27/6/05 Frascati1 M. Bonesini INFN Milano MICE TOF stations updates.

Slides:



Advertisements
Similar presentations
International News US increasing its visible support Operating under financial constraints but slowing down other parts of the MUCOOL programme to provide.
Advertisements

MICE CM January 2009Jean-Sébastien GraulichSlide 1 EMR Issues o Detector o Front end electronics o Funding and Plan Jean-Sebastien Graulich, Geneva.
PID activities 1. Summary of work/activities since last CM in Berkeley 2. PID parallel session in Frascati 3. Topics specific to each subdetector CKOV1.
Detector Systems Update MICO March 17, MICE Detector Systems  CKOV u Mississippi RAL  TOF0/1 u Hamamatsu PMT assemblies show an increasing.
MICE the Muon Ionization Cooling Experiment Emilio Radicioni, INFN EPS-HEP Aachen 2003.
MICE CM16, RAL, 11 Oct 2006V. Palladino Plans for MICE PI detectors & Shielding MICE CM16, RAL Oct 11, 2006 V. Palladino, Univ & INFN Napoli for the small.
M. Bonesini - VC TOF status M. Bonesini Sezione INFN Milano Bicocca.
M. Bonesini - 3/10/061 M. Bonesini INFN Milano Some results from BTF testbeam on TOF.
SLIDE Beam measurements using the MICE TOF counters Analysis meeting, 23 September 2008 Mark Rayner.
02/10/2004 Minimum Bias Trigger Scintillator Counters (MBTS) for early ATLAS running M.Nessi ATLAS week, Freiburg.
KEK Analysis Report Makoto Yoshida Osaka Univ. 2006/06/10 MICE CM15.
M. Bonesini1 TOF design updates M. Bonesini – INFN Milano.
M. Bonesini PID Meeting1 M. Bonesini INFN Milano MICE TOF0 construction & planning.
Luminosity Monitor Commissioning MICE Collaboration Meeting March 2010 Paul Soler, David Forrest Danielle MacLennan.
INFN of Genova, Pavia and Roma Flavio Gatti, PSI, February 9 th, Timing Counter status Timing Counter status.
March 31, Status of the TOF, Ckov and Virtual Detector Packages in G4Mice Steve Kahn Brookhaven National Laboratory Mice Collaboration Meeting March.
M. Bonesini - MICE CM19 RAL 07/10/071 M. Bonesini INFN Milano PMTs tests in Milano (M. Bonesini, M. Rayner, S. Terzo)
MICE: The International Muon Ionization Cooling Experiment Diagnostic Systems Tracker Cherenkov Detector Time of Flight Counters Calorimeter Terry Hart.
M. Bonesini - 08/06/06 Fermilab1 M. Bonesini INFN Milano MICE TOFes construction & planning.
Software parallel session summary MICE collaboration meeting INFN, Frascati 27/6-05.
27/6/05 Frascati1 M. Bonesini INFN Milano A possible design for MICE TOF stations.
M. Bonesini - MICE Collaboration Meeting 9/10/061 M. Bonesini INFN Milano TOF status (mainly TOF0/1)
DAQ WS03 Sept 2006Jean-Sébastien GraulichSlide 1 Report on FEE for PID o Reminder o TOF o EMCAL o Summary Jean-Sebastien Graulich, Geneva.
1 G4MICE Analysis of KEK Test Beam Aron Fish Malcolm Ellis CM15 10th June 2006.
Jun 27, 2005S. Kahn -- Ckov1 Simulation 1 Ckov1 Simulation and Performance Steve Kahn June 27, 2005 MICE Collaboration PID Meeting.
DPNC Sept 2007Jean-Sébastien Graulich MICE The international Muon Ionization Cooling Experiment o o Introduction o o Beam Line o o Cooling Channel o o.
M. Bonesini DAQ Meeting1 M. Bonesini INFN Milano Some Considerations for MICE TOF Stations FE electronics (mainly TOF0)
Mark Rayner, Analysis workshop 4 September ‘08: Use of TOFs for Beam measurement & RF phasing, slide 1 Use of TOFs for Beam measurement & RF phasing Analysis.
Stephen KahnParticle ID Software Mice Collaboration Meeting Page 1 Particle ID Software Steve Kahn Brookhaven National Lab 27 March 2003.
MICE VC March 2009Jean-Sebastien GraulichSlide 1 EMR Status o Introduction o News o Detector Design o Simulations o Responsibilities o Plan Jean-Sebastien.
M. Bonesini - MICE CM CERN 24/2/071 M. Bonesini INFN Milano Updates on TOF project.
