Southern Natural Gas Company 2015 Outage Review Meeting

Slides:



Advertisements
Similar presentations
Southern Natural Gas Company 2015 Outage Review Meeting Customer con call and Webex February 18,
Advertisements

Southern Natural Gas Company 2013 Outage Review Meeting Customer con call and Lync Online Meeting September 18,
Southern Natural Gas Company 2014 Outage Review Meeting Customer con call and Webex September 17,
Southern Natural Gas Company 2014 Outage Review Meeting Customer con call and Webex July 16,
D E P E N D A B L E N A T U R A L G A S Customer Webex July 25 th, 2013.
October 20-21,2009 Agenda Item 6a.. Ohio River CSO Communities Pennsylvania – 10 communities West Virginia – 10 communities Ohio – 10 communities Kentucky.
Project Managers Update Roy Preece Particle Physics Department, STFC MICE Video Conference, 18 th September 2014.
Florida Gas Transmission Mainline Hydrostatic Test From the intersection of Milam Dairy Road with NW 65 th Street to the intersection of Galloway Road.
Hurricane Recovery Update MTAC November 2, HURRICANE RECOVERY TIME LINE OF EVENTS Hurricane Katrina Makes Landfall in Florida 6:30 P.M. Thursday,
2 Permian Basin Supply San Juan Basin Supply Washington Ranch Storage Waha Compressor Stations Gas Supplies Transport Flow Directions Pipelines Production.
Southern Natural Gas Company 2013 Outage Review Meeting Customer con call and Webex July 17,
KERN RIVER GAS TRANSMISSION COMPANY Wyoming Pipeline Authority Casper, Wyoming August 21, 2007 John Dushinske Vice President of Marketing & Regulatory.
Route 28 South of I-66 Corridor Safety and Operations Study Technical Committee Meeting #2 June 25,
Insert Photo Here And mark any obvious features in the photo that are discussed in the camera point description 342°
Insert Photo Here And mark any obvious features in the photo that are discussed in the camera point description.
Florida Gas Transmission Mainline Hydrostatic Test From the intersection of Milam Dairy Road with NW 65 th Street to the intersection of Galloway Road.
Directions to Camera Point: From the parking lot, head south along the path until the three way intersection by the restrooms. Turn east and there will.
NOVEMBER 11, 2014 PUBLIC VERSION Maine 2014 Outage Coordination CONTAINS CRITICAL ENERGY INFRASTRUCTURE INFORMATION – DO NOT RELEASE.
AUGUST 19, 2014 PUBLIC VERSION Maine 2014 Outage Coordination CONTAINS CRITICAL ENERGY INFRASTRUCTURE INFORMATION – DO NOT RELEASE.
Southern Natural Gas Company 2014 Outage Review Meeting Customer con call and Webex June 18,
PROBE COLLEGE FAIR MONDAY, SEPTEMBER 19TH, 6:00-8:30 ARBOR PLACE MALL.
Southern Natural Gas Company 2015 Outage Review Meeting Customer con call and Webex March 18,
1 Northern States Power Companies (NSP-MN & NSP-WI) Transmission Customer Meeting October 14, 2014 Rate Discussion: Attachment O, GG & MM.
®® QUESTAR GAS Transportation Balancing Susan Davis, Director, Account & Community Relations February 28, 2014 We develop, transport and deliver clean.
D E P E N D A B L E N A T U R A L G A S | NYSE:EP Customer Webex September 6, 2011.
Intermountain West Production -- Getting Gas to Market Jim Cleary El Paso Western Pipelines IPAA Mid-Year Meeting June 14, 2004.
UGI Choice Program Update Shaun Hart Thursday, February 23, 2012.
Taitong para Govt. primary School
CALIFORNIA ENERGY COMMISSION Alaska Crude Oil Disruption Staff Update California Energy Commission Fuels and Transportation Division Gordon Schremp August.
El Paso Corporation Nominations and Scheduling Customer Advisory Group Update May 14, 2009 Colorado Interstate Gas Company Wyoming Interstate Company Cheyenne.
 Remembering Joan on the 5 th Anniversary of her death.
Southern Natural Gas Company 2015 Outage Review Meeting Customer con call and Webex September 16,
Florida Gas Transmission Mainline Hydrostatic Test From the Golden Glades Interchange to the interchange of NW 122 nd Street with the Palmetto Expressway.
December 16, 2014Research Administrators Workgroup.
Financial Impact of Drought March 5, 2008 Updated 3/17/08.
® ®® ® IRP Workshop Feb 9, ®  February 9, Workshop - Review of 2014 IRP Order - December 30 and 31 Weather Event - Demand Forecast and 65%
Discussion of Alternatives. OPTION 9 CO 2 PLANT PROCESSING Description: Operate the existing Castle Valley CO 2 plant to process the Price area coal-seam.
To make our routes more efficient New Collection Routes CITY WIDE Starting: Tuesday, January 4, 2011 ALL Trash & Recycling collected on the same day Business.
Southern Natural Gas Company 2015 Outage Review Meeting Customer con call and Webex June 17,
Southern Natural Gas Company 2015 Outage Review Meeting Customer con call and Webex July 22,
2015 New Hampshire Energy Summit 5 October 2015 Robert Scott, Commissioner, New Hampshire Public Utilities Commission.
OPTION 9 CO 2 PLANT PROCESSING Description: Operate the existing Castle Valley CO 2 plant to process the Price area coal-seam gas. Plant can processes.
Drought Monitoring, Prediction and Response - A View From Georgia - David Emory Stooksbury, Ph.D. State Climatologist and Associate Professor Engineering.
Southern Natural Gas Company 2013 Outage Review Meeting Customer con call and Webex May 22,
Southern Natural Gas Company 2013 Outage Review Meeting Customer con call and Webex March 14,
Southern Natural Gas Company 2014 Outage Review Meeting
Southern Natural Gas Company 2015 Outage Review Meeting Customer con call and Webex October 21,
OCTOBER 2, 2013 Maine 2013 Outage Coordination Redacted Copy.
Southern Natural Gas Company 2015 Outage Review Meeting Customer con call and Webex August 19,
Southern Natural Gas Company 2014 Outage Review Meeting Customer con call and Webex August 20,
CBRFC April 2010 Water Supply Webinar 10am, May 7, 2010 Kevin Werner These slides: PLEASE MUTE YOUR PHONES.
Southern Natural Gas Company 2014 Outage Review Meeting Customer con call and Webex April 16,
Southern Natural Gas Company 2016 Outage Review Meeting Customer con call and Webex March 16,
Public Information Meeting St. George Road - Oak Hill Road Intersection Reconstruction Project.
Summer 2000 – Present in California
June 5, 2017.
Southern Natural Gas Company 2015 Outage Review Meeting
TGP Outages Remainder of the Year (Sept. thru Dec.)
Florida Gas Transmission Mainline Hydrostatic Test
Florida Gas Transmission Mainline Hydrostatic Test
Dictation practice 2nd Form Ms. Micaela-Ms. Verónica.
Southern Natural Gas Customer Working Group Meeting
Florida Gas Transmission Mainline Hydrostatic Test
Florida Gas Transmission Mainline Hydrostatic Test
PROJ. 566(17) LOR PID MAJOR WIDENING
projects update ATLANTA district
Southern Natural Gas Company 2018 Outage Review Meeting
Harbour Island Force Main Replacement
System Operational Update and Review December 4, 2018
Presentation transcript:

Southern Natural Gas Company 2015 Outage Review Meeting Customer con call and Webex April 22, 2015

Welcome

Agenda Review Unscheduled Outages Review of Upcoming Outages Contacts 4/23/2017 2:53 PM Agenda Review Unscheduled Outages Review of Upcoming Outages April/May & June North System South System South Louisiana Outages for the remainder of 2015 Contacts © 2007 Microsoft Corporation. All rights reserved. Microsoft, Windows, Windows Vista and other product names are or may be registered trademarks and/or trademarks in the U.S. and/or other countries. The information herein is for informational purposes only and represents the current view of Microsoft Corporation as of the date of this presentation. Because Microsoft must respond to changing market conditions, it should not be interpreted to be a commitment on the part of Microsoft, and Microsoft cannot guarantee the accuracy of any information provided after the date of this presentation. MICROSOFT MAKES NO WARRANTIES, EXPRESS, IMPLIED OR STATUTORY, AS TO THE INFORMATION IN THIS PRESENTATION.

4/23/2017 2:53 PM Disclaimers Anticipated Impacts are estimates. Actual nominations, market demand, weather and pipeline conditions, etc. will determine if, and through what level, restrictions become necessary. Unless otherwise stated, all scheduled dates represent gas days as defined in the Southern Natural Gas Pipeline tariff to mean a period of twenty-four consecutive hours, beginning and ending at 9:00 a.m. (Central Clock Time). Scheduled dates are subject to change. Projects may be added, altered, delayed or cancelled. SNG will provide notice of such additions or changes via SoNet Premier postings. Dates as posted on SoNet should be deemed correct in the event of conflicts between SoNet posted dates and dates within this presentation. © 2007 Microsoft Corporation. All rights reserved. Microsoft, Windows, Windows Vista and other product names are or may be registered trademarks and/or trademarks in the U.S. and/or other countries. The information herein is for informational purposes only and represents the current view of Microsoft Corporation as of the date of this presentation. Because Microsoft must respond to changing market conditions, it should not be interpreted to be a commitment on the part of Microsoft, and Microsoft cannot guarantee the accuracy of any information provided after the date of this presentation. MICROSOFT MAKES NO WARRANTIES, EXPRESS, IMPLIED OR STATUTORY, AS TO THE INFORMATION IN THIS PRESENTATION.

