Petroleum Engineering 406 Lesson 9b Station Keeping.

Slides:



Advertisements
Similar presentations
Physics of Bridges Mr. Hoa STEM 2014.
Advertisements

ENGR 214 Chapter 16 Plane Motion of Rigid Bodies:
Dynamic Response and Control of the Hywind Demo Floating Wind Turbine
An Experimental Investigation on Loading, Performance, and Wake Interactions between Floating VAWTs ____________________________________________ Morteza.
® 1 Seamanship Chapter 6 Anchoring, Mooring and Rafting.
Vedam VEDAM DESIGN & TECHNICAL CONSULTANCY PVT. LTD , Acropolis, Military Road, Marol, Andheri (E), Mumbai-59, INDIA ,
The Evolution of a New Mooring System for Ultra-Deep Waters By Charles N. White Strategic Offshore Solutions – Houston Fall.
“Eternity begins and ends with the ocean's tides.”
Wall Form Design Example (Continued)
EFFECTS OF VESSEL LENGTH AND DESIGN ON MOTIONS, SAFETY AND DOWNTIME. DON BASS (MUN)
CTC 422 Design of Steel Structures
BASIC MUD LOGGING.
Lesson 36 Torque and Drag Calculations
Lec 4: Fluid statics, buoyancy and stability, pressure
SHIP STRUCTURES Unique Structures (6.1) What are they optimized for?
1 CTC 261 Hydraulics Fluid Statics. 2 Objectives  Know the difference between absolute and gage pressure  Know how to calculate hydrostatic pressures.
EN400 – Principles of Ship Performance
OCEN 201 Introduction to Ocean & Coastal Engineering Offshore Structures Jun Zhang
Vapor-Liquid Separator Design
Naval Architecture & Marine Engineering University of Michigan – College of Engineering The Marine Environment.
Chain Inspection & Maintenance TM. If Chains Are Not Carefully Inspected for Wear And Properly Maintained, Ultimately They Will Fail.
Unit 8 POE Ballistic Device
Islamic University of Gaza Civil Engineering Department Surveying II ECIV 2332 By Belal Almassri.
Petroleum Engineering 406 Floating Drilling
Offshore Drilling Operations Jeff Bugden Canada-Newfoundland Offshore Petroleum Board.
Lesson 18 Casing Design Example
Chevron Floating Roof Support
10 extra topic: Projectile Motion Greg Kelly, Hanford High School, Richland, Washington Photo by Vickie Kelly, 2002 Fort Pulaski, GA.
Classification: Statoil internal Status: Draft WIND LOADS Wind phenomenology Wind speed is experienced essentially at two different time scales:
Mathematical Modelling of Dynamically Positioned Marine Vessels
10.4 Projectile Motion Greg Kelly, Hanford High School, Richland, Washington Photo by Vickie Kelly, 2002 Fort Pulaski, GA.
10.4 Projectile Motion Fort Pulaski, GA. One early use of calculus was to study projectile motion. In this section we assume ideal projectile motion:
Numerical Investigation into Potential Flow Around High-speed Hydrofoil Assisted Craft ZHONGYU YANG supervised by Prof G.E HEARN and.
Building Fun You will have 30 minutes to build the strongest structures you can with only the materials you are provided with. Explain to the class the.
1 Equations of Motion Buoyancy Ekman and Inertial Motion September 17.
1 Petroleum Engineering 406 Floating Drilling Lesson 11a Motion Compensation.
1 TMR4225 Marine Operations, Part 2 Lecture content: –Linear submarine/AUV motion equations –AUV hydrodynamics –Hugin operational experience.
Mathematics of SHIPs. A steel ship can float by displacing an amount of water that is equal to its weight. ARCHIMEDES PRINCIPLE Image Source:
6- Calculation of shear stress at composite interface: A)Under service load: Strain and stress distributions across composite beam cross- section, under.
In chapter 1, we talked about parametric equations. Parametric equations can be used to describe motion that is not a function. If f and g have derivatives.
Petroleum Engineering 406
DIMENSIONAL ANALYSIS SECTION 5.
1 Cesos-Workshop-March-2006 RELIABILITY-BASED STRUCTURAL OPTIMIZATION FOR POSITIONING OF MARINE VESSELS B. J. Leira, NTNU, Trondheim, Norway P. I. B. Berntsen,
BEARING CAPACITY OF SOIL Session 3 – 4
1 MFGT 104 Materials and Quality Compression, Shear, Flexural, Impact Testing Professor Joe Greene CSU, CHICO.
 FPSO — floating production, storage, and offloading systems; offloading of the crude oil to a shuttle tanker;  These are typically converted or newly.
Speed logs.
Copyright © Cengage Learning. All rights reserved. 1 Trigonometry.
Chapter 6.  Moveable rigs include drilling barges, drill ships, jack-up rigs, and semisubmersible rigs.  Offshore rigs use a device called a top drive,
Snag Boat Final Presentation
CASING.
CTC 450 Hydrostatics (water at rest).
Fluid Structure Interactions Research Group
10.4 Projectile Motion Fort Pulaski, GA Mackinaw Island, Michigan
Introduction to Structural Member Properties
Systems Model and Offshore Oil
Introduction to Structural Member Properties
Introduction to Structural Member Properties
Material Properties and Forces
CTC 261 Hydraulics Fluid Statics
Introduction to Structural Member Properties
Introduction to Structural Member Properties
CTC 261 Hydraulics Fluid Statics
TMR4225 Marine Operations, Dynamic stability of underwater vehicles
Drill 80(5) = 400 miles 48 (3) = 144 miles a(t) = 10
Introduction to Structural Member Properties
Copyright © Cengage Learning. All rights reserved.
Introduction to Structural Member Properties
Rear Commodore's Report
INTRODUCTION TO PORT DESIGN
Presentation transcript:

Petroleum Engineering 406 Lesson 9b Station Keeping

Environmental Forces Mooring Anchors Mooring Lines Dynamic Positioning

Station Keeping The ability of a vessel to maintain position for drilling determines the useful time that a vessel can effectively operate. Stated negatively, if the vessel cannot stay close enough over the well to drill, what good is the drilling equipment?