MB1 T.O.F. II Precise timing Electron ID Eliminate muons that decay Tracking devices T.O.F. 0 & I Pion /muon ID precise timing 201 MHz RF cavities Liquid.
1 M. Bonesini - CM 25 RAL 5/11/09 PID status report M. Bonesini Sezione INFN Milano Bicocca.
Forward TOF Prototyping Ryan Mitchell GlueX Collaboration Meeting November 2005.
M. Bonesini - MICE CM18 RAL 16/06/071 M. Bonesini INFN Milano Updates on TOF project.
Feb 10, 2005 S. Kahn -- Pid Detectors in G4MicePage 1 Pid Detector Implementation in G4Mice Steve Kahn Brookhaven National Lab 10 Feb 2005.
Results from Step I of MICE D Adey 2013 International Workshop on Neutrino Factories, Super-beams and Beta- beams Working Group 3 – Accelerator Topics.
ICHEP 2012 Melbourne, 7 July 2012 Paul Soler on behalf of the MICE Collaboration The MICE Beam Line Instrumentation (Trackers and PID) for precise Emittance.
PANDA FTOF Prototyping Anton A. Izotov, Gatchina
M Bonesini1 M. Bonesini – INFN Milano TOF news. M Bonesini2 Review of planned work TOF technical designs (structure of detectors, supports, …) will be.
Particle Production in the MICE Beamline IPAC10 Linda Coney, UC Riverside, Adam Dobbs, Imperial College London, Yordan Karadzhov, Sofia University The.
STATUS OF MUV3 CONSTRUCTION A joint IHEP Protvino – Mainz – Pisa project MUV3  Proposed by Italo Mannelli: Thick scintillator tiles with direct light.
M. Bonesini - 22/10/05 RAL1 M. Bonesini INFN Milano MICE TOF stations construction & planning.
M. Bonesini - MICE Inst Meeting M. Bonesini INFN Milano TOF installation plans.
KEK beam test in May 2005 Makoto Yoshida Osaka Univ. MICE Frascati June 27 th, 2005.
SksMinus status Hyperball collaboration meeting 2009/3/11 K. Shirotori.
MICE CMPB Alain Blondel 1 Highlights on MICE.
KEK Test Beam Phase I (May 2005) Makoto Yoshida Osaka Univ. MICE-FT Daresbury Aug 30th, 2005.
M. Bonesini - MICE PID review 12/10/061 M. Bonesini INFN Milano TOF upstream PID review (TOF0/1)
TIMING COUNTER: status report Giorgio CECCHET, PSI July 11th, 2003.
Database David Forrest. What database? DBMS: PostgreSQL. Run on dedicated Database server at RAL Need to store information on conditions of detector as.
M. Bonesini - MICE RAL M. Bonesini INFN Milano PMTs tests in B field.
M. Bonesini – CM 291 PID detectors summary M. Bonesini Sezione INFN Milano Bicocca.
PId (ToF, CKoVI, EMCAL) V. Palladino et al MICEVC Frascati & Fermilab test beams in July Analysis in progress: MICE PID PhConf 4, 31 Aug aiming.
LHCf Detectors Sampling Calorimeter W 44 r.l, 1.6λ I Scintilator x 16 Layers Position Detector Scifi x 4 (Arm#1) Scilicon Tracker x 4(Arm#2) Detector size.
Analysis meeting: Beam momentum measurements using TOFs Tuesday, 22 January 2008 Slide 1 of 10 Beam momentum measurement using.
M. Bonesini - CM 22 RAL October 081 TOF0 status M. Bonesini Sezione INFN Milano Bicocca.
BENE MECC detector Pasquale Migliozzi INFN – Napoli.
ch/~bdl/lepc/lepc.ppt 1 MICE Status and Plans Rikard Sandström Université de Geneve International Scoping Study CERN,
CHIPP Oct 2007Jean-Sébastien Graulich Status of MICE Jean-Sebastien Graulich, Univ. Genève o o Introduction o o Beam Line o o Technical Design o o PID.
Monte Carlo simulation of the particle identification (PID) system of the Muon Ionization Cooling Experiment (MICE) Mice is mainly an accelerator physics.
FTOF Status Anton A. Izotov, Frascati
26/10/04 Meeting1 M. Bonesini INFN Milano MICE TOF0, TOFI, TOFII status.
Prospect of SiPM application to TOF in PANDA
The Beam Test at Fermilab:
Luminosity Monitor Status
STT Status Update Peter Wintz (FZ Jülich) for the STT group
F.Guber, A.Ivashkin INR, Moscow
Timing Counter Sept CSN I, Assisi 2004 Giorgio Cecchet.
Particle ID Diagnostics in the MICE Beamline
Presentation transcript:

27/6/05 Frascati1 M. Bonesini INFN Milano MICE TOF stations updates

27/6/05 Frascati2 Preliminary considerations  Background: MICE for INFN is on track approval, this means that we have got funds for TOF0 prototypes, EMCAL prototypes now only for 2006 (~310 KE on a 415 KE request)  In practice: funds are for specific items, they are not an experiment budget: ie I cannot easily move from one item to the other (eg from PMTs to trigger modules)  Funds cover all TOF0 items up to cable: eg no electronics& calibration system, but counters, mechanics, pmts  A serious final planning cannot be done now

27/6/05 Frascati3 Aim of TOF stations TOF0 experiment trigger TOF0/TOF1 PID on incoming muons TOF1/TOF2 PID on particle traversing the cooling channel Requirements: oSingle detector resolution  ~60 ps oHigh rate capability oSustain nearby B fringe fields This has been questioned by INFN referees, so simulation work is needed on this corner

27/6/05 Frascati4 Short term planning The idea is to freeze the design of TOF0 by November (PMTS+ scint counters): some money has to be spent by end 2005, if not it will evaporate Tests are under way for PMTs (choice of partition chain) and Scintillator type (cosmics) BUT I need urgently some inputs, if NOT I have to assume OLD numbers maybe wrong

27/6/05 Frascati5 TOF0 simulation in my hand With 4 cm width slabs max counter rate seems < KHz. R4998 maybe OK with booster or active divider circuit (studies under way)

27/6/05 Frascati6 What is needed If NEW beam (Aug 05) I need 1. X,Y beam profiles at TOF0 as rates/cm 2 (Hz/cm 2 ) 2. A table with rates/cm 2 x,y with step of 1 cm 2 To decide the geometrical size of TOF0 ( present dimensions 48 x 4 x 2.5 cm 3 for 12 counters/plane)

27/6/05 Frascati7 B field current assumption for TOF0, validated recently by a mail by Kevin, B is well below 50 gauss I need the B field components along the PMT axis and orthogonal to the PMT axis

27/6/05 Frascati8 For TOF1/TOF2 more relaxed schedule presently we are testing fine-mesh PMTs at LASA what is needed is: B field components along/ perpendicular to PMT axis at TOF1/TOF2 X,Y beam profile (rate/cm 2 ) at TOF1/TOF2