Color Key for Maps Green Yellow Red No Impact Anticipated Restrictions are possible With extended duration, restrictions could be necessary from time to time Meter(s) affected are noted with (M) Red Restrictions are probable

Southern Natural Gas Pipeline Chattanooga Rome SC North System Hartwell Muldon GA MS Bell Mills Tarrant Aiken Elba Express McConnells Atlanta Pell City DeArmanville Louisville Wrens Providence Pickens Reform Ocmulgee Ellerslie Hall Gate Bear Creek Onward Auburn Thomaston Elba Rankin Selma Elmore Holy Trinity Bienville Bay Springs Gallion York South System Riceboro Logansport Enterprise Gwinville AL Albany LA Pearl River Brookman Pavo South Louisiana Franklinton White Castle FL Toca Compressor Station Storage Field LNG Shady Side

Southern Natural Gas Pipeline Unscheduled Outage Update Chattanooga Rome SC North System Hartwell Muldon GA MS Tarrant Bell Mills Aiken McConnells Elba Express Atlanta Reform DeArmanville Providence Pell City Hall Gate Louisville Wrens Pickens Ocmulgee Ellerslie Bear Creek Onward Auburn Thomaston Logansport Elba Rankin Bay Springs Selma Gallion Elmore Holy Trinity Bienville York South System Riceboro Enterprise Gwinville AL Albany LA Pearl River Brookman Pavo South Louisiana Franklinton White Castle unit outage return to service 9-30-15 Impact of 85 MMcf/d of 805 MMcf/d available White Castle FL Toca Compressor Station Storage Field LNG Franklinton unit outage return to service May of 2015 Shady Side

SNG North System Maintenance Review April/May/June Remediation on 24” NMLL through May Chattanooga Relocation of 6” Rome Calhoun line May/June Bear Creek unit maintenance Through June of 2015 Hydro-test on NMLL thru 5-5-15 Huntsville Remediation of North Alabama line 6-1-15 to 6-14-15 AL Rome Bell Mills Station outage 4-25-15 to 4-26-15 90 MMcf/d capacity left of 250 MMcf/d Bear Creek Spring Shut-in test 4-21-15 to 4-27-15 DIQ and DWQ allocated 64% Muldon Storage Remediation NMLL 5-4-15 to 5-22-15 Atlanta MS Tarrant Bell Mills Pell City McConnells Pigging on West Point Loop Line May 5th & 6th Reform DeArmanville Louisville Providence GA Pickens Maintenance on NML 6-15-15 to 6-20-15 65 MMcf/d impact of 550 MMcf/d available Remediation on NML 5-25-15 to 6-12-15 140 MMcf/d impact of 350 MMcf/d available Onward Pressure test /remediation 2ndNML 5-4-15 to 5-31-15 350 MMcf/d impact of 690 MMcf/d available Bear Creek Storage AL Logansport Bienville Rankin LA Remediation on 14” Logansport line Pipeline remediation on NMLL 6-15-15 to 6-19-15 Compressor Station Storage Field Southern will be conducting other general maintenance during this period

SNG South System Maint. Review April/May/June MS Hartwell Aiken Atlanta Hydro-test SMLL May timeframe 140 MMcf/d impact of 1.6 BCF/d available Elba Express GA Wrens Ocmulgee Enterprise station/Rose Hill outage 4-28-15 to 4-29-15 Hallgate AL 10” Macon Branch line maintenance 4-27-15 to 5-8-15 Ellerslie Auburn Thomaston Elba Hydro-test SMLL 4-6-15 to 5-1-15 300 MMcf/d impact of 790 MMcf/d available Gallion Selma Elmore Riceboro York Remediation on Montgomery Columbus line 5-22-15 to 5-29-15 Holy Trinity Enterprise Bay Springs Gwinville Albany Brookman Pavo Compressor Station Storage Field LNG Southern will be conducting other general maintenance during this period

SNG South Louisiana System Maintenance Review April/May/June Gwinville Pearl River MS LA Franklinton West Leg White Castle Toca East Leg White Castle, Shadyside Unit Maintenance April and May West Leg Capacity impact up to 150 MMcf/d of 805 MMcf/d available Remediation on Duck Lake to Franklinton line May thru September 40 MMcf/d impact of 805 MMcf/d available Shadyside Compressor Station Storage Field Southern will be conducting other general maintenance during this period

