Practical Integrated Development Integrated development concepts. Terry Manning NGO Stichting Bakens Verzet (Another Way)

Slides:



Advertisements
Similar presentations
Green Economy Scoping Study for Barbados: Honing Enabling Mechanisms for Advancing a Green Economic Agenda Prepared for: The Government of Barbados Prepared.
Advertisements

NGO STICHTING BAKENS VERZET (ANOTHER WAY) NETHERLANDS MODEL FOR SELF-FINANCING, ECOLOGICAL, SUSTAINABLE, LOCAL INTEGRATED DEVELOPMENT PROJECTS Part Three.
Depository Institutions
Meaning & Definition In literal sense the word business means, ‘ the state of being busy’ “Business is an activity which involves exchange of goods or.
The CDM: a review of its development and status of the carbon markets Dr. Oscar Coto II National CDM Workshop Belize August 2011.
Welcome to a world of expertise Renewable Heating Solutions Jamie Boyd Sales Manager - Renewables & Installed Heating Glen Dimplex Northern Ireland.
© Family Economics & Financial Education – Revised November 2004 – Saving Unit – Managing Your Cash Funded by a grant from Take Charge America, Inc. to.
1/16 LECTURE INTRODUCTION TO MICROFINANCE May 6th, 2009 Emilie Levy, Executive Director.
1. Is a challenging task Requires a great amount of work and time Involves numerous steps, which include*: 2 – write a business plan – obtain business.
Ethic financing and social investment A European overview INAISE : International Association of Investors in the social Economy.
EBRD Support for Renewable Energy and Energy Efficiency projects Ian Brown Power & Energy Utilities Team Pristina, 14 May 2013.
 In order to stay competitive in today’s marketplace, banks and other financial institutions have expanded the range of services that they offer.  Four.
Chapter Outline A Typical Foreign Exchange Transaction Forfaiting
Copyright © 2007 by The McGraw-Hill Companies, Inc. All rights reserved INTERNATIONAL FINANCIAL MANAGEMENT EUN / RESNICK Fourth Edition.
Massimiliano Di Pace1 EU TRADE POLICY Eu provides also initiatives, financing and services to support Eu companies’ efforts for internationalisation The.
Personal Finance Benchmark Demonstrate an understand that personal spending, saving, and credit decisions have significant implications for the.
NGO STICHTING BAKENS VERZET (“ANOTHER WAY”) NETHERLANDS MODEL FOR SELF-FINANCING, ECOLOGICAL, SUSTAINABLE, LOCAL INTEGRATED DEVELOPMENT PROJECTS Part One.
Regional Seminar on Developing a Program for the Implementation of the 2008 SNA and Supporting Statistics Murat EKŞİ September 2013 Ankara - Turkey.
Savings Tools Take Charge of Your Finances Family Economics & Financial Education.
1.4 Financial Sector Trends: Cameroon AgriFin encourages use and distribution of its publications. Content from this toolkit may be used freely and copied.
© Family Economics & Financial Education – Revised April 2008– Saving Unit – Managing Your Cash Funded by a grant from Take Charge America, Inc. to the.
Economic Development and Transition
Money and Banking Lecture 02.
SUCCESS STORY OF THE POLISH CREDIT UNION MOVEMENT How to reach 1 million Members in 12 years Grzegorz Bierecki, President National Association of Cooperative.
Lightweight Energy Panels Africa presents Building Communities Changing Atmospheres.
Carbon Finance and Opportunities in Africa Patrick Karani BEA International.
First Discussion of Climate Change Steering Committee Recommendations to COG Board of Directors Agenda Item #6 February 27, 2008.
SESSION 3: Climate Change Financing Opportunities.
Green Finance in SMEs Nataliya Mylenko World Bank July 6,
How Can the Institutional Setup Improve Transparency and Governance of Enforcement Donald Macrae, WBG Consultant Inspection Reform Conference, Amman, 3.
RENTING VS. OWNING FAMILY ECONOMICS AND FINANCIAL EDUCATION TAKE CHARGE OF YOUR FINANCES.
NGO STICHTING BAKENS VERZET (“ANOTHER WAY”) NETHERLANDS MODEL FOR SELF-FINANCING, ECOLOGICAL, SUSTAINABLE, LOCAL INTEGRATED DEVELOPMENT PROJECTS Part Two.
Entrepreneurship & Small Business Management 10/2/
