CESR-B Cavities at the CLS Operating Experience 2003 - 2014 J. Stampe, M. deJong, C. Regier, X. Shen.

Slides:



Advertisements
Similar presentations
ESLS 04 Daresbury Laboratory
Advertisements

1 Ann Van Lysebetten CO 2 cooling experience in the LHCb Vertex Locator Vertex 2007 Lake Placid 24/09/2007.
Magnet Cooldown Scheme 17 th February 2012 Roy Preece (STFC RAL)
February 17-18, 2010 R&D ERL Roberto Than R&D ERL Cryogenics Roberto Than February 17-18, 2010 CRYOGENICS.
MICE Hydrogen System Implementation Tom Bradshaw Elwyn Baynham Iouri Ivaniouchenkov Jim Rochford.
Possible Assembly and Test of the Crab cryomodule in SM18 at CERN P. Maesen LHC Crab Cav meeting, 17 Sep’ 09 LHC-CC09Cryomodule Assembly & Test Stand.
ORNL is managed by UT-Battelle for the US Department of Energy Commissioning and Operation of the Horizontal Test Apparatus at SNS Presented at: CEC/ICMC.
The MICE vacuum system Presented by Mark Tucker at CM-39, 26 June 2014.
Fcal upgrade for sLHC: Cryogenics modifications – TE-CRG/ C.Fabre 1 ATLAS FCal Upgrade for sLHC: Modifications to the Calorimeter Cryogenic.
TDR Part 2: 3.3 Cavity Integration (10 pages) H. Hayano Baseline Design based on the meeting discussion.
Preliminary design of SPPC RF system Jianping DAI 2015/09/11 The CEPC-SppC Study Group Meeting, Sept. 11~12, IHEP.
Accelerators for ADS March 2014 CERN Approach for a reliable cryogenic system T. Junquera (ACS) *Work supported by the EU, FP7 MAX contract number.
Cryomodule Helium Vessel Pressure -- a Few Additional Comments Tom Peterson 18 November 2007.
IHEP 1.3 GHz Cryomodule and Cryogenics IHEP Cryogenic group 2nd Workshop of the IHEP 1.3 GHz SRF R&D Project Dec 2 nd, 2009.
Hydrogen system R&D. R&D programme – general points Hydrogen absorber system incorporates 2 novel aspects Hydrogen storage using a hydride bed Hydrogen.
XFEL SRF Accelerating Module Prototypes Tests at DESY Fermilab Seminar, July 21st Denis Kostin, MHF-SL, DESY.
July LEReC Review July 2014 Low Energy RHIC electron Cooling Sergey Belomestnykh SRF and RF systems.
ERL: G-5/e-Gun Cryogenic & Pressure Safety Committee Review ERL G-5/e-gun Beam Line Vacuum Failure Analysis April 24, 2009.
Low-Level RF of BEPCII Sun YI IMAC’07 May. 11, 2007 IHEP.
05 Novembre 2003Chamonix XIV Workshop, January How to deal with leaks in the QRL and magnet insulation vacuum Paul Cruikshank for AT/VAC Germana.
Experience with LEP (and LHC) cryo-modules Workshop on cryogenic and vacuum sectorisations of the SPL O.Brunner – November ’09.
Test plan for SPL short cryomodule O. Brunner, W. Weingarten WW 1SPL cryo-module meeting 19 October 2010.
L. Serio COPING WITH TRANSIENTS L. SERIO CERN, Geneva (Switzerland)
9/17/07IRENG071 Cryogenic System for the ILC IR Magnets QD0 and QF1 K. C. Wu - BNL.
Process Definition of the Operation Modes for Super-FRS Magnet Testing CSCY - CrYogenic department in Common System, GSI, Darmstadt Y. Xiang, F. Wamers.
CRYOGENICS FOR MLC Cryogenic Principle of the Module Eric Smith External Review of MLC October 03, October 2012Cryogenics for MLC1.
Cryostat & LHC Tunnel Slava Yakovlev on behalf of the FNAL team: Nikolay Solyak, Tom Peterson, Ivan Gonin, and Timergali Khabibouline The 6 th LHC-CC webex.
Mike Struik / LHC-CRI INSTRUMENTATION FEEDTHROUGH SYSTEM FOR LHC MACHINE ARC QUADRUPOLE MAGNETS. 123rd LHC Vacuum Design Meeting 19 April 1999.