Station Keeping - cont’d Station keeping equipment influences the vessel motions in the horizontal plane. These motions are: surge, sway, and yaw. Generally, surge and sway are the motions that are considered. Yaw motion is decreased by the mooring system but is neglected in most mooring calculations.

Station Keeping When investigating or designing a mooring system, the following criteria should be considered:

Operational Stage 1. The vessel is close enough over the well for drilling operations to be carried out. This varies between operators, but is usually 5% or 6% of water depth. Later, other criteria, based on riser considerations, will be discussed.

Non-operational but Connected 2. The condition from the operational stage up to 10% of water depth. Drilling operations have been stopped, but the riser is still connected to the wellhead and BOPs.

Disconnected 3. The riser is disconnected from the wellhead and the BOPs, and the vessel can be headed into the seas.

Station Keeping - cont’d Example Water Depth = 1,000 ft Drilling: ft Connected: 100 ft max 1,000’

Environmental Forces Acting on the Drilling Vessel (i)Wind Force (ii)Current Force (iii)Wave Force These forces tend to displace the vessel

The Station Keeping System Must be designed to withstand the environmental forces Two types: – Mooring System (anchors) – Dynamic Positioning

(i) Wind Force The following equation is specified by the American Bureau Shipping (ABS) and is internationally accepted:

Wind Force Where:

Table 3-1. Shape Coefficients

Table 3-2. Height Coefficients

(i) Wind Force - example V A = 50 (wind velocity, knots) C h = 1 (height coefficient) C s = 1 (shape coefficient) A = 50 * 400 (projected target area, ft 2) Then F A = * 50 2 * 1 * 1 * 50 * 400 F A = 169,000 lbf = 169 kips

(i) Wind Force - example V A = 50 (wind velocity, knots) 1 knot = 1 nautical mile/hr = statute mile/hr 1 nautical mile = 1/60 degree = 1 minute = 6,076 ft

Where: (ii) Current Force lbf

F c = 1 * 1 * 2 2 * 30 * 400 F c = 48,000 lbf = 48 kips (ii) Current Force - example V c = 2 (current velocity, ft/sec) C s = 1 (shape coefficient) A = 30 * 400 (projected target area, ft 2)

(iii) Bow Forces: T = wave period, sec L = vessel length, ft H = significant wave height, ft

Where:

Bow Forces: NOTE: Model test data should be used when available

Beam Forces: NOTE: API now has Recommended Practices with modified equations

Beam Forces:

Figure 3-1. The catenary as used for mooring calculations. Floating Drilling: Equipment and Its Use The Mooring Line

The Mooring Lines Resist the Environmental Forces

Station Keeping 1. In shallow water up to about 500 feet, a heavy line is needed, particularly in rough weather areas. 2. Chain can be used (but may not be advisable) to water depths of about 1,200 feet. 3. Composite lines may be used to ~ 5,000 feet.

Station Keeping 4. Beyond about 5,000 feet, use dynamic positioning 5. Calm water tension should be determined to hold the vessel within the operating offset under the maximum environmental conditions specified for operation.

Station Keeping, Continued 6. Once the riser is disconnected, the vessel heading may be changed to decrease the environmental forces on the vessel.

Station Keeping Typical Mooring Patterns for Non- Rectangular Semis

Typical Mooring Patterns for Ship- Like Vessels and Rectangular Semis

Typical 8-line Mooring Pattern

Figure Chain Nomenaclature. Stud Link Chain Stud keeps chain from collapsing 3” chain has breaking strength > 1,000 kips! Wire Dia. Pitch

Chain Quality Inspection Chain quality needs to be inspected periodically, to avoid failure: (i) Links with cracks should be cut out (ii) In chains with removable studs, worn or deformed studs should be replaced (iii) Check for excessive wear or corrosion

Dynamic Positioning Dynamic positioning uses thrusters instead of mooring lines to keep the vessel above the wellhead. Glomar Challenger used dynamic positioning as early as ODP uses dynamic positioning.

Advantages of Dynamic Positioning (i) Mobility - no anchors to set or retrieve - Easy to point vessel into weather - Easy to move out of way of icebergs (ii) Can be used in water depths beyond where conventional mooring is practical (iii) Does not need anchor boats

Disadvantages of Dynamic Positioning (i) High fuel cost (ii) High capital cost (?) (iii) Requires an accurate positioning system to keep the vessel above the wellhead. Usually an acoustic system - triangulation

Fig Simple position-referencing system WH 1 = WH 2 = WH 3 WH 1 = WH 3 WH 2 > WH 1, WH 3 W H1H1 H2H2 H3H3

To understand the operating principles of acoustic position referencing, assume that: 1. The vessel is an equilateral triangle. 2. The kelly bushing (KB) is in the geometric center of the vessel. Acoustic Position Referencing

3. The hydrophones are located at the points of the triangular vessel. 4. The subsea beacon is in the center of the well. 5. No pitch, no roll, no yaw and no heave are permitted. Acoustic Position Referencing

Diagram of controller operations.