UKI-SouthGrid Overview and Oxford Status Report Pete Gronbech SouthGrid Technical Coordinator HEPIX 2009 Umea, Sweden 26 th May 2009.

Slides:



Advertisements
Similar presentations
Southgrid Status Pete Gronbech: 21 st March 2007 GridPP 18 Glasgow.
Advertisements

Southgrid Status Pete Gronbech: 30 th August 2007 GridPP 19 Ambleside.
SouthGrid Status Pete Gronbech: 12 th March 2008 GridPP 20 Dublin.
Alastair Dewhurst, Dimitrios Zilaskos RAL Tier1 Acknowledgements: RAL Tier1 team, especially John Kelly and James Adams Maximising job throughput using.
Report of Liverpool HEP Computing during 2007 Executive Summary. Substantial and significant improvements in the local computing facilities during the.
Chris Brew RAL PPD Site Report Chris Brew SciTech/PPD.
17th October 2013Graduate Lectures1 Oxford University Particle Physics Unix Overview Pete Gronbech Senior Systems Manager and GridPP Project Manager.
Southgrid Status Pete Gronbech: 27th June 2006 GridPP 16 QMUL.
Linux Clustering A way to supercomputing. What is Cluster? A group of individual computers bundled together using hardware and software in order to make.
Wahid Bhimji Andy Washbrook And others including ECDF systems team Not a comprehensive update but what ever occurred to me yesterday.
S. Gadomski, "ATLAS computing in Geneva", journee de reflexion, 14 Sept ATLAS computing in Geneva Szymon Gadomski description of the hardware the.
SUMS Storage Requirement 250 TB fixed disk cache 130 TB annual increment for permanently on- line data 100 TB work area (not controlled by SUMS) 2 PB near-line.
Computer Room Experiences A medium sized tier-2 site view Pete Gronbech GridPP Project Manager HEPIX April 2012.
Tier-1 experience with provisioning virtualised worker nodes on demand Andrew Lahiff, Ian Collier STFC Rutherford Appleton Laboratory, Harwell Oxford,
SouthGrid Status Pete Gronbech: 4 th September 2008 GridPP 21 Swansea.
UKI-SouthGrid Overview Face-2-Face Meeting Pete Gronbech SouthGrid Technical Coordinator Oxford June 2013.
Gareth Smith RAL PPD HEP Sysman. April 2003 RAL Particle Physics Department Site Report.
Large scale data flow in local and GRID environment V.Kolosov, I.Korolko, S.Makarychev ITEP Moscow.
Southgrid Status Report Pete Gronbech: February 2005 GridPP 12 - Brunel.
ScotGrid: a Prototype Tier-2 Centre – Steve Thorn, Edinburgh University SCOTGRID: A PROTOTYPE TIER-2 CENTRE Steve Thorn Authors: A. Earl, P. Clark, S.
UKI-SouthGrid Overview and Oxford Status Report Pete Gronbech SouthGrid Technical Coordinator GridPP 24 - RHUL 15 th April 2010.
Quarterly report SouthernTier-2 Quarter P.D. Gronbech.
US ATLAS Western Tier 2 Status and Plan Wei Yang ATLAS Physics Analysis Retreat SLAC March 5, 2007.
RAL PPD Site Update and other odds and ends Chris Brew.
Southgrid Technical Meeting Pete Gronbech: 16 th March 2006 Birmingham.
David Hutchcroft on behalf of John Bland Rob Fay Steve Jones And Mike Houlden [ret.] * /.\ /..‘\ /'.‘\ /.''.'\ /.'.'.\ /'.''.'.\ ^^^[_]^^^ * /.\ /..‘\
SouthGrid Status Pete Gronbech: 2 nd April 2009 GridPP22 UCL.
INTRODUCTION The GRID Data Center at INFN Pisa hosts a big Tier2 for the CMS experiment, together with local usage from other HEP related/not related activities.
GridKa SC4 Tier2 Workshop – Sep , Warsaw Tier2 Site.
12th November 2003LHCb Software Week1 UK Computing Glenn Patrick Rutherford Appleton Laboratory.
Monitoring the Grid at local, national, and Global levels Pete Gronbech GridPP Project Manager ACAT - Brunel Sept 2011.
UKI-SouthGrid Overview and Oxford Status Report Pete Gronbech SouthGrid Technical Coordinator HEPSYSMAN RAL 30 th June 2009.
Oxford Update HEPix Pete Gronbech GridPP Project Manager October 2014.
11th Oct 2005Hepix SLAC - Oxford Site Report1 Oxford University Particle Physics Site Report Pete Gronbech Systems Manager and South Grid Technical Co-ordinator.
Lucien Boland and Sean Crosby Research Computing.
Sejong STATUS Chang Yeong CHOI CERN, ALICE LHC Computing Grid Tier-2 Workshop in Asia, 1 th December 2006.
SouthGrid SouthGrid SouthGrid is a distributed Tier 2 centre, one of four setup in the UK as part of the GridPP project. SouthGrid.
RAL Site Report Andrew Sansum e-Science Centre, CCLRC-RAL HEPiX May 2004.
Southgrid Technical Meeting Pete Gronbech: 26 th August 2005 Oxford.
2-3 April 2001HEPSYSMAN Oxford Particle Physics Site Report Pete Gronbech Systems Manager.
UKI-SouthGrid Update Hepix Pete Gronbech SouthGrid Technical Coordinator April 2012.
13th October 2011Graduate Lectures1 Oxford University Particle Physics Unix Overview Pete Gronbech Senior Systems Manager and GridPP Project Manager.
Southgrid Technical Meeting Pete Gronbech: 24 th October 2006 Cambridge.
Southgrid Technical Meeting Pete Gronbech: May 2005 Birmingham.
Oxford University Particle Physics Unix Overview Sean Brisbane Particle Physics Systems Administrator Room 661 Tel th.
14th October 2010Graduate Lectures1 Oxford University Particle Physics Unix Overview Pete Gronbech Senior Systems Manager and SouthGrid Technical Co-ordinator.
Nikhef/(SARA) tier-1 data center infrastructure
HEPSYSMAN May 2007 Oxford & SouthGrid Computing Status (Ian McArthur), Pete Gronbech May 2007 Physics IT Services PP Computing.
HEP Computing Status Sheffield University Matt Robinson Paul Hodgson Andrew Beresford.
UK Tier 1 Centre Glenn Patrick LHCb Software Week, 28 April 2006.
Oxford & SouthGrid Update HEPiX Pete Gronbech GridPP Project Manager October 2015.
CERN Computer Centre Tier SC4 Planning FZK October 20 th 2005 CERN.ch.
11th October 2012Graduate Lectures1 Oxford University Particle Physics Unix Overview Pete Gronbech Senior Systems Manager and GridPP Project Manager.
UKI-SouthGrid Overview and Oxford Status Report Pete Gronbech SouthGrid Technical Coordinator HEPSYSMAN – RAL 10 th June 2010.
RAL PPD Tier 2 (and stuff) Site Report Rob Harper HEP SysMan 30 th June
BaBar Cluster Had been unstable mainly because of failing disks Very few (
RALPP Site Report HEP Sys Man, 11 th May 2012 Rob Harper.
Network Move & Upgrade 2008 Les Cottrell SLAC for SCCS core services group Presented at the OU Admin Group Meeting August 21,
The RAL PPD Tier 2/3 Current Status and Future Plans or “Are we ready for next year?” Chris Brew PPD Christmas Lectures th December 2007.
Dominique Boutigny December 12, 2006 CC-IN2P3 a Tier-1 for W-LCG 1 st Chinese – French Workshop on LHC Physics and associated Grid Computing IHEP - Beijing.
18/12/03PPD Christmas Lectures 2003 Grid in the Department A Guide for the Uninvolved PPD Computing Group Christmas Lecture 2003 Chris Brew.
Experience of Lustre at QMUL
Pete Gronbech GridPP Project Manager April 2016
HEPiX Spring 2014 Annecy-le Vieux May Martin Bly, STFC-RAL
Oxford University Particle Physics Unix Overview
Glasgow Site Report (Group Computing)
Experience of Lustre at a Tier-2 site
Luca dell’Agnello INFN-CNAF
Oxford Site Report HEPSYSMAN
Proposal for a DØ Remote Analysis Model (DØRAM)
Presentation transcript:

UKI-SouthGrid Overview and Oxford Status Report Pete Gronbech SouthGrid Technical Coordinator HEPIX 2009 Umea, Sweden 26 th May 2009

SouthGrid Status May SouthGrid Tier 2 The UK is split into 4 geographically distributed tier 2 centres SouthGrid comprise of all the southern sites not in London New sites likely to join

SouthGrid Status May UK Tier 2 reported CPU – Historical View to present

SouthGrid Status May SouthGrid Sites Accounting as reported by APEL

SouthGrid Status May Site Upgrades in the last 6 months RALPPD Increase of 640 cores (1568KSI2K) +380TB Cambridge 32 cores (83KSI2K) + 20TB Birmingham 64 cores on pp cluster and 128 cores HPC cluster which add ~430KSI2K Bristol original cluster replaced by new quad cores systems 16 cores + increased share of the HPC cluster 53KSI2k + 44TB Oxford extra 208 cores 540KSI2K + 60TB Jet extra 120 cores 240KSI2K

SouthGrid Status May New Total Q109 SouthGrid Totals RALPPD Oxford Cambridge Bristol Birmingham EDFA-JET Storage (TB) CPU (kSI2K) GridPP % of MoU CPU% of MoU Disk %142.86% 96.77%343.75% %230.77% %363.64% %374.56% %314.31%

SouthGrid Status May Site Setup Summary SiteCluster/sInstallation Method Batch System BirminghamDedicated & Shared HPCPXE, Kickstart, CFEngine. Tarball for HPC Torque BristolSmall Dedicated & Shared HPC PXE, Kickstart, CFEngine. Tarball for HPC Torque CambridgeDedicatedPXE, Kickstart, custom scripts Condor JETDedicatedKickstart, custom scripts Torque OxfordDedicatedPXE, Kickstart, CFEngine Torque RAL PPDDedicatedPXE, Kickstart, CFEngine Torque

SouthGrid Status May Oxford Central Physics Centrally supported Windows XP desktops (~500) Physics wide Exchange Server for –BES to support Blackberries Network services for MAC OSX –Astro converted entirely to Central Physics IT services (120 OSX systems) –Started experimenting with Xgrid Media services –Photocopiers/printers replaced – much lower costs than other departmental printers. Network –Network is too large. Looking to divide into smaller pieces – better management and easier to scale to higher performance. –Wireless – introduced EDUROAM on all physics WLAN base stations. –Identified problems with 3com 4200G switch which caused a few connections to run very slowly. Now fixed. –Improved network core and computer room with redundant pairs of 3com 5500 switches.

