Hall C Meeting SHMS Magnets and Support Structure Design and Procurement Status Paul Brindza January 26, 2009.

Slides:



Advertisements
Similar presentations
Q1 for JLAB’s 12 Gev/c Super High Momentum Spectrometer S.R. Lassiter, P.B. Brindza, M. J. Fowler, S.R. Milward, P. Penfold, R. Locke Q1 SHMS HMS Q2 Q3.
Advertisements

Hall C SHMS Fringe Field Analysis Michael Moore Hall C Winter Meeting
A.KOVALENKO SUPERCONDUCTING MAGNETS for NICA BOOSTER & COLLIDER NICA ROUND TABLE DISCUSSION - 3 JINR, Dubna, November 05, 2008.
Thomas Jefferson National Accelerator Facility Pg. 1 SHMS Status Hall C Users Feb Paul Brindza.
GlueX Solenoid Recent progress and Coil cold tests Paul Brindza September 9, 2004.
SHMS Design, Engineering & Construction Status for Hall C Users meeting Paul Brindza January 2010.
Quadrupole Magnetic Design for an Electron Ion Collider Paul Brindza May 19, 2008.
CEA DSM Irfu - Bernard GASTINEAU - R3B Technical Board Meeting -April 4, Reactions with Relativistic Radioactive ions Beams GSI Large Acceptance.
MICE Video Meeting, 10 Jan 081 Spectrometer Magnet Progress Michael A. Green Lawrence Berkeley Laboratory.
Tagger and Vacuum Chamber Design. Outline. Design considerations. Stresses and deformations. Mechanical assembly.
Tagger and Vacuum Chamber Design. Outline. Design considerations. Stresses and deformations. Mechanical assembly.
T. Horn, SHMS Optics Update SHMS Optics Update Tanja Horn Hall C Users Meeting 31 January 2009.
ILC Main Linac Superconducting Cryogen Free Splittable Quadrupole Progress Report V. Kashikhin for Superconducting Magnet Team.
April 24, 2008 FNAL ILC SCRF Meeting 1 Main Linac Superconducting Quadrupole V. Kashikhin, T. Fernando, J. DiMarco, G. Velev.
Superconducting Large Bore Sextupole for ILC
GlueX Solenoid Update George Biallas May 12, 2010 GlueX Collaboration Meeting.
1 Warm Magnets Work Package Status J. Bauche, TE-MSC Technical Meeting, 9th January 2014.
1 M. Modena for the CLIC MDI magnet study Team (A. Aloev, P. Thonet, E. Solodko, A. Vorozhtsov) CLIC MDI Meeting,16 January 2015.
Magnet designs for Super-FRS and CR
MQXF Cold-mass Assembly and Cryostating H. Prin, D. Duarte Ramos, P. Ferracin, P. Fessia 4 th Joint HiLumi LHC-LARP Annual Meeting November 17-21, 2014.
WBS1 SBS Basic: Magnet and Infrastructure Robin Wines 11/4/ SBS DOE Review.
UVA Polarized Target In Hall A Pictures and Cost Paul Brindza Dec 17, 2009.
Hypernuclear Physics in Hall A E Status John J. LeRose December 16, 2009.
ATF2 quads status 22Nov05- Cherrill Spencer 1 Status Report on the Design and Fabrication of 29 quads for ATF2 By Cherrill Spencer, SLAC, for ILC-BDS weekly.
SHMS Optics Studies Tanja Horn JLab JLab Hall C meeting 18 January 2008.
11 T Nb3Sn Demonstrator Dipole R&D Strategy and Status
1 Tim Michalski October 6, 2015 Engineering Issues in MEIC.
GlueX Collaboration Meeting. Jefferson Lab. September 9 – 11, Review of Tagger System.
MICE Status & Plans MICE-UK paul drumm 15 th September 2004.