Batyr Ballyev, Head, Environment Protection Department, the Ministry of Nature Protection of Turkmenistan Climate Change-Related Priorities & Needs.
Entrepreneurship Overview of Cash flow Entrepreneurship Agenda Business Plan Presentation Financials –Cash Flow –Notes on Forecasting (REVENUE) and Developing.
© Family Economics & Financial Education – Revised April 2008– Saving Unit – Managing Your Cash Funded by a grant from Take Charge America, Inc. to the.
FUNDING SOCIAL POLICY. CENTRAL GOVERNMENT A large part of Central Governments funding is derived from Income Tax, VAT and National Insurance. Most individuals.
Financing climate-friendly projects in the Balkan region DAC PROJECT CAPACITY BUILDING IN BALKAN COUNTRIES IN ORDER TO DEAL WITH CLIMATE CHANGE Prepared.
You can BANK on it!. Objectives STUDENTS WILL BE ABLE TO: Understand the different types of financial institutions Calculate how long it will take to.
Welcome. The legal framework of CDM - UNFCCC, at Rio de Janeiro Earth Summit, Kyoto protocol, CDM, Parties and Benefits Basic requirements.
© Family Economics & Financial Education – Revised November 2004 – Saving Unit – Managing Your Cash Funded by a grant from Take Charge America, Inc. to.
APEC ENERGY WORKING GROUP FRAMEWORK PROPOSAL FOR IMPLEMENTING ENERGY INVESTMENT RECOMMENDATIONS (November 2004).
Overview of Integrated Solid Waste Management (ISWM) Presentation made at the European Commission 7 th Framework Programme on Capacity Building Workshop.
© ESD 2003 IRIS KYOTO Achieving Carbon Finance: Carbon Funds and key issues (Including European Emissions Trading Scheme) Jeremy Doyle ESD, UK European.
International Economics Developing Countries Organizations of International Economy.
Mounir BENHAMMOU Director of Administrative and Financial Department Secretariat General of the Arab Maghreb Union EN/CSC2/2014/Pres/05.
Using money wisely and effectively to meet your obligations and priorities.
Copyright 2010, The World Bank Group. All Rights Reserved. 1 GOVERNMENT FINANCE STATISTICS EXPENSE Part 1 This lecture presents the detailed categories.
The Green Climate Fund: Challenges and Opportunities Some thoughts on how the Green Climate Fund could close the Energy Justice gap Martin Hiller, Energy.
Chapter Seventeen The American Economy The Economic System ~~~~~ Making Business Decisions.
1 APEC SEMINAR ON THE EARTHQUAKE DISASTER MANAGEMENT OF ENERGY SUPPLY SYSTEMS A PROPOSED CO-OPERATION MECHANISM by Tan Pham September 2003 Chief Executive.
Managing Your Money Chapter 23.
Training Workshop on Development of Core Statistical indicators for ICTs Tunisian Experience in ICT indicators Collection. Tunisian presentation June 2005.
Unit 1: What is economics all ABOUT? Chapters 1-6.
SEE Energy Poverty Nexus Aleksandar Kovacevic. 2 Concept of Affordable Energy compromises: Total social costs of energy that could be covered by productivity.
Unit 3 Economics Practical Economics: Credit, Debt, Loans, & Investing.
Section 5.1.  Identify types of financial services  Describe the various types of financial services.
3 - 1 Introduction to Health Care HS230 Health Care Administration Kaplan University Unit 3 Chapter 3 & Chapter 4 Kathy Lantz, MHS, MBA.
Chapter 14SectionMain Menu Taxes –Primary way that the government collects money. –Without revenue, or income from taxes, government would not be able.
Housing Deciding between Renting and Owning a House.
Savings Tools Take Charge of Your Finances Family Economics & Financial Education.
Policy Tools: Correcting Market Failures. What are the most serious problems we face? Climate change Agricultural production Peak oil Water supply Biodiversity.
GRAMEEN in the UK Set up, mission and future development Background
7th International Scientific Conference on Energy and Climate Change
Take Charge of Your Finances Family Economics & Financial Education
Makala: the necessary evil
UNDERSTANDING FINANCIAL ECOSYSTEM AND MICROFINANCE
Users’ needs and practices
Users’ needs and practices
Presentation transcript:

Practical Integrated Development Integrated development concepts. Terry Manning NGO Stichting Bakens Verzet (Another Way)

Summary 1. About integrated development. 2. Project structures. 3. Costs and benefits.

1. About integrated development. 1.1 Development of structures. 1.2 Purpose. 1.3 Mobilisation of local populations. 1.4 The three project levels. 1.5 Schematic view of a project area. 1.6 Schematic view of a regional project. 1.7 Division of tasks at each level.

1.1 Development of structures. It’s all about structures. “Reform is not an event, it is a process.” (Kofi Annan, report of the Secretary-General to the United Nations Assembly A/51/ July, 1997, par. 25) Once the proposed enabling social, financial, productive and service structures are in place in each project area, the local populations possess instruments enabling them to decide for themselves what they want to do. Integrated development involves a structural reform process. Traditional aid projects try to provide solutions to specific problems. They are not holistic.

1.2 Purpose of integrated development projects. Purpose : to create a cooperative, interest-free, inflation-free local economic environment in each project area where private initiative and genuine competition are free to flourish. FINANCIAL LEAKAGE OUT OF PROJECT AREAS IS BLOCKED

1.3 Mobilisation of local populations. The local people themselves plan, execute, run, manage and pay for all structures. run, manage and pay for all structures. They are assisted during the initial project execution period by a (very) small team of experts led by a local project coordinator. experts led by a local project coordinator. Each structure operates autonomously at each level in its own way and its own speed. each level in its own way and its own speed. Basic activities and duties are common to all like structures.

1.4 The three levels of structures. Three levels (in addition to individual families): Basic level : tank commission. (50 famililes – 250 persons – anthropological justification : Extended family : developed in Mesopotamia about years ago. Intermediate level : well commission. (350 families – persons – anthropological justification : Groups of clans with chief and a first level of specialisation of activities, developed about years ago. Project level. ( families – persons – anthropological justification : Greek city-state with advanced specialisation of activities : formed about years ago. Level of self-sufficiency (Aristotle).

1.5 Schematic view of a project area. Project level ( people) Well-commission level (1.500 people) Tank-commission level (250 people) One per project About 35/project About 200/project Numbers are rarely critical NGO Stichting Bakens Verzet Netherlands

The subsidiarity principle always applies. Tank commissions Well commissions Project level Tank commissions Well commissions Project level Health clubs/hygiene education Management of well sites Supervision and statistics Health clubs/hygiene education Management of well sites Supervision and statistics Drinking water Drinking water supply back-up Maintenance & statistics Drinking water Drinking water supply back-up Maintenance & statistics Family sanitation Washing places Training for housewives Family sanitation Washing places Training for housewives Rainwater harvesting Water sampling Water testing Rainwater harvesting Water sampling Water testing Local money assistants Registration local money Local money statistics Local money assistants Registration local money Local money statistics transactions Inter-project relations transactions Inter-project relations Collection of contributions Conflict resolution Collection of contributions Conflict resolution Collection of loan repayments Conflict resolution Collection of loan repayments Conflict resolution About 60% of micro-credit grants About 25% micro-credits About 15% of grants About 60% of micro-credit grants About 25% micro-credits About 15% of grants First-level social safety net Second level social safety net Project-level safety net First-level social safety net Second level social safety net Project-level safety net Production bio-mass for local use Production of mini-briquettes Statistics Production bio-mass for local use Production of mini-briquettes Statistics Nurse Doctor Local hsopital Nurse Doctor Local hsopital Primary school Secondary school Trade schools, Primary school Secondary school Trade schools, propadeuse for University propadeuse for University Lighting for study purposes Radio-telephone links Local radio station Lighting for study purposes Radio-telephone links Local radio station Sports clubs Intermediate facilities Project level competition Sports clubs Intermediate facilities Project level competition Theatres, cultural groups Physical Facilities Cultural circuits Theatres, cultural groups Physical Facilities Cultural circuits Personal food storage facility Cooperative food storage Export/import cooperatives Personal food storage facility Cooperative food storage Export/import cooperatives 1.7 Project structures at each level. (A few typical examples)

2. Typical project structures for each project area. Project structures are set up in a critical order of sequence : First the 2.1 SOCIAL STRUCTURES Then the 2.2 FINANCIAL STRUCTURES Then the 2.3 PRODUCTIVE STRUCTURES Finally the 2.4 SERVICE STRUCTURES

2.1 Typical social structures. in sequential order of formation: Health clubs Tank commissions Well commissions Central committee Three tiered social security structure.

2.2 The financial structures. In sequential order of formation. First the Local exchange system structures. Then the : Interest-free micro-credit structures. Then the : Cooperative purchasing groups.

2.2.1 The local money structures. (Dia. 1) They operate at 3 levels : Basic level (water point) : local helper. Intermediate, well commission level : registration of transactions. Project, level: statistics, management.

2.2.1 Local exchange system structures. (Dia. 2) The system is based on the perceived value of one hour’s work. Everyone starts with, say, 500 points (50 hours’ work). Credit and debit system : the sum of every transaction is always zero. The local money system is complementary : Users are always free to choose whether they want to use the local money system or the formal money one.

2.2.1 The local money structures. (Dia. 3)

2.2.2 The interest-free micro-credit system. (Dia. 1) No formal money costs. (The system operates under the local money system.) The system provides each family of 5 with at least €1500 of interest-free, cost-free finance for productive development in each 10 year period of activities. The system operates at three levels. The self-financed cooperative local development fund is owned and operated by the local populations themselves. At the close of the first ten year cycle of project activities, the amount in the fund should be enough to re-imburse the initial capital investment in the project should this be required.

