Colombian Firm Energy Market: Discussion and Simulation Peter Cramton (joint with Steven Stoft and Jeffrey West) 9 August 2006.

Slides:



Advertisements
Similar presentations
Fall 2008 Version Professor Dan C. Jones FINA 4355 Class Problem.
Advertisements

Hedging Foreign Exchange Exposures. Hedging Strategies Recall that most firms (except for those involved in currency-trading) would prefer to hedge their.
Demand Response in New York State Northwest Power and Conservation Council DR workshop February 24, 2006.
More on Duration & Convexity
1 MondayTuesdayWednesdayThursdayFriday January February March April May
© 2011 D. Kirschen and the University of Washington 1 Participating in Electricity Markets.
1 TAC Review of PRR 650 August 3, Board Charge to TAC Board remanded PRR 650 to TAC for: “an analysis of how to ensure that consumers pay only.
1 Resource Adequacy and Market Power Mitigation via Option Contracts Hung-po Chao and Robert Wilson EPRI and Stanford University Presentation at POWER.
Principles of Microeconomics - Chapter 1
Derivatives Markets The 600 Trillion Dollar Market.
Steven Landsburg, University of Rochester Chapter 7 Competition Copyright ©2005 by Thomson South-Western, a part of the Thomson Corporation. All rights.
The Convergence of Market Designs for Adequate Generating Capacity Peter Cramton and Steven Stoft 24 March 2006.
1 Colombia Firm Energy Auction Peter Cramton (joint with Steven Stoft) 18 December 2006.
A Capacity Market that Makes Sense Peter Cramton & Steven Stoft 18 March 2005.
Chapter 8 The Classical Long-Run Model Part 1 CHAPTER 1.
Imbalance costs of wind power – how to improve the market integration of wind power Hannele Holttinen Senior Research Scientist, Team leader.
Perfect Competition 11-1 Chapter 11 Main Assumption Economists assume that the goal of firms is to maximize economic profit. Max P*Q – TC = Π = TR – TC.
CHAPTER 5 SUPPLY.
Chapter 23 – Perfect Competition Homework – Day 1 Read pages 413 – 423. Stop at "Marginal Cost and Short-Run Supply.” On your own paper in your notebook,
Generation Expansion Daniel Kirschen 1 © 2011 D. Kirschen and the University of Washington.
CHAPTER TWO The Nature of Costs. McGraw-Hill/Irwin © 2003 The McGraw-Hill Companies, Inc., All Rights Reserved. 2-2 Outline of Chapter 2 The Nature of.
Economic Demand Response Sheldon Fulton Executive Director, IPCAA November 4, 2008.
Chapter Five Supply  Section One What is Supply?  Section Two The Theory of Production  Section Three Cost, Revenue, and Profit Maximization.
Risk and Derivatives etc. Dr Bryan Mills. Traditional (internal) methods of risk management External: – banks, etc e.g. hedge, options, forward contracts.
Great Plains Veterinary Educational Center PRM Price Risk Management Protection of Equity (Just The Basics) Part One.
Electric Restructuring In Pennsylvania Sonny Popowsky Pennsylvania Consumer Advocate May 10, 2007 Institute for Regulatory Policy Studies Transforming.
Reliability Charge Colombia, an investment oportunity Paris, Octuber 15-16th, 2007.
Perfect Competition *MADE BY RACHEL STAND* :). I. Perfect Competition: A Model A. Basic Definitions 1. Perfect Competition: a model of the market based.
Copyright © 2008 Pearson Addison-Wesley. All rights reserved. Chapter 9 Competitive Markets.
Costs and Profit Maximization Under Competition
1 Quiz next Thursday (March 15) Problem Set given next Tuesday (March 13) –Due March 29 Writing Assignment given next Tuesday (March 13) –Due April 3.