CEA DSM Dapnia DIRAC-Phase-1 Annual Report meeting Status of the R3B-GLAD Magnet DIRAC-Phase-1 Annual Report Meeting 26 September 2006 Bernard Gastineau.
SHMS Spectrometer Update Hall C 2008 Users Meeting Paul Brindza January 18, 2008.
The Cosine Two Theta Quadrupole Magnets for the Jefferson Lab Super High Momentum Spectrometer (SHMS). P.B. Brindza, S.R. Lassiter M. J. Fowler Abstract—
SBS Magnet and Infrastructure Status Robin Wines July 2015.
22 October 2005MICE Meeting at RAL1 Tracker Solenoid Overview Michael A. Green Lawrence Berkeley Laboratory MICE Collaboration Meeting 22 October 2005.
PREX Mtg, July 2008R. Michaels, JLAB Warm Septum : Status Septum Team: Kees deJager, Paul Brindza, Javier Gomez, John Lerose, Al Gavalya, & me New Design.
SBS Magnet and Support Status Robin Wines June 2013.
Hall C - 12 GeV pCDR Max. Central Momentum 11 GeV/c 9 GeV/c Min. Scattering Angle 5.5 deg 10 deg Momentum Resolution.15% -.2% Solid Angle 2.1 msr 4.4 msr.
Philip Schwarz TE-MSC-MNC 1 Engineering Specifications for ELENA ring and TL magnets Philip Schwarz on behalf of WP 2.2 ELENA IIC meeting 5 th December.
MICE Coupling Coil Update Allan DeMello Lawrence Berkeley National Laboratory Illinois Institute of Technology June 17, 2013 June 17, 2013.
Super Fragment Separator (Super-FRS) Machine and Magnets H. Leibrock, GSI Darmstadt Review on Cryogenics, February 27th, 2012, GSI Darmstadt.
Superconducting Cryogen Free Splittable Quadrupole for Linear Accelerators Progress Report V. Kashikhin for the FNAL Superconducting Magnet Team (presented.
SuperB Meeting XVII May 28 – June 2, 2011 IR design status 1 IR Design Status and Update M. Sullivan For M. Boscolo, K. Bertsche, E. Paoloni, S. Bettoni,
Tagger and Vacuum Chamber Design Jim Kellie Glasgow University.
GSI Helmholtzzentrum für Schwerionenforschung GmbH Super-FRS multiplet field.
GSI Helmholtzzentrum für Schwerionenforschung GmbH Super-FRS magnet configurations.
Neutral Particle Sweeper Magnet Paul Brindza Nov 17, 2014.
CERN, 11th November 2011 Hi-lumi meeting
12-GeV Upgrade of Hall-C: Project Scope and Status
Interaction Region and Detector
CBM magnet overview of the BINP work
SLHC –PP WP6 LHC IR Upgrade - Phase I.
Main magnets for PERLE Test Facility
Introduction to the technical content The Q4 magnet (MQYY) for HL-LHC
The 11T cryo-assembly: summary of design and integration aspects
DOE/SC Status Review of 12 GeV SHMS HB Magnet: Update since Oct 2015
SoLID Magnet - Engineering and Cost
Status of the PANDA Solenoid Magnet Production in BINP
Potential Use of PEP-II Magnets by Project X
HRS at small angles for e+/ e- pair for APEX
SHMS Q2 with Beam Line Shield Pipe
P.Fabbricatore & S.Farinon
Updated concept of the CBM dipole magnet
Hall C SHMS & Configuration Status
Status of the PANDA Solenoid Magnet Production in BINP
as a prototype for Super c-tau factory
Hall C SHMS & Configuration Status
JLEIC Engineering Status
IR Beam Transport Status
IR Magnet Design and Engineering Considerations
JLEIC Magnet R&D Tim Michalski NP Community Panel Review of the EIC
Presentation transcript:

Hall C Meeting SHMS Magnets and Support Structure Design and Procurement Status Paul Brindza January 26, 2009

SHMS Magnets and Support Structure SHMS Spectrometer and Magnets SC Magnet Procurement Status SHMS Magnet Recent Progress SHMS Support Structure Conclusions

SHMS TargetBenderQ1Q2Q3DipoleDetectors Electronics Room Cryo Transfer Line Power Supplies Shield House

SHMS Q1 Quadrupole Assembly JLAB Cold Iron Quad Design (CIQ) SHMS Horizontal Bend Dipole Warm Iron SC “C” Magnet SHMS Q3 Cosine 2Θ Quadrupole Assembly 60 cm warm bore cryo-stable design SHMS Cosine Θ Dipole Assembly 60 cm warm bore- cryo-stable design

Bo/GoApertureJ A/cm^2 Design HB3.10 T35 x 3628,900“C” Type Super Ferric Q110.6 T/m 40 cm23,430JLAB Q1 Cold Iron Q T/m 60 cm 5,800 Cosine (2 Θ ) Dip4.76 T 60 cm 5,000Cosine (Θ) SHMS Magnet Designs

I (A)L (H)E (MJ)Wt. HB t Q t Q t Dip t SHMS Magnets Stored Energy & Weight

SHMS Requirements from Optics and SC Magnet Design Margin MagnetOptics at 11GeV/c Design Maximum Design Margin HB dipole TM % Q1 Quad (T/M)M % Q2 Quad (T/M)M % Q3 Quad (T/M)M % Dipole TM %

SHMS SC Magnet Procurement Strategy SC Magnets will be built by contractors In a significant departure from HMS we will provide major SC magnet components – Superconductor (SSC surplus) – Cryo-Control Reservoir( same as HMS Design) – DC Power System( same as HMS) – Magnet Control System( Same as HMS) – Warm Yoke Steel

Cryogenic Control Reservoir Fabricated Cryostated Magnet RFP Fixed Price Procurement Conductor Processing Testing SC Cable DC Power System Magnet Control System Ship to JLAB On Site Integration & Assembly Acceptance Testing Magnet Support & Alignment Warm Iron Yoke SHMS SC Magnet System Plan

Procurement Status of SHMS Magnets Q1 Magnet bids under evaluation- don’t ask/don’t tell Q1 Award plan date is March 15, 2009 Q2Q3 & Dipole RFP released Jan 26, 2009 Q2Q3D Bids due May 2009, Award Dec HB magnet design review Feb. 10, 2009 MOU/Contract with NSCL ~ June 2009

Horizontal Bend Design by NSCL/MSU Warm Iron SC “C” Magnet

HB Coil Drawing and 3D CAD of Winding Tooling

HB Coil Winding Tooling

1 st Full HB Coil – 90 Turns

Q1 Quad 3D CAD Model Cold Iron Quad Design like HMS Q1 Bids are IN!!

Q1 Coil winding at SMI

First Phase II Q1 Coil

Q1 Coil Tests

SHMS Support Structure

Mechanical Requirements SHMS Minimum Scattering Angle 5.5 degrees SHMS-HMS angle = 17.5 degrees HMS Minimum Angle (present) 10.5 degrees SHMS Max angle 40 degrees HMS Max Angle(present ) 85 degrees Hall C Radius at SHMS max 73 feet Fit to beam pipe at 5.5 degrees ~ 5 mm Fit to HMS at 17.5 degrees ~ 1 cm

SHMS Support Structure Reference Design SHMS Support Structure Preliminary Design completed in 2007 by ALION, a local company with experience in large welded steel structures SHMS Support Structure Reference Design(RD) Completed by ALION January 28, 2009 RD will be the technical elements for the bid packages for the SHMS support structure. SHMS Support Structure RD review was held in December 08 at JLAB

SHMS General Arrangement

SHMS Support Cross Sections

SHMS Structure Preliminary Assembly Plan

Top View SHMS & HMS Spectrometers Bender Q1 Q2 Q3 Dipole Target Beamline HMS Spectrometer

Bottom View HMS SHMS Beamline stands SHMS wraps around front of HMS

Bender fit up to HMS Q1 Bender HMS Q1

Q3 & Dipole fit up Beamline Stand SHMS Q3 SHMS Dipole 24” Beamline Q2 Shield House notch

Shield House fit up Shield House Beamline Shield House notch Dipole Q3 Q2 Q1 Bender

Conclusions SHMS SC Magnet designs are sound, reviewed and procurement has started JLAB is a partner in the SHMS Magnet fabrication Superconductor, Cryogenic Interface, Iron Yokes DC systems and PLC based controls. SHMS Support Structure Reference Design is complete detail design and fabrication begins FY10 Since we haven’t spent a dime yet We are still On time and On budget!!