North System remainder of the year Item # 25-Southern will be conducting pipeline relocation on the North Main loop line east of our Tarrant compressor station July 13th to July 17th. We do not anticipate an impact to customers. Item # 26-Southern will be conducting remediation on the North Main loop line west of our Tarrant compressor station August 17th to August 27th. We do not anticipate an impact to customers. P63 Item # 27-Southern will be conducting maintenance pigging on our Marietta Branch line east of our Bell Mills compressor station in northwest Georgia during the last half of the year. Customers may experience lower than normal pressures during the pigging. Item # 28-Southern will be conducting a hydro-test on our 2ND North Main line east of our McConnells compressor station during the September/October time frame. Capacity could be reduced as much as 285 MMcf/d of the 590 MMcf/d available. IT and secondary firm could be impacted depending on demand requirements. Item # 29-Southern will be conducting remediation on our 2nd North Main line west of our Tarrant compressor station during the September/October time frame. Capacity could be reduced as much as 355 MMcf/d of the 550 MMcf/d available. IT and secondary firm could be impacted depending on demand requirements. We will coordinate this work with the hydro test east of our McConnells compressor station item #28.

North System remainder of the year cont. Item # 30-Southern will be conducting remediation on our 2nd North Main line east of our Tarrant compressor station October 5th through October 30th. Capacity could be reduced as much as 245 MMcf/d of the 550 MMcf/d available. IT and secondary firm could be impacted depending on demand requirements. Item # 31-Southern will be conducting a relocation of our 12” Chattanooga Branch line in Catoosa County Georgia sometime during the last half of the year. We do not anticipate an impact to customers. Item # 32-Fall Storage Field Shut-in tests - The Muldon Storage Field shut-in test will begin on Tuesday, October 6th and continue through Monday, October 12th. The Bear Creek Storage Field shut-in test will begin on Tuesday, October 20th and continue through Monday, October 26th.   As a result of the shut-in test, Southern will reduce each CSS customer's DIQ and DWQ on a pro-rata basis. Each CSS customer will be allocated thirty- six percent (36%) of its currently effective DIQ and DWQ posted on SoNet Premier during the Muldon shut-in test and sixty-four percent (64%) during the Bear Creek shut-in test. This reduced level is subject to change, if necessary, during the test. Please be aware that this temporary reduction in DIQ and DWQ will affect not only CSS service, but also will affect related injection/withdrawal capacity under no-notice firm transportation (FT-NN) service

South System remainder of the year Item # 33-Southern will be conducting maintenance pigging on 30” Riverdale line north of our Thomaston compressor station in Georgia sometime during the month of September. Customers may experience lower than normal pressure during the pigging. Item # 34-Southern will be conducting a hydro-test on our Huber #1 line east of our Wrens compressor station in Georgia July 13th to July 31st. We do not anticipate an impact to customers. Item # 35-Southern will be conducting upgrade work at the Thomaston compressor station in central Georgia during the mid-August to October 30th timeframe. Capacity through Thomaston will be reduced as much as 330 MMcf/d of the 1.6 BCF/d available. IT and secondary firm will be impacted and firm services could be impacted depending on requirements east and north of the station. A study of this project is still ongoing to minimize the impact. Item # 36-Southern will be conducting remediation on our Brunswick line south of our Ocmulgee compressor station in Georgia in the September/October timeframe. We do not anticipate an impact to customers. Item # 37-Southern will be conducting upgrade work at the Brookman compressor station in eastern Georgia during October 12th through October 31st. We do not anticipate an impact to customers. Item # 38-Southern will be conducting upgrade work at the Riceboro compressor station in eastern Georgia November 30th through December 31st. We do not anticipate an impact to customers.

South Louisiana System remainder of the year Item # 39-Maintenance at White Castle and Shadyside compressor stations. West Leg capacity impact up to 150 MMcf/d of 805 MMcf/d available in the September/October timeframe

Gas Control Contacts Adam Krustchinsky – Manager (713) – 420 – 3265 (office) (713) – 202-7035 (cell) adam_krustchinsky@kindermorgan.com Kalman (Kal) Dankovich – Outage Coordinator (713) – 420 – 7522 (office) (713) – 420 – 7305 (Gas Control) kalman_dankovich@kindermorgan.com Jimmy Reese – Lead Controller (713) – 420 – 7310 (office) jimmy_reese@kindermorgan.com Daniel Mitchell – Lead Controller (713) – 420 – 5874 (office) daniel_mitchell@kindermorgan.com

Questions?