CLIC ACAS Collaboration CERN, 12 April 2011 Mark Boland Principal Scientist Accelerator Physics Australian Synchrotron ACAS Deputy Director.

Slides:



Advertisements
Similar presentations
Page 1 Collider Review Retreat February 24, 2010 Mike Spata February 24, 2010 Collider Review Retreat International Linear Collider.
Advertisements

Tessa Charles Australian Synchrotron / Monash University 1 Bunch Compression Schemes for X-band FELs.
1 ILC Bunch compressor Damping ring ILC Summer School August Eun-San Kim KNU.
CESR as Light Source David L. Rubin for the CESR Operations Group Cornell University Laboratory for Elementary-Particle Physics.
Necessity of Moving from Green Book to White Book M. Hadi Hadizadeh Yazdi International Scientific Meetings Office Iran October 26, 2002 Amman, Jordan.
Ultra Low Vertical Emittance at the Australian Light Source Mark Boland on behalf of Rohan Dowd 1.
February 19, 2008 FACET Review 1 Lab Overview and Future Onsite Facilities Persis S. Drell DirectorSLAC.
View from the NSF: Later Years J. Whitmore (EPP-PNA) M. Pripstein (LHC) M. Goldberg, J. Reidy (EPP) LEPP – CLEO CESR Symposium at Cornell, May 31, 2008.
SLAC Accelerator Department The PEP-II Accelerator John T. Seeman Assistant Director of the Technical Division Head of the Accelerator Department SLUO.
Searching for Quantum LOVE at the Australian Synchrotron Light Source Eugene Tan On behalf of Rohan Dowd 120/10/2010Eugene Tan – IWLC 2010, Genega ASLS.
ICFA Beam Dynamics Panel Update and ABDW #49  ECLOUD`10 Mark Palmer Cornell University Laboratory for Elementary-Particle Physics.
Photon Collider at CLIC Valery Telnov Budker INP, Novosibirsk LCWS 2001, Granada, Spain, September 25-30,2011.
AS Diagnostic Collaboration Mark Boland
Electromagnetic radiation sources based on relativistic electron and ion beams E.G.Bessonov 1.Introduction 2.Spontaneous and stimulated emission of electromagnetic.
23rd June, 2004Outcomes of NZA Instrumentation Workshop 1 Outcomes of the NZA Instrumentation Workshop Very successful meeting. Many thanks to Royal Society.
August 9, 2007M. Palmer1 CESR Machine Studies Planning Overview Principal Projects Other Milestones and Dates Machine Studies Schedule Proposed Plan.
8/28/07RTML EDR KOM1 Cornell Plans for RTML EDR Work G. Dugan Cornell LEPP.
Snapshot of UK graduate training Philip Burrows John Adams Institute for Accelerator Science Oxford University Philip Burrows TIARA Kickoff Meeting, CERN,
1 st October Linear Collider workshop The CLIC/ILC common work plan progress J. Clarke and L. Rinolfi.
A Plan to Construct a Rare Isotope Accelerator Facility KoRIA S. W. Hong Sungkyunkwan University (SKKU) On behalf of Conceptual Design Project Team S.
Beam dynamics on damping rings and beam-beam interaction Dec 포항 가속기 연구소 김 은 산.
Contractor Assurance System Peer Review April Page 1 NSTAR 2011 May 16, 2011 Jefferson Lab Hugh Montgomery.
Project Management Mark Palmer Cornell Laboratory for Accelerator-Based Sciences and Education.
Pavel Karataev John Adams Institute for Accelerator Science At Royal Holloway, University of London oPAC Advanced School on Accelerator Optimisation 7-11.
November 14, 2004First ILC Workshop1 CESR-c Wiggler Dynamics D.Rubin -Objectives -Specifications -Modeling and simulation -Machine measurements/ analysis.
1 Proposal for a CESR Damping Ring Test Facility M. Palmer & D.Rubin November 8, 2005.
MICE at STFC-RAL The International Muon Ionization Cooling Experiment -- Design, engineer and build a section of cooling channel capable of giving the.
1 SPAFOA Capitol Hill Briefing December 2013 Harry Weerts International Linear Collider - progress & status SPAFOA meeting, Dec 11, 2013, H.Weerts.
Office of Science U.S. Department of Energy 1 International Linear Collider In August 2004 ICFA announced their technology selection for an ILC: 1.The.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II Overview Satoshi Ozaki Director, Accelerator Systems Division NSLS-II Project March 27, 2007.
February 2010 ALBA Synchrotron Light Source Francis Perez.
Chromaticity dependence of the vertical effective impedance in the PS Chromaticity dependence of the vertical effective impedance in the PS S. Persichelli.
Workshop on Women in Science and Engineering Latifa Elouadrhiri Jefferson Lab November 16, 2009.
Vertical Emittance Tuning at the Australian Synchrotron Light Source Rohan Dowd Presented by Eugene Tan.
CesrTA Status Report Mark Palmer Cornell University September 2, 2009.
Summary David Rubin Cornell Laboratory for Accelerator-Based Sciences and Education.
Supervisors: Roger Rassool Mark Boland Ioannis Papaphilippou CLIC – ACAS Collaboration Damping Ring Studies Kent Wootton 12 th April 2011.
DESY. Status and Perspectives in Particle Physics Albrecht Wagner Chair of the DESY Directorate.
Summary of XFEL uses for CALIFES Erik Adli (University of Oslo, Norway)
CESR as Light Source David Rubin for the CESR Operations Group Cornell University Laboratory for Elementary-Particle Physics.
Pushing the space charge limit in the CERN LHC injectors H. Bartosik for the CERN space charge team with contributions from S. Gilardoni, A. Huschauer,
UK X-FEL National Laboratory Perspective Susan Smith STFC ASTeC IoP PAB/STFC Workshop Towards a UK XFEL 16 th February 2016.
Characterization of the Fast Ion Instability at CesrTA David Rubin Cornell University.
ARW 2013 Opening Melbourne, Australia, 15 April 2013 Dr Mark Boland Principal Scientist Accelerator Physics Australian Synchrotron ACAS Deputy Director.
11/18/2008 Global Design Effort 1 Summary for Gamma-Gamma Mayda M. Velasco Northwestern University November 20, 2008 LCWS08 -- UIC, Chicago.
Universities meet Laboratories Frankfurt am Main, 30 September – 1 October 2014, Germany 1 Development of Accelerator Laboratories in Slovakia Marius Pavlovic,
Vertical Emittance Measurements using a Vertical Undulator K.P. Wootton, G.N. Taylor, R.P. Rassool Uni. Melbourne M.J. Boland, B.C.C. Cowie, R. Dowd, Y.-R.E.
Ultra-low Emittance Coupling, method and results from the Australian Synchrotron Light Source Rohan Dowd Accelerator Physicist Australian Synchrotron.
Dr Mark Boland Principal Scientist Accelerator Physics AXXS Australian X-band XFEL Source at the Australian Synchrotron On behalf of the Accelerator Science.
JAI Fest Welcome! JAI Fest meeting 10 Dec 2015 Andrei Seryi John Adams Institute for Accelerator Science.
ESLS Workshop Nov 2015 MAX IV 3 GeV Ring Commissioning Pedro F. Tavares & Åke Andersson, on behalf of the whole MAX IV team.
Welcome to the 3 rd LOW  RING workshop in Oxford 8-10 July 2013.
Capabilities and Programmes of STFC’s Accelerator Science & Technology Centre (ASTeC)
The Laboratori Nazionali di Frascati of the Istituto Nazionale di Fisica Nucleare 1.
LCC L. Evans, Santander, 2nd June 2016
Australian light sources: XFEL and Compact Compton Source
SuperB Injection, RF stations, Vibration and Operations
Coupling Correction at the Australian Synchrotron
Why Study Electron Clouds? Methods and Tools to Study Electron Clouds
Status of the VEPP-2000 Collider Project at Novosibirsk
LER 2010 Overview (and other)
LHC (SSC) Byung Yunn CASA.
The Proposed Conversion of CESR to an ILC Damping Ring Test Facility
Explanation of the Basic Principles and Goals
WELCOME TO SOLEIL Amor Nadji On behalf of Synchrotron SOLEIL
SOLID Collaboration Meeting
Proposal for a CESR Damping Ring Test Facility
The Laboratori Nazionali di Frascati of the
Fanglei Lin, Yuhong Zhang JLEIC R&D Meeting, March 10, 2016
Status of DESY-PSI-CERN collaboration on development of X-band TDS with variable polarisation: PolariX-TDS Alexej Grudiev on behalf of Polarix-TDS collaboration.
Presentation transcript:

CLIC ACAS Collaboration CERN, 12 April 2011 Mark Boland Principal Scientist Accelerator Physics Australian Synchrotron ACAS Deputy Director

Creation Myth – top of the World...? CERN, 12 April 2011CLIC/ACAS Update - Mark Boland2

CERN, 12 April 2011CLIC/ACAS Update - Mark Boland3 Synchrotron: An Australian Invention? Facility History

Synchrotron: An Australian Invention? First Publications: CERN, 12 April 20114CLIC/ACAS Update - Mark Boland Facility History

Synchrotron: An Australian Invention Oliphant’s Unpublished Memo: 1944 CERN, 12 April 20115CLIC/ACAS Update - Mark Boland Facility History

Synchrotron: An Australian Invention? Oliphant’s Notebooks Adelaide University CERN, 12 April 20116CLIC/ACAS Update - Mark Boland Facility History

CERN, 12 April 2011CLIC/ACAS Update - Mark Boland7

CERN, 12 April 2011CLIC/ACAS Update - Mark Boland8 ACAS Institutes Formation of:

Why ACAS? Motivation Grow the field of accelerator physics Sustain successful accelerator based user facilities Develop student programs Publish research findings Contribute to Big Science international collaborations Challenges Physics departments say it is engineering Engineering departments say it is physics “Only” user support not science No dedicated university courses Broad field to cover CERN, 12 April 2011CLIC/ACAS Update - Mark Boland9

ACAS – Building on the past CERN, 12 April 2011CLIC/ACAS Update - Mark Boland10 Sir Mark Oliphant

ACAS Launch 13 July 2010 Launched by the Australian Minister for Science Kim Carr Announced intention to join international FEL and Collider projects $1 M AUD for 4 years, damping ring study project FEL project planned; e-gun, IR- FEL, beam diagnostics and detectors CERN, 12 April 2011CLIC/ACAS Update - Mark Boland11

ACAS – Building the future Nurture students into accelerator physics Willing to contribute to ambitious science projects Strong desire to collaborate CERN, 12 April 2011CLIC/ACAS Update - Mark Boland12

ACAS Facility Overview: ANU $7.6 M AUD upgrade CERN, 12 April 2011CLIC/ACAS Update - Mark Boland13

ACAS Facility Overview: Uni. of Melb. CERN, 12 April 2011CLIC/ACAS Update - Mark Boland14 Pelletron - 5 MV ion accelerator X-ray detector development and Accelerator Diagnostics High Energy Particle Physics at the LHC Primary provider of top students! ARC Centre of Excellence for Particle Physics at the Tera-Scale Funding: $25.2 M AUD over 7 years Centre Director: Prof Geoffrey Taylor Administering Organisation: The University of Melbourne

ACAS Facility Overview: ANSTO CERN, 12 April 2011CLIC/ACAS Update - Mark Boland15 STAR - 2 MV Tandetron ion acceleratorANTARES - 10 MV Tandem ion accelerator

ACAS Facility Overview: Australian Synchrotron light source $300 M AUD proposal for machine development and 10 new beamlines $38 M AUD building upgrade; science centre, user accommodation, engineering workshop and laboratory space (construction started Dec 2010) CERN, 12 April 2011CLIC/ACAS Update - Mark Boland16

Top 2 ACAS Projects “Big Science” CERN, 12 April 2011CLIC/ACAS Update - Mark Boland17 FEL – Free Electron Laser Linear Collider ILC

2001 Victorian Government funding announced 2003 Technical team assembled – Building complete, moved on-site – Linac commissioning begins – Booster commissioning, 1 st April 3 GeV beam – Storage ring Commissioning 14 th July 2006 – First Light Beamline Commissioning 1 st April 2007 – User operations begin 1 st October 2008 – 1000 th User visit November 2009 – 98% beam up-time Australian Synchrotron Timeline CERN, 12 April CLIC/ACAS Update - Mark Boland Facility History

CERN, 12 April 2011CLIC/ACAS Update - Mark Boland19

CERN, 12 April 2011CLIC/ACAS Update - Mark Boland20 National Synchrotron Science Centre Medical Imaging Beamline Offices User Accommodation Storage Engineering Workshop Metrology Laboratory RF Laboratory Buildings under construction Completion late 2011

Student Numbers × PhD 3 × Masters/Honours 6 × Bachelor 2 × Summer 10 × Undergraduate Lab 24 in total Accelerator Schools, one week introductory lectures: – 2008 ACCEL08, Prof Ted Wilson, Oxford University – 2010 ASAP, Prof Ken Peach, Oxford University CERN, 12 April 2011CLIC/ACAS Update - Mark Boland21 ACAS

CLIC/ILC Damping ring requirements CERN, 12 April 2011CLIC/ACAS Update - Mark Boland22 CLIC/ILC damping rings will use large sections of wigglers to increase damping rate.

Body of evidence for low emittance CERN, 12 April 2011CLIC/ACAS Update - Mark Boland23 ε y = 1.24 ± 0.4 pm World Low? Dowd et. al., Phys. Rev. ST-AB 14, (2011) Toucheck lifetime Toucheck parameterClosest tune approach Beam rotation angle

Optical Interferometer and Damping Rings Kent Wootton (PhD student Melbourne) CERN, 12 April 2011CLIC/ACAS Update - Mark Boland24 Vertical Beam Size Measurement Collaboration with Toshi Mitsuhashi, KEK Damping ring modeling Contributing to CLIC CDR

Transverse Bunch-by-Bunch Feedback David Peake (PhD, Uni. of Melb.) CERN, 12 April 2011CLIC/ACAS Update - Mark Boland25 Powerful beam diagnostic system developed Stabilised beam 100% longer beam lifetime Coupled bunch mode measurement and analysisID magnet transition – trapped RF mode?

CLIC/ACAS Update - Mark Boland Precision Storage Ring Beam Energy Measurement from Resonant Spin Depolarisation τ = 805 s Energy in Gev E E E E E E E ValueRelative Uncertainty Signal Generator~10 e-5 g7.4 e-12 Mass5.0e-13 CERN, 12 April

ACAS Activities December 2010AIPC 2010 ACAS - Mark Boland27 CLIC Collaboration highlights: Monash Uni. student modelling two beam RF cavities for final year project (Tessa Charles) Uni. of Melb. Physics workshop staff working at CERN on RF cavity installation and testing (Ashley French) Invited talk at Linear Collider workshop (Rohan Dowd) Student scholarship to Linear Collider school (Kent Wootton) CLIC Collaboration highlights: Monash Uni. student modelling two beam RF cavities for final year project (Tessa Charles) Uni. of Melb. Physics workshop staff working at CERN on RF cavity installation and testing (Ashley French) Invited talk at Linear Collider workshop (Rohan Dowd) Student scholarship to Linear Collider school (Kent Wootton) ACAS Workshop on Accelerator Feedback Systems, Sydney December 2010 ACAS School for Accelerator Physics, Sydney December 2010 Research Collaboration Agreement with CERN on CLIC R&D

Summary ACAS formed to grow the field of accelerator physics ACAS Facilities have a good user program and government support Essential for successful NEP, nuclear and x-ray science research in Australia? Strong student interest Developing international collaborations Promising future government support CERN, 12 April 2011CLIC/ACAS Update - Mark Boland28

ACAS CERN, 12 April CLIC/ACAS Update - Mark Boland