SouthGrid Status May Oxford Tier 2 Report Major Upgrade 2007 Lack of decent Computer room with adequate power and A/C held back upgrading our 2004 kit until Autumn systems, 22 servers, 44 cpus, 176 cores. Intel 5345 Clovertown cpu’s provide ~430KSI2K, 16GB memory for each server. Each server has a 500GB SATA HD with IPMI remote KVM cards. 11 servers each providing 9TB usable storage after RAID 6, total ~99TB, 3ware ML controller. Two racks, 4 Redundant Management Nodes, 4 APC 7953 PDU’s, 4 UPS’s

SouthGrid Status May Oxford Physics now has two Computer Rooms Oxford’s Grid Cluster initially housed in the departmental Computer room late 2007 Later moved to the new shared University room at Begbroke (5 miles up the road)

SouthGrid Status May Oxford Upgrade systems, 26 servers, 52 cpus, 208 cores. Intel 5420 Harpertown cpu’s provide ~540KSI2K, 16GB Low Voltage FBDIMM memory for each server. Each server has a 500GB SATA HD. 3 servers each providing 20TB usable storage after RAID 6, total ~60TB, Areca Controllers More of the same but better!

SouthGrid Status May Nov 2008 Upgrade to the Oxford Grid Cluster at Begbroke Science Park

SouthGrid Status May Newer generation Intel Quads take less power Tested using one cpuburn process per core on both sides of a twin killing a process every 5 minutes. Electrical Power consumption Busy 645W Idle 410W Busy 490W Idle 320W Intel 5345 Intel 5420

SouthGrid Status May Electricity Costs* We have to pay for the electricity used at the Begbroke Computer Room: Cost in electricity to run old (4 years) Dell nodes is ~£8600 per year. (~79 KSI2k) Replacement cost in new twins is ~£6600 with electricity cost of ~£1100 per year. So saving of ~£900 in the first year and £7500 per year there after. Conclusion is, its not economically viable to run kit older than 4 years. * Jan 2008 figures

SouthGrid Status May IT related power saving Shutting down desktops when idle –Must be idle, logged off, no shared printers or disks, no remote access etc. –140 machines regularly shut down –Automatic power up early in the morning to apply patches and get ready for user (using Wake-On-LAN) Old cluster nodes removed/replaced with more efficient servers Virtualisation reduces number of servers and power. Computer room temperatures raised to improve A/C efficiency (from 19C to 23-25C) Windows 2008 server allows control of new power saving options on more modern desktop systems

SouthGrid Status May CPU Benchmarking HEPSPEC06 hostnamecpu typememoryno of coreshepspec06hepspec06/core node102.4GHZ zeon4GB273.5 node102..4GHz4GB t2wn61E GHz16GB pplxwn16E GHz16GB pplxint3E GHZ16GB These figures match closely with those published on

SouthGrid Status May Roughly equal share between LHCb and ATLAS for CPU hours. ATLAS runs many short jobs. LHCb longer jobs. Cluster occupancy approx 70% so still room for more jobs. Local contribution To Atlas MC storage Cluster Usage at Oxford

SouthGrid Status May In out Oxford recently had its network link rate capped to 100mbs This was as a result of continuous mbs traffic caused by CMS commissioning stress testing. As it happens this test completed at the same time as we were capped, so we passed the test, and current normal use is not expected to be this high Oxfords Janet link is actually 2 * 1gbit links which had become saturated. Short term solution is to only rate cap JANET traffic to 200mbs which doesn’t impact on normal working (for now) all other on site traffic remains at 1gbs. Long term plan is to upgrade the JANET link to 10gbs within the year. 200mbps

SouthGrid Status May gridppnagios Have setup a nagios monitoring site for the UK which several other sites use to get advanced warnings of failures. idServiceMonitoringInfo idServiceMonitoringInfo

SouthGrid Status May The End But Since some of you may remember my old pictures of computer rooms with parquet floor and computers running in basements without A/C Some pictures showing the building of Oxford Physics Local Infrastructure computer room.

SouthGrid Status May Local Oxford DWB Computer room Completely separate from the Begroke Science park a computer room with 100KW cooling and >200KW power is being built. ~£150K Oxford Physics Money. Local Physics department Infrastructure. Was completed Sept This will relieve local computer rooms and house T2 equipment until the Begbroke room is ready. Racks that are currently in unsuitable locations can be re housed.