Madrid, April 1 st 2008 5 th SG Meeting South Gas Regional Initiative Working Group 4B : Open Seasons.

Slides:



Advertisements
Similar presentations
Draft CMP ROADMAP S-GRI Madrid 27 th February 2013.
Advertisements

Madrid, 29 th January th RCC Meeting South Gas Regional Initiative.
Open seasons in European Markets: Overview and initial lessons learned Dominique Jamme ERGEGs Gas Focus Group (GFG) XIV Madrid Forum, May 2008.
Madrid, 13 th November th SG Meeting South Gas Regional Initiative.
Paris, 14 th December th IG Meeting South Gas Regional Initiative.
Madrid, 27 th October th IG Meeting South Gas Regional Initiative.
Madrid, 17 th February th IG Meeting South Gas Regional Initiative.
CMP PROPOSAL FOR HARMONISATION 17 th IG meeting Madrid 2 nd November 2011.
Lessons from open seasons between France and Spain Regulator’s perspective Benoît Esnault Commission de Régulation de l’Energie (CRE) North West region.
Madrid, September 23 rd th SG Meeting South Gas Regional Initiative Open Season for future capacity.
1 Open Season Development of new capacities between France and Luxembourg NW-GRI, September - 21 st, 2010.
Madrid, 6th February nd SG Meeting South Gas Regional Initiative.
Madrid, 7 th February th SG Meeting South Gas Regional Initiative.
9th SG Meeting South Gas Regional Initiative 15th July 2009, Madrid.
French Working Group Evolution of the contractual structure of the gas transportation network South Gas Regional Initiative 8th IG Meeting – 16th February.
15 November th SG meeting Enagás and TIGF Coordinated implementation of the Network Code on Capacity Allocation Mechanisms.
Update Transparency project RCC The Hague, 12 May 2011 Konrad Keyserlingk - Ofgem -
7 th IG meeting, South Gas Regional Initiative Madrid, 10 th July 2008 Consultation on Requirements for Gas Interconnection Capacity between Spain and.
1 July 2007 Gas Interconnection between Spain and France Comments to the TSO’s document on the analysis of the future interconnection infrastructures needed.
Madrid 15 th July 2009 OS for the development of new gas interconnection capacity between Spain and France after th SG meeting.
Madrid, 16th February th IG Meeting South Gas Regional Initiative.
Paris, 18th May nd RCC Meeting South Gas Regional Initiative.
Paris, 16 th March th SG Meeting South Gas Regional Initiative.
France – Spain open season Results Lessons learned.
XV Madrid Forum, 6-7 November 2008 Gas Regional Initiative Progress and challenges.
French transport structure SG meeting Madrid – 15 July 2009.
Madrid, 12 th April th IG Meeting South Gas Regional Initiative.
OS 2015: next steps Proposals and agreements by TSOs 12 th IG meeting Paris 14 th December 2009.
Madrid, 27 October 2009 South Gas Regional Initiative Open Season France-Spain Validation of the results.
Madrid, 7 th May th SG Meeting South Gas Regional Initiative.
CMP PROPOSAL FOR HARMONISATION 16 th IG meeting Madrid 6 th May 2011.
2006 December 11th ERGEG South GRI – 2 nd IG Assessment of the capacity at the GRTgaz / TIGF interface South Gas Regional Initiative – 2 nd Implementation.
1 Open season th IG Meeting 26 th March 2010 Paris.
Madrid, 15th June rd SG Meeting South Gas Regional Initiative.
10 th SG meeting Madrid 13 th November Index Capacities – Results Capacities – Further steps Capacities – Further steps.
Madrid, 23rd July rd IG Meeting South Gas Regional Initiative.
GRIP South South Region Gas Regional Investment Plans SGRI – 30 th April 2013.
6th Stakeholder Group Meeting Stockholm - 26 November, 2009 Gas Regional Initiative – North West Region Experience with coordinated o pen seasons Dominique.
Gaz de France Réseau de Transport Jacques Laurelut How Gaz de France – Transport can contribute to further competition in France
Gas Regional Initiative Region North-West Transparency Project Nicola Meheran, Ofgem.
25 th IG meeting 13 th December 2013 Enagás, REN and TIGF Issues to be discussed.
Madrid, 1 st April 2008 Proposal for the commercialisation of existing and committed capacity at the cross border point of Larrau between France and Spain.
Madrid, May 21 st th SG Meeting South Gas Regional Initiative Working Group 4B: Open Seasons.
Madrid, 1st April th SG Meeting South Gas Regional Initiative.
OS 2015: Information Memorandum Draft proposal 12 th SG meeting Madrid 7 th May 2010.
CAM PROPOSAL FOR HARMONISATION 19 th IG meeting Madrid 28 th March 2012.
Madrid 15 th June 2009 OS Agreement to Reserve Capacity 10 th IG meeting.
Capacity Allocation Mechanism Iberian overview 13 th SG meeting Madrid 7 th Feb 2011 DRAFT – Portugal / Spain.
1 15 th July 2015 Teleconference 32 nd IG Meeting South Gas Regional Initiative.
OS 2015: Allocation Rules Proposal by TSOs 11 th SG meeting Paris 16 th March 2010.
Madrid, 15th June rd SG Meeting South Gas Regional Initiative TSOs’ report 2013/2015 – Main Findings.
Madrid 24 th March 2009 OS Working Progress 9 th IG meeting.
GRTgaz North  South Link Capacities Sales Organization Considering Future France – Spain Developments 5 th SG meeting of S-GRI in Madrid.
1 CRE proposal on how to allocate capacity according to the Joint Enagas, TIGF and GRTgaz investment plans: points that have been agreed / still need to.
CMP PROPOSAL FOR HARMONISATION Madrid 11 th July 2011.
1 Open Seasons between France and Belgium GRTgaz Fluxys Gas Regional Initiative North-West Stakeholders Meeting 7 May 2010.
Madrid 16 th February 2009 TSOs presentation 8 th IG meeting.
1 16 th February 2016 Videoconference 35 th IG Meeting South Gas Regional Initiative.
37 th IG meeting 31 st May 2016 Enagás, GRTgaz, Reganosa, REN and TIGF.
Madrid, 23rd Sep th SG Meeting South Gas Regional Initiative OSP and Interoperability.
Gas Regional Initiative – North West Region Stakeholders Group meeting - London 14 November, 2008 Capacity Workshop Coordinated Open Seasons Marie-Claire.
25th IG meeting 13th December 2013
Enagás and TIGF Coordinated implementation of the Network Code on Capacity Allocation Mechanisms 15 November th SG meeting.
2nd SG Meeting South Gas Regional Initiative TSOs’ report 2010/11 – Main Findings Madrid, 6th February 2007.
Results of the First Phase of the OS 11th IG meeting
Work plan of GRI NW for 2011 Three out of four projects are started
26th February 2015 Teleconference
Enagás, GRTgaz, REN and TIGF
Work plan of GRI NW for 2011 Three out of four projects are started
Presentation transcript:

Madrid, April 1 st th SG Meeting South Gas Regional Initiative Working Group 4B : Open Seasons

2 Open Seasons: Why ? Open Seasons: assessment and contracting of market needs, leading to investment decisions Developments based on binding requests by market participants Process allowing: Capacity development at existing entry/exit points (Larrau/Biriatou) Creation of new entry / exit point (Midcat)

3 Spain <> France interconnections Open Season: required in France for decision not required in Spain for decision, but jointly conducted by Enagas for coordination Framework for open season proposed by French TSOs (current presentation) This framework is a basis for a trilateral discussion (Enagas, TIGF, GRTgaz)

4 Western and Eastern corridors Centre France Rhône MidCat North South Guyenne Larrau Biriatou

5 Toolbox of an Open Season Information Memorandum Definition of Capacity Products (from / to which market zones) Pricing Information Planning of the Open Season Allocation Rules Capacity matching Priority ranking Allocation process Contractual Rules « TSO builds, shipper books » Delays, Financial Guarantees… Inter-Operator Agreement Physical interface (Pressure, Location…) Coordination of Works

6 Draft action Plan  Coordinated Open Seasons > WG launched  Western corridor (2012)  Eastern corridor (2014)  Monitoring of the WG: South GRI IG  Estimated Timetable (Western corridor)  Preparation of Info Memo: S  Publication of Info Memo: Q  Signature of Interface Agreements between TSOs: Q  Publication of allocation and contractual rules: Q  Binding requests: Q  Capacity allocations: Q  Decisions to build: 2009

7 (*) (*) Existing, expansion not defined

Thank you for your attention