2.2.2 Micro-credit structures: (Dia. 2) Illustration of typical development over ten years. (Each family receives at least Euro 1500 based on an average 2 year payback period)

2.2.3 Cooperative purchasing groups. The groups can operate act any or all of the three project administrtive levels. They can be voluntary of compulsory, at the choice of the local populations. Examples: Insurance coopératives. Purchase of photovoltaic home systems. Selfterminating buying cooperatives. Cooperatives for the purchase of medicines. Project structures provide free administrative support to the groups within the framework of the local exchange (LETS) systems set up.

2.2.4 Financing projects via the CDM mechanism of the Kyoto Protocol. METHOD. a) Set up a menu of 13 programmes of activities (PoA) at a project or dominant level. One application of the menu for each individual integrated development project. The methodologies chosen for any given project make up a sub-programme of activities (sub-PoA). b) Apply the sub-programme of activities to the individual project applications per project for te improved stoves methodology. One or two reforestation applications. 200 applications for forestation initiative in inhabited areas. 200 applications for the use of bamboo. Etc. (See table The market for CER certificates has collapsed. Financing via the CDM mechanism is no longer a practical proposition at this time.

2.2.5 Green fund for Adaptation to Climate Change Green fund for Adaptation to Climate Change. New fund in formation for management under the United Nations Framework Convention on Climate Change. (UNFCCC). Projects automatically cover nearly all of the actions recommended for the project area concerned. The national government can include integrated projects in its national plan for adaptation to climate change.

2.3 Summary of the productive structures provided by each project. Units for the manufacture of items from gypsum- based composites. Production of mini-briquettes for cooking purposes. Production of biomass for mini-briquettes. Cooperatives for installation and maintenance. Others, too many to name, in the minds of the people.

2.4 Summary of the service structures provided. (Dia. 1) 2.4 Summary of the service structures provided. (Dia. 1) Water : solar powered distributed drinking water systems at +/- 200 water points; triple manual backup hand-pump systems at +/- 40 boreholes/wells; rainwater harvesting systems at household level. Sanitation : dry composting ecological sanitary systems for each of households, and at schools, clinics and public places. Waste recycling system : Complete system at three levels for the productive recycling of waste. Photovoltaic lighting systems.

2.4 Summary of the service structures provided. (Dia.2) 2.4 Summary of the service structures provided. (Dia.2) Improved high-efficiency cook-stoves (elimination of risks associated with smoke). Education : as required. Up to 200 primary schools; 40 secondary schools; 1 trades school; 1 institute for first year university studies; 200 study rooms with photovoltaic lighting. Health : as required. Up to 200 nursing units; 40 doctors’ surgeries with medicine distribution points; 1 local hospital; bicycle ambulance system. Formal money cooperative purchasing groups for medicines. Cooperative formal money health insurance system.

2.4 : Summary of the service structures provided. (Dia. 3)

3. Costs and benefits. 3.1 Costs. 3.2 Benefits.

3.1 Costs. (Dia 1) The entire package of integrated development structures costs only €176 per person. Of that, 42% is provided by the local populations themselves in the form of work carried out under the local exchange (LETS) systems created to set the project structures up. Initial formal capital (58% of the total) can, if necessary, take the form of an interest-free development loan for a period of ten years. The repayable amount is collected in each project’s cooperative local development fund over the first ten-year period of activities, and is repeatedly recycled during that period for interest-free cost-free micro-credit loans.

3.1 Costs. (Dia. 2) Project costs can in princple be covered: As a first line : By the capital deposited in each project’s cooperative local development fund during the first ten-year period of project activities. In the meantime the funds are used to finance interest-free, cost-free micro-credits for productive purposes. And as a second line : Through the Adaptation Commission and the Green Fund for Climate Adaptation To be set up Following the Conférences of Cancùn (2010) and Durban (2011). (Projects cover a full range of climate adaptation measures). And, eventually as a third line: By the application of a menu of 13 methodologies for the reduction of CO2 emissions and the creation of CO2 sinks under the terms of the Kyoto Protocol. (This was originally the primary way of financing the projects but the bottom has fallen out of the CO2 market and compliance costs are now higher than the benefits.)

3.2 Benefits (Dia. 1) Once the project structures are in place, the annual benefits of each project are greater than the investment capital. Annual savings on the costs of food currently imported into project areas alone amount to nearly 90% of the investment costs. Interest saved on micro-credits conceded amounts to € to € per year depending on the assumed average interest rate taken into account.

NGO STICHTING BAKENS VERZET (“ANOTHER WAY”) NETHERLANDS MODEL FOR SELF-FINANCING, ECOLOGICAL, SUSTAINABLE, LOCAL INTEGRATED DEVELOPMENT PROJECTS Schoener 50, 1771 ED Wieringerwerf Netherlands. Tel (0) Skype : temanning Website : Chamber de Commerce registration no. NL Amsterdam; VAT code : NL B01 Bank : Triodos 3700 AB Zeist IBAN NL 90 TRIO