Chapter 8Slide 1 Perfectly Competitive Markets Market Characteristics 1)Price taking: the individual firm sells a very small share of total market output.
Retail Competition: Managing a Difficult Transition David L. O’Connor Commissioner Massachusetts Division of Energy Resources (DOER) Presentation to National.
DES Chapter 8 1 Technical Issues in Projecting Financial Statements and Forecasting Financing Needs.
1 Colombia Capacity Auction Peter Cramton (with many ideas from Steven Stoft) 9 June 2006.
FUTURES: SPECULATION Types of speculators: –Short term Scalpers Day traders –Long term.
Colombia’s Forward Energy Market Peter Cramton University of Maryland 5 November 2007.
New Regulatory Scheme to Guarantee Power Reliability Colombia, an investment oportunity Santo Domingo, March 14-15, 2007.
In this chapter, look for the answers to these questions:
CHAPTER Foreign Currency Transactions Fundamentals of Advanced Accounting 1 st Edition Fischer, Taylor, and Cheng 6 6.
Eco 6351 Economics for Managers Chapter 6. Competition Prof. Vera Adamchik.
Chapter 14 Equilibrium and Efficiency. What Makes a Market Competitive? Buyers and sellers have absolutely no effect on price Three characteristics: Absence.
PJM©2013www.pjm.com Economic DR participation in energy market ERCOT April 14, 2014 Pete Langbein.
Chapter 6: Perfectly Competitive Supply
Chapter 10 – Perfect Competition Homework – Day 1 Read pages 220 – 230. Stop at "Marginal Cost and Short-Run Supply.” On your own paper in your notebook,
Work Plan Resource Adequacy Forum Technical Committee July 29, 2009.
Resource Adequacy Assessment for 2015 Resource Adequacy Forum Technical Committee Meeting October 1, 2010.
INVESTMENT IN GENERATION CAPACITY PAYMENTS IN COLOMBIAN MARKET Luis A. Camargo S. Wholesale Electricity Market Manager Colombia APEx Orlando. October.
The Impact of Intermittent Renewable Energy Sources on Wholesale Electricity Prices Prof. Dr. Felix Müsgens, Thomas Möbius USAEE-Conference Pittsburgh,
Todos los derechos reservados para XM S.A E.S.P. October, 2006 Luis Alejandro Camargo S. Wholesale Market Manager XM S.A. E.S.P. THE NEW COLOMBIA FIRM.
Copyright McGraw-Hill/Irwin, 2002 Pure Competition 23 C H A P T E R.
Derivatives in ALM. Financial Derivatives Swaps Hedge Contracts Forward Rate Agreements Futures Options Caps, Floors and Collars.
Overview of FIP Issues in the RUC, Verifiable Cost, and other Nodal Market Processes November 12, 2008 VCWG Meeting.
Day Ahead Market QSE’s Credit Requirements Concerns and Solutions August 14, 2008.
California Independent System Operator 1 Department of Market Analysis California Independent System Operator California ISO Creation Time: July,
Estimating the resource adequacy value of demand response in the German electricity market Hamid Aghaie Research Scientist in Energy Economics, AIT Austrian.
Investments in renewable energy support or market based?
Resource Adequacy and Market Power Mitigation via Option Contracts
Frontier Economics, Inc. Cambridge, Massachusetts
Electricity Wholesale Markets: Designs for a low-carbon future
Perfect Competition: Short Run and Long Run
Flexible Forward Contracts for Renewable Energy Generators
Chapter 12 Determining the Optimal Level of Product Availability
Accounts Receivable and Inventory Management
Generation Expansion Daniel Kirschen
Chapter 6 Interest Rate Futures (part2)
GENESYS Current Functionality
A Business Simulation for Corporate Finance Courses
Extensions This chapter describes extensions to:
Planning Reserve Margin
Presentation transcript:

Colombian Firm Energy Market: Discussion and Simulation Peter Cramton (joint with Steven Stoft and Jeffrey West) 9 August 2006

Outline Discussion of issues Simulation of market –Purpose –Model 1 Historical prices Simulated units –Outline of Model 2 Historical prices and output Actual units –Outline of Model 3 Full simulation of auction and investment decision Conclusion

Issues

Reducing risk in early auction years Further protection from insufficient competition Long lead-time projects Why not have a higher strike price? Repowering bids

Reducing risk in early years Early years of auction –Ceiling and floor on firm energy payment to existing suppliers –Spread between ceiling and floor expand each year –Spread starts at 0 (transition years) –Increases to Ceiling = 2 CONE Floor =.5 CONE

Insufficient competition rule Add additional requirement to assure competition from non-dominant players At qualification, quantity of new projects from small players (less than 15% firm-energy market share) > 50% of required new firm energy Otherwise insufficient competition: –Auction held –New entry paid clearing price –Existing capacity paid 1.1 CONE

Long lead-time projects 4-year planning period may be too short for large hydro projects (6-8 years to build) Allow large hydro projects to lock in auction price from 4- year ahead auction seven years (or less) ahead Large hydro project is price taker Decides after auction a fraction of its firm energy to lock in at 4-year ahead auction price Total quantity of firm energy in years > 4 that load purchases is limited by a percent of new firm energy required in that year based on planning projections: Years ahead: 765 Percent limit:405060

Strike price Why not have a very high strike price? (US$250 or more) –Benefits of call option are largely lost Load hedge Mitigation of market power in spot energy market –No reason to set strike price higher than marginal cost of an expensive thermal unit

Repowering bids Easily accommodated in auction Two types: –Quick switchovers (down time less than 1 year) Repower bid is a new entry bid and a conditional retirement –Extended down time (more than 1 year) Retirement followed by new entry bid 1 or more years later

Simulation

Purpose

Assess supplier risk Consider variations of market design Evaluate alternative auction parameters

Model 1

Model 1 Historical prices, simulated units Sample: October 1995 through May 2006 Scarcity hours: spot price > strike price One long dry period: thirteen months –30 Mar 1997 to 21 Apr 1998 One short period of high prices (start of market) –21 Nov 1995 to 24 Dec 1995

Scarcity hours by year

Scarcity hours by month and year Almost every hour is a scarcity hour in long dry periods.

Thermal percent of load Thermal share of load much higher in dry periods. Hydro share is still large in long dry periods.

Model 1: Thermal unit Random time until failure Random time to repair Both exponentially distributed –Long-run availability: 70% and 95% –Mean time to repair: 10 hours and 40 hours 1000 simulations over entire time period –Calculate distribution of net firm energy payment

Firm energy payment All amounts in January 2006 US dollars Auction not modeled so assume payment Firm energy payment = $10.86/MWh –Should be $ –Exact value not relevant

Net firm energy payment Net firm energy payment = Firm energy payment + reward for over performance − penalty for under performance In hours where spot price > strike price, Reward or penalty = (Q actual – Q obligation )(P spot – P strike ) Q obligation = supplier’s share of load

Energy rents $0 Unit’s marginal cost Strike price Peak energy rent Energy rent Unit does not operate Forward energy contract Call option (FEM)

Model 1 results: thermal Net firm energy payment roughly constant Some variation in dry periods –Standard deviation is small compared to mean –Variation greatest for unreliable units with long mean repair times Slight reduction in dry periods (about 10%) –Thermals under perform on average Over perform in low-load conditions Under perform in high-load conditions Small positive correlation between price and load

Alternative obligation: Thermal constant Idea: Make obligation more consistent with unit’s actual dispatch Give thermal a constant obligation during scarcity hours (obligation = LR availability) Hydro follows residual demand (load minus thermal obligation) Can still treat as one product –Load following is not scare –Service is priced at zero in competitive market

Model 1: Hydro unit Actual quantity of firm energy in dry period is a random variable (normal distribution) Unit sells its mean firm energy in dry period (mean availability = 30% or 50%) Actual firm energy has standard deviation (sd = 10% or 15%) –Note: Probably too high. Will rerun with empirically fitted distribution from hydrology data from 1950s.

Thermal-constant alternative No impact on risk Thermal: Higher mean in dry period Hydro: Lower mean in dry period Obligation better matches actual dispatch –Units enter spot market with balanced position –No incentive to exercise market power –With load-following approach: Hydro increases slope of supply curve (increasing price in high-load hours) Thermal bids higher (increasing low-load price)

Model 2

Model 2 Historical prices, output; Actual units Assume each unit sells its firm energy certification (either reference or maximum for hydro) Calculate net firm energy payment for each unit in each hour –Aggregate over month –Aggregate over year –Aggregate over company’s portfolio Provides some insight on supplier risk

Model 3

Model 3 Full simulation of auction and investment Can ask new questions –How does acquired firm energy differ from firm energy target? –What is the impact of increasing the slope of the demand curve around the target? Stationary model –Three project types: baseload, peaker, hydro –Baseload and peaker: Capacity, FC, VC –Hydro: Capacity, FC, Firm Energy

Conclusion

Call option reduces market risk –Load is hedged from high spot prices –Hedge is not too costly for suppliers to offer Physical asset covers obligation Call option reduces supplier risk –Get nearly constant payment, rather than highly variable peak energy rents Call option improves spot market –Mitigates market power problem during scarcity –Better spot market improves forward energy market Spot energy prices are more stable and predictable Thermal-constant obligation is better than load- following obligation