4.2.24 Student Book © 2004 Propane Education & Research CouncilPage 1 4.2.24 Documenting Vapor Distribution System Installations Documenting your work.

Slides:



Advertisements
Similar presentations
3.4.5 Student Book © 2004 Propane Education & Research CouncilPage Maintaining Bulk Plant Pumps, Strainers and Bypass Systems Knowing how to maintain.
Advertisements

Ninth Lecture Hour 8:30 – 9:20 pm, Thursday, September 13
Student Book © 2004 Propane Education & Research CouncilPage Placing Appliances into Initial Operation Knowing the proper techniques and.
3.1.9 Student Book © 2004 Propane Education & Research CouncilPage Replacing Valves and Fittings in ASME Tanks Replacing ASME tank valves and fittings.
3.7.6 Student Book © 2004 Propane Education & Research CouncilPage Identifying Procedures for Conducting Container Vapor Flaring Operations Before.
Student Book © 2004 Propane Education & Research CouncilPage Installing Vapor Meters Vapor meters are precision measuring devices that.
2.5.2 Student Book © 2004 Propane Education & Research CouncilPage Examining, Maintaining and Operating ASME Tank Setting Trailers For the safe.
3.7.4 Student Book © 2004 Propane Education & Research CouncilPage Identifying Testing Procedures for Anhydrous Ammonia (NH3) Contamination Because.
4.1.9 Student Book © 2004 Propane Education & Research CouncilPage Sizing and Selecting Vapor Meters for Gas Distribution Systems Vapor meters.
3.4.6 Student Book © 2004 Propane Education & Research CouncilPage Maintaining Bulk Plant Compressors Knowledge of the processes involved in maintaining.
3.2.5 Student Book © 2004 Propane Education & Research CouncilPage Identifying Procedures for Requalifying DOT Cylinders by CGA External Visual.
2.3.9 Student Book © 2004 Propane Education & Research CouncilPage Identifying Procedures for Purging Containers & Injecting Methanol Prior to.
3.6.2 Student Book © 2004 Propane Education & Research CouncilPage 1 Many propane marketers receive railcar bulk propane shipments. Well-trained personnel.
1.1.2 Student Book © 2004 Propane Education & Research CouncilPage 1 A basic knowledge and understanding of propane’s physical properties and characteristics.
Designing and Installing Exterior Vapor Distribution Systems INTRODUCTION Course Overview and Objectives.
Student Book © 2004 Propane Education & Research CouncilPage Performing Pressure Tests on Gas Distribution Lines Gas personnel must understand.
Residential Fire Sprinklers Building Codes Plan PreparationPlan Preparation The sprinkler contractor should be required to submit a set of complete, detailed.
7.4.2 Student Book © 2005 Propane Education & Research CouncilPage Reading Electrical Control Circuit Diagrams In the course of repairing a gas.
Student Book © 2004 Propane Education & Research CouncilPage Installing Buried Distribution Lines Using Polyethylene Tubing and Mechanical.
2.3.6 Student Book © 2004 Propane Education & Research CouncilPage Performing a Walk-Around Inspection of the Transport After Loading Performing.
Student Book © 2004 Propane Education & Research CouncilPage Installing Manifold Cylinders or Tanks When installing manifold DOT cylinders.
4.1.4 Student Book © 2004 Propane Education & Research CouncilPage Designing Aboveground ASME Tank Installations A very important decision in designing.
4.1.6 Student Book © 2004 Propane Education & Research CouncilPage Designing Underground ASME Tank Installations A very important decision in designing.
2.5.6 Student Book © 2004 Propane Education & Research CouncilPage Operating a Propane Dispenser to Fill Vehicle-Mounted ASME Tanks To safely and.
5.1.2 Student Book © 2005 Propane Education & Research CouncilPage 1 NFPA 58, LP-Gas Code, sets out the minimum valve and fitting requirements for propane.
3.2.2 Student Book © 2004 Propane Education & Research CouncilPage Performing DOT Cylinder Evacuation and Vapor Flaring Operations Before DOT cylinder.
3.4.2 Student Book © 2004 Propane Education & Research CouncilPage Types and Functions of Valves and Fittings Used in Bulk Plant Containers and.
4.1 Student Book © 2004 Propane Education & Research Council Layout, Design and Selection of a Vapor Distribution System 4.1.
4.1.5 Student Book © 2004 Propane Education & Research CouncilPage Determining the Proper Corrosion Protection Systems for Underground ASME Tanks.
3.6.6 Student Book © 2004 Propane Education & Research CouncilPage 1 In the wake of the September 11 th attack and continuing terrorist threats, shippers,
Student Book © 2004 Propane Education & Research CouncilPage Applying Protective Coatings to Storage Containers ASME tanks require proper.
5.1.5 Student Book © 2005 Propane Education & Research CouncilPage 1 Specific measures are required by the LP-Gas Code for the prevention of dispenser.
In this module you will learn to identify:
2.5.3 Student Book © 2004 Propane Education & Research CouncilPage Verifying Proper ASME Tank Condition Prior to Loading For the safe and efficient.
2.3 Student Book © 2004 Propane Education & Research Council 2.3 Operating a Transport To Deliver Propane.
5.1.7 Student Book © 2005 Propane Education & Research CouncilPage 1 Dispensers used to service portable cylinders require suitable scales for filling.
Commissioning of Fire Protection and Life Safety Systems Presented by: Charles Kilfoil Bechtel National Waste Treatment Plant Richland WA.
Placing Vapor Distribution Systems and Appliances into Operation MODULE 8 System Tests.
4.2.8 Student Book © 2004 Propane Education & Research CouncilPage Installing Aboveground ASME Tanks Installing aboveground tanks is an important.
3.4.7 Student Book © 2004 Propane Education & Research CouncilPage Examining Bulk Plant Electrical Systems Prevention of gas ignition in transfer.
7.3.5 Student Book © 2005 Propane Education & Research CouncilPage Identifying the Function and Characteristics of Draft Fans & Controls High efficiency.
2.3.8 Student Book © 2004 Propane Education & Research CouncilPage Performing Pre-Unloading Cargo Tank Emergency Discharge System & Delivery Hose.
2.5.5 Student Book © 2004 Propane Education & Research CouncilPage Coordinating Loading and Unloading of ASME Tanks Using Contractor- Operated.
3.4.9 Student Book © 2004 Propane Education & Research CouncilPage Identifying Bulk Plant Security Procedures In the wake of the September 11 th,
Preparing Foundations for Cylinders & ASME Tanks
Placing Vapor Distribution Systems and Appliances into Operation MODULE 1 Course Introduction.
5.1 Student Book © 2005 Propane Education & Research Council 5.1 Designing & Installing Dispenser Transfer Systems.
5.1.9 Student Book © 2005 Propane Education & Research CouncilPage Installing Propane Dispensers Successful propane dispenser installations are.
7.3.4 Student Book © 2005 Propane Education & Research CouncilPage Identifying the Components and Operating Characteristics of Limit and Fan Controls.
PROPANE DELIVERY OPERATIONS AND CYLINDER DELIVERY Propane Delivery Operations and Cylinder Delivery.
Code Officials and the Code Process.  To design the interior of the building in conjunction with codes, standards and federal regulations required in.
Housing Rehabilitation. Differences between minor repair, emergency rehab, and substantial rehab Utilizing proper funding sources for each construction.
Student Book © 2004 Propane Education & Research CouncilPage Reducing Cargo Tank Vapor Pressure Using a Plant Compressor In order to use.
3.4.3 Student Book © 2004 Propane Education & Research CouncilPage Bulk Plant Emergency Shutdown Equipment and Periodic Examination Methods One.
7.4.3 Student Book © 2005 Propane Education & Research CouncilPage Identifying Systematic Troubleshooting Techniques and Guidelines for Gas Operated.
5.1.6 Student Book © 2005 Propane Education & Research CouncilPage 1 Selection of proper dispenser transfer hoses, end valves and adapters relies on a.
3.5.9 Student Book © 2004 Propane Education & Research CouncilPage 1 Although unloading a bobtail cargo tank in metered delivery service at the bulk plant.
Student Book © 2004 Propane Education & Research CouncilPage Performing Gas Distribution System Leak Checks Requirements for vapor distribution.
3.7.7 Student Book © 2004 Propane Education & Research CouncilPage 1 Replacing DOT IM tank valves and fittings requires careful application of precautions.
3.3.4 Student Book © 2004 Propane Education & Research CouncilPage Operating a Dispenser to Fill DOT Cylinders by Volume DOT cylinders are designed.
4.1.2 Student Book © 2004 Propane Education & Research CouncilPage Determining System Load and Customer Demand Profile Designing a satisfactory.
Student Book © 2004 Propane Education & Research CouncilPage Identifying Procedures for Converting ASME Tanks in Ammonia Service to Propane.
3.5.6 Student Book © 2004 Propane Education & Research CouncilPage Verifying the Presence of Propane Odorant Drivers and plant unloading personnel.
3.1.8 Student Book © 2004 Propane Education & Research CouncilPage Identifying Procedures for Conducting Container Vapor Flaring Operations Before.
3.6.3 Student Book © 2004 Propane Education & Research CouncilPage 1 Personnel who perform tank car unloading operations must comply with company operating.
RRP Compliance Monitoring EPA performs inspections: – “For cause” (such as inspections based on tips and complaints) – Neutral scheme inspections, which.
Code Officials and the Code Process.  Concentrates on the code process as a whole.  Different type of code officials  Various steps that are taken.
Fire Protection Systems Chapter 9 IBC 9th Edition Amendments
Installing DOT/ICC Exchange or Stationary Cylinders
Information to the Customer
Presentation transcript:

Student Book © 2004 Propane Education & Research CouncilPage Documenting Vapor Distribution System Installations Documenting your work meets applicable building inspection and permit requirements, provides information to service personnel when future work is done, and is vital for settling disputes about services or products provided by your company. In this module you will learn to: (1)Identify paperwork to document the installation or modification of a vapor distribution system

Student Book © 2004 Propane Education & Research CouncilPage Documenting Vapor Distribution System Installations During the installation or modification of vapor distribution systems, the following operations should be documented: Piping system pressure tests and inspections Leak checks of the system Regulator operational tests Changes in the system design made in the course of system installation (applicable in some local jurisdictions)

Student Book © 2004 Propane Education & Research CouncilPage 1 Identifying Paperwork to Document the Installation or Modification of a Vapor Distribution System Your company may require documentation of specific installation information. Make sure you comply with any company-specific policies and procedures for documenting vapor distribution system installations or modifications and fully document these activities on the designated company forms. Job Permits and Inspections State or local jurisdictions may require new or modified installations to be inspected. These inspections could require construction permits, specific tests and inspections. Many building inspection and code enforcement authorities use inspection tags, decals, permits and other documents to monitor work.

Student Book © 2004 Propane Education & Research CouncilPage 2 Identifying Paperwork to Document the Installation or Modification of a Vapor Distribution System Figure 1. Sample Building Inspection Tag It is important to know that inspection tags decals or permits should not be removed from their posted location(s) on the job site without authorization. They can only be removed by the inspection officials, or when completed, by the building owner or owner’s agent as a step in the application for a final building permit of occupancy. However, the tags may be photocopied for company files with the permission of the general contractor or property owner.

Student Book © 2004 Propane Education & Research CouncilPage 2 Identifying Paperwork to Document the Installation or Modification of a Vapor Distribution System Construction Drawings and Documents It is a good idea to keep architectural drawings, site plans, building floor plans, appliance schedules, and detail drawings, plus all change orders, in company files for both future reference, and possible jurisdictional compliance. Other documents such as the gas customer use profile, job bill of materials, and job cost and estimation work sheets could also be included in company files. Updated versions of these documents reflecting the changes that occurred during construction are useful for later service work and for analyzing business performance.

Student Book © 2004 Propane Education & Research CouncilPages 2 & 3 Identifying Paperwork to Document the Installation or Modification of a Vapor Distribution System Piping Pressure Tests and Vapor Distribution System Leak Checks A minimum of the following should be retained for piping pressure tests and leak checks of the vapor distribution system: 1.Piping pressure test Name of the person who did the test Starting time for the pressure test Gauged pressure at start of test Gauged pressure at end of test Ending time for the pressure test Segment(s) of piping tested if complete system was not tested

Student Book © 2004 Propane Education & Research CouncilPages 2 & 3 Identifying Paperwork to Document the Installation or Modification of a Vapor Distribution System Piping Pressure Tests and Vapor Distribution System Leak Checks A minimum of the following should be retained for piping pressure tests and leak checks of the vapor distribution system: 2.Distribution system leak check Name of the person who did the leak check Method used for the leak check Starting time for each leak check performed Measured pressure at start of leak check Measured pressure at end of leak check Ending time for the successful leak check Description of any leaks found and repaired

Student Book © 2004 Propane Education & Research CouncilPage 3 Identifying Paperwork to Document the Installation or Modification of a Vapor Distribution System Regulator Flow Pressure and Lock-Up Tests. Regulator flow pressure and lock-up tests should also be documented on forms provided by your company.

Student Book © 2004 Propane Education & Research CouncilPages 4 & 5 Time to See If You Got the Key Points of This Module… Complete the Review on page 4. See if you are ready for the Certification Exam by checking off the performance criteria on page 5.