAN AND COMPANY. All Rights Reserved. Permission granted for use by HIMSS membership. 1 Procurement Management Scott R. Coplan, PMP Educational.
Chapter 12: Project Procurement Management
Making Sense of the WIC EBT IAPD IAPD Session of the 2014 WIC EBT User Group Meeting July 23, :00 AM to 12:00 PM Presented by Cheryl Owens, MAXIMUS.
1 Fundamental Principles of Solution Design and Implementation Chapter 3.
Chapter 5 IT Processes Presented by Dr. Mohamed Sammouda.
Software Development Contracts and Legal Issues Cost plus Fixed price Combined.
Managing the Information Technology Resource Jerry N. Luftman
Health Informatics Series
Pertemuan Matakuliah: A0214/Audit Sistem Informasi Tahun: 2007.
8 Systems Analysis and Design in a Changing World, Fifth Edition.
Chapter 3 Project Initiation. The stages of a project  Project concept  Project proposal request  Project proposal  Project green light  Project.
Development plan and quality plan for your Project
WELCOME TO THE PROCUREMENT SEMINAR Procurement and Contracts An Overview of Contract Administration.
SDLC Phase 2: Selection Dania Bilal IS 582 Spring 2009.
Managing Project Procurement
Request For Proposal Barbara Antuna Ronald Healy Chad Hodge Andrew James Mel Ocampo.
A SOUND INVESTMENT IN SUCCESSFUL VR OUTCOMES FINANCIAL MANAGEMENT FINANCIAL MANAGEMENT.
Moving into Design SYSTEMS ANALYSIS AND DESIGN, 6 TH EDITION DENNIS, WIXOM, AND ROTH © 2015 JOHN WILEY & SONS. ALL RIGHTS RESERVED. 1 Roberta M. Roth.
12-1 Project Management from Simple to Complex This work is licensed under the Creative Commons Attribution-Noncommercial-Share Alike 3.0 Unported.
State of Maine NASACT Presentation “Using the Business Case to Guide a Transformation Procurement” 1 Using the Business Case to Guide a Transformation.
ITEC 275 Computer Networks – Switching, Routing, and WANs Week 12 Chapter 14 Robert D’Andrea Some slides provide by Priscilla Oppenheimer and used with.
Certification and Accreditation CS Phase-1: Definition Atif Sultanuddin Raja Chawat Raja Chawat.
© 2006 Cisco Systems, Inc. All rights reserved.Cisco Public 1 Version 4.0 Gathering Network Requirements Designing and Supporting Computer Networks – Chapter.
Overview Lifting the Curtain - Debriefings FAI Acquisition Seminar.
1.  Describe an overall framework for project integration management ◦ RelatIion to the other project management knowledge areas and the project life.
PUBLIC PURCHASING IN FLORIDA ROLES IN THE PURCHASING PROCESS (rev. 05/27/2008)
Research & Technology Implementation TxDOT RTI OFFICE.
Project Life Cycle – Project Initiation © Ed Green Penn State University All Rights Reserved.
© 2006 Cisco Systems, Inc. All rights reserved.Cisco Public 1 Version 4.0 Gathering Network Requirements Designing and Supporting Computer Networks – Chapter.
SDLC 1: Systems Planning and Selection Dania Bilal IS 582 Spring 2008.
U.S. Department of Agriculture eGovernment Program eDeployment Kickoff August 26, 2003.
ITEC 275 Computer Networks – Switching, Routing, and WANs Week 12 Chapter 14 Robert D’Andrea Some slides provide by Priscilla Oppenheimer and used with.
Preparing & Evaluating RFPs The PMO Role Kim Brain Senior Project Manager, Brain Works Consulting, LLC.
Evaluation. What is important??? Cost Quality Delivery Supplier Expertise Financial Stability Coverage Product Offerings Do you intend to negotiate?
Slide 1 A Practical Guide to Issuing a Request for Proposals Notes.
Project Management PTM721S
ITEC 275 Computer Networks – Switching, Routing, and WANs
Systems Analysis and Design in a Changing World, Fifth Edition
Business System Development
2 Selecting a Healthcare Information System.
Systems analysis and design, 6th edition Dennis, wixom, and roth
Systems analysis and design, 6th edition Dennis, wixom, and roth
Project Management Process Groups
1 Stadium Company Network. The Stadium Company Project Is a sports facility management company that manages a stadium. Stadium Company needs to upgrade.
Purchasing a Solution Chapter 9.
How to conduct Effective Stage-1 Audit
Project Procurement Management
Overview of The Bidder Response Form and Changes to the IT RFP Template March 8, 2019.
Presentation transcript:

Presented by: Masoud Shams Ahmadi February 2007 Enterprise Resource Planning (ERP) Selection Presented by: Masoud Shams Ahmadi February 2007

EAM Selection ERP Selection

Establish Team: –Scope of team(s) should include all work streams and IT –Deliverables: Project charter Milestone based schedule Responsibility matrix

ERP Selection Define Requirements: –Guidelines: Process maps Requirement templates other? –Deliverables: Requirements docs. RFI (optional)

ERP Selection Vendor Search: –User Groups –Use consultant knowledge –Internet –Others

ERP Selection Ranking Criteria: –Quantitative –Covers EACH requirement as well as “soft” issues: Vendor financial health Stability Longevity Referencability

ERP Selection Prepare / Issue RFP: –Technical and Functional Requirements –Client responsibility to get legal input

ERP Selection 1st Cut Assessment: –Produce initial scores from RFP results –Overall Review of Responses –Demonstration Scripts –Reduce vendor list to 3

ERP Selection Detailed Assessment: –Includes Vendor references (business) Site references (application focus) Site visits Vendor presentations Additional Vendor demonstrations –Scope to be tailored to Clients budget/Requirements –Deliverables: Annotations to proposal submissions Reference feedback / revised scoring

ERP Selection DECISION: –Process: Review latest scoring Proceed to negotiations with winner but keep runner-up in picture Conclude negotiations and advise all vendors

Factors to Consider in Selecting an ERP System FactorsQuestions Cost of technologyWhat are the start-up and recurring costs? InstallationWhat consulting assistance is offered (time, cost)? InterfacesWhat interfaces are supported? UpgradabilityWhat is the frequency of upgrades? Computing environmentWhat is the computing environment? Personnel requirementsWhat expertise is needed for design and implementation (business analysts, consultants)?

Request For Proposal (RFP)

What is an RFP? An RFP is a standard tool used to purchase equipment and services by promoting competitive proposals among suppliers. The RFP becomes a vehicle that allows both the buyer and the supplier to establish a dialogue and to work from the same set of rules, requirements, schedules, and information. The opportunity to have this dialogue is an important element in the process, because RFP requirements are often not clear and the supplier is allowed to question and interpret what is being requested. Note: Proposals are a supplier’s interpretation of an RFP’s requirements.

What is a successful RFP: A successful RFP process requires us to do the following:  Formally recognize a deficiency or need in current operations that could be resolved through the purchase of systems, equipment or services  Identify appropriate potential suppliers and solutions  Gain visibility for internal acceptance of the identified need and potential solutions  Establish the project budget  Develop a project schedule  Organize project personnel  Identify real requirements  Develop evaluation criteria (Objective)

What is a less successful RFP: A less successful process may include the following issues:  Not enough time has been allocated for the RFP process  Requirements unfairly limit the range of suppliers who may participate  Requirements are not clearly defined  Project deadlines are too short to allow suppliers to prepare proposals  The project team has not been fully educated about available technologies  A budget has not been established, or has been based on unverified data and is not sufficient for the project Note: Strong leadership, dedicated resources, and management commitment are critical to a successful RFP and a successful relationship with the chosen supplier.

What are the different types of RFPs: There are two different types of RFPs: 1.Request for Information (RFI) 2. Request for Proposal (RFP)

Request for Information (RFI): An RFI is a way for buyers to determine what is available from suppliers who respond to its requirements. It is also a way for the buyer to determine whether the requested requirements are reasonable and whether appropriate technology is available. The information from suppliers may help guide the subsequent RFP or cause it to be cancelled if suppliers do not respond. Note: An RFI is not a mandatory prerequisite to writing an RFP.

When do you consider writing RFIs: RFIs may be considered when: The technology for the project is new to the industry or your company You would like to explore a variety of potential solutions

What are the different sections of an RFP: 1.Project overview and administrative information 2.Functional and technical requirements 3.Management requirements 4.Supplier qualifications and references 5.Pricing 6.Contracts and licenses 7.Appendices

Administrative Section The first section of the RFP is the administrative section. The purpose of this section is to provide suppliers with a framework for their responses so that all proposals received, present the same information and follow the same structure.

Contents: The administrative section contains the following section: 1.Introduction and statement of the problem 2.RFP Schedule 3.Time and place to submit the proposal 4.Date of a bidders’ conference, if one is being held 5.Relevant dates for the procurement process 6.Requirements for preparing proposals 7.RFP contact names and addresses 8.Any other information suppliers may need in order to respond adequately

Requirements Section The requirements section contains the requirements for what you are buying, The requirement section is the heart of the RFP and is where suppliers should spend the most time initially.

Requirement Section Vendors will “interpret” requirements if they are not clear. Use an RFI if you can not determine whether products or services exist for your project. Note: The proposals received in response to an RFI should help you to focus on: 1.The correct technology 2.The appropriate set of suppliers

Writing Requirements There are always two parts to every requirement: 1. The requirement itself 2. The evaluation or measurement criteria We may also argue for a third criteria, which may seem obvious but is commonly overlooked. A product or service must exist in order to satisfy the requirement. 3. The requirement must be feasible

Management Section A supplier’s response to the RFP’s management section will clearly indicate whether the supplier’s company has the requisite project management skills, resources, and experience to be considered for the project. A supplier may have developed the proposed functional and technical product but lack the ability to develop and implement an effective management program.

Sections of a project management plan The project management section typically requires, but it is not limited to development of the following:  Project Plan  Site preparation plan and responsibilities  Staffing requirements  Design, development, and implementation  Delivery and installation  System acceptance test  System Maintenance  Training  Documentation

Pricing Section A successful RFP meets two basic requirements: 1 – Products or Services meet the requirements 2 - Product or Services fall within the projected budget Notes: It is critical to the evaluation of proposals to have pricing presented in a consistent format.

Management Section 1.Project implementation and management services (include supplier personnel who are on site) 2.Integration of unique hardware or software 3.Development or customization of the application 4.Installation 5.Acceptance testing 6.Maintenance 7.Training 8.Documentation 9.Project staffing 10.Facilities upgrades

Contract and License Agreements Section Most RFPs request that suppliers include a copy of the following document:  Purchase agreement  Maintenance contract  Warrant period  Software license agreement  Payment method  Nondisclosure agreement