MAGNET#1MAGNET#2MAGNET#3 SATELLITE VB#1 SATELLITE VB#2 SATELLITE VB#3 PRECOOLER#1PRECOOLER#2 DISTRIBUTION VALVE BOX DVB CP#1CP#3CP#2 BUFFER DEWAR LHe 5m.
Cryogenic Summary - K. C. Wu Testing D2L102 in MAGCOOLJune, 02 Difference between D2L102 and D2L101 Operating Summary Cooldown to 100 K and 6 K Test Condition.
Date 2007/Sept./12-14 EDR kick-off-meeting Global Design Effort 1 Cryomodule Interface definition N. Ohuchi.
Beam Commissioning & Operation of SRF Modules for PLS-II Younguk. Sohn, Y-D. Joo, I.S. Park, I.H. Yu, M.H. Chun, J.D. Park, J-Y. Haung Pohang Accelerator.
8/29/07K. C. Wu - Brookhaven National Lab1 Major Components in ILC IR Hall Interchangeable Detectors.
Power couplers Timergali Khabiboulline (FNAL) FNAL-LBNL meeting on NGLS April 13, 2012.
CW Cryomodules for Project X Yuriy Orlov, Tom Nicol, and Tom Peterson Cryomodules for Project X, 14 June 2013Page 1.
CMTF Cryogenics Arkadiy Klebaner May 6, Outline CMTF cryogenic system scope Goals Key functional requirements Conceptual layout Cryoplant Current.
Integration and Cold Testing of the CW ERL Cryomodule at Daresbury Shrikant Pattalwar ASTeC, STFC, Daresbury Laboratory (UK) On behalf of ERL Cryomodule.
2015 Operations Stay Treat CHL2 4K Cold Box Modifications SC1 2K Cold Box CC4 Failure Helium and LN2 Losses Contamination Operations Stay Treat.
Cryogenics for SuperB IR Magnets J. G. Weisend II SLAC National Accelerator Lab.
RFQ coupler S. Kazakov 07/28/2015. Requirements: Coupler requirements Expected problems: Heating (loop, ceramic window, etc.) Multipactor Solutions: Appropriate.
K. TAVAKOLI Upgrade of the superconducting RF cavities at soleil K. Tavakoli SOLEIL Synchrotron, France.
Shuichi NoguchiTTC Meeting at Milano, Injector Cryomodule for cERL at KEK Cavity 2 Prototypes were tested. Input Coupler 2 Couplers were tested.
FCC Infrastructure & Operation Update on the cryogenics study Laurent Tavian CERN, TE-CRG 28 October 2015.
TDR Cryogenics Parameters Tom Peterson 28 September 2011.
Operation Status of the RF Systems and Taiwan Photon Source
SRF Operating Experience at JLab
Teleconf ACS – FREIA 28th March 2017
Existing Prototype Test Facility (PTF) and planned Series Test Facility Schroeder, Claus Cryo-Review Darmstadt
Cryomodule test stand at ESS site
at STFC Daresbury laboratory
Cryogenic behavior of the cryogenic system
Cryogenic Heater Controls in C100 Cryomodules
Partial Warm-Ups at CLS
TTC Topical Workshop - CW SRF, Cornell 12th – 14th June 2013
Dana M. Arenius Jefferson Laboratory Cryogenics Dept Head
SPS cryogenic proximity equipment and SM18 validation
Cryogenic System Operation and the Progress of SSRF II
Test plan of ESS HB elliptical cavity
SNS Fundamental Power Coupler History
Recirculating CO2 System
Regular cryomodule maintenance plans (radiation damage, seals, etc)
Operation experience of cryogenic system and cryomodules for the superconducting linear accelerator at IUAC, New Delhi. T S Datta ( On behalf of Cryogenics.
Mathew C. Wright January 26, 2009
RF Techniques and Developments at SSRF
Cryo-ops 2018,Beijing,IHEP
IHEP ILC Cavity Status Jiyuan Zhai (IHEP)
Performance Recovery at CEBAF
Cryomodules Challenges for PERLE
Cryogenic behavior of the magnet
Field Emission and Mitigation in the CEBAF Linacs R Legg, R Geng Jlab SRF Ops Dept. TTC,
Presentation transcript:

CESR-B Cavities at the CLS Operating Experience J. Stampe, M. deJong, C. Regier, X. Shen

2 CLS Storage Ring and RF System 2.9 GeV electron storage ring / Synchrotron m circumference E loss per turn: ~ 1.1 MeV with all insertion devices operating ~10 mm bunch length Thales TH2161B Klystron amplifier 310 KW CW RF Power at 500 MHz Accel built CESR-B RF Cavities Total RF Voltage: 2.2 to 2.4 MV Maximum Current: ~250 mA

Cavity 1 Operating Experience Cavity #1 delivered in May 2003, commissioned August 2003 –Q 0 = 8x10 8 at the designed 8 MV/m field –External Q was 192,000 –Static heat losses in the cavity and transfer system ~ 35 W Removed late 2004 for commissioning Cavity #2 Reinstalled November 2005 –Cavity #1 was stored under dry nitrogen for one year –Cavity #1 operating at 2.2 MV for storage ring operation within 4 hours of cool-down Removed after UHV leak January 2013 –Currently under repair by Research Instruments Typical Operation: –2.2 to 2.4 MV with 250 mA beam current –229 kW RF power input with all insertion devices on –~ 40 to 50 W power dissipation into LHe immediately after conditioning –Climbs to ~ 90 to 100 W after two weeks due to cavity contamination –Regular pulse conditioning and partial warm-ups enhance performance

Issues with Cavity 1 Arc Detectors: false arc trips, decreasing sensitivity - resolved with radiation hard High OH fibre under 20 cm lead shielding and coincidence detection from dual detectors Marginal ability to support 250 mA beam current with gradually increasing I.D. loads - Due to limited He transfer line capacity and high heat dissipation at required RF voltage when cavity “dirty” High phase sensitivity to helium pressure variations Some intermittent “CLTS” cryogenic temperature sensors - Redundant sensors to be added in critical locations Hex gas heater failure UHV leak from helium vessel

RF Conditioning Results Cavity 1 Cryo Load

He Vessel Pressure vs. Cavity RF Phase

Helium Pressure / RF Phase Fluctuations before/after cryo valve controller change Siemens Valve controllers Samson Valve controllers <>

Cryostat He vessel PRV “Normally Open” electric/air PRV could allow contamination of cryo system if air supply or 24V power to PRV drops out Bar mechanical PRV added after 1.45 Bar electric PRV. - Burst disk provides fast redundant protection. PRVs tend to leak after activation due to ice in PRV, heating required to thaw - Dual PRV branches installed. A single valve can select second branch after PRV activation to allow first branch to thaw.

Hex Gas Heater Failure Lightning strike on power line Control loop power supply failure caused prolonged full power heater operation with no cryogenic flow Hex heater damaged Cryostat warmup and insulation vacuum venting required to replace components

A little too warm… Heater cut-outs added

Cavity 1 UHV Vacuum Leak January 2013 Cavity Pressure and Residual Gas Analysis

Cavity 1 removed for repair Leak found from He vessel to UHV at RF pickup

Cavity 2 Commissioning and Initial Operation Cavity #2 delivered August 2004, and commissioned January 2005 –Q 0 = 1.1x10 9 at 6.6 MV/m field (2.0 MV) –External Q = 222,000 –Same static heat losses as Cavity #1 Initial Operation: –Less difficulty balancing LHe and cold return gas flows – discovered a problem with HEX gas controller on Cavity #1 –Operation at 8 MV/m demonstrated after some months –Typical storage ring beam current 150 mA in 2005 –Intermittent quenching observed –Encountered a very small leak into the insulation vacuum. Countered by operating a turbo continuously on insulation vacuum Cavity 2 removed October 2005, Cavity 1 reinstalled Cavity 2 reinstalled January 2013 after Cavity 1 failure

Issues with Cavity 2 Insulation vacuum leak - Initially small, thought to be from helium connection - Much larger “Boot Box” leak found later when cavity 2 reinstalled after cavity 1 UHV failure Leak from N2 waveguide volume found - Area between kapton window and RF window, -Currently operating without N2 in waveguide Cavity UHV issues Intermittent quenching as vacuum deteriorates, could not run reliably at high RF voltage

Cavity 2 Insulation Vacuum Leak O-ring seal around perimeter “Boot Box” Cavity lifted and frame reversed to allow box removal

Boot Box O-ring Leak Cavity 1 Cavity 2

Cavity 2 UHV Issues Outgassing as function of beam related heating Slow improvement with partial warm-ups Full warm-ups while pumping during maintenance outages Will likely require significant time to reach vacuum quality of Cavity 1 Plan to also install added NEG pumping, TSPs etc. around cavity as cavity “cryo- pumps” storage ring

Situation Early 2013: RF Power Delivery for 250 mA Beam and ID Load Insufficient at Available RF Cavity Voltage Cavity 2 vacuum still gradually conditioning. Partial warm-ups (50 K) and cavity UHV pump-outs required to evacuate H2, N2. etc. Cavity intolerant of high RF voltage: Cavity quenching at gradually decreasing voltage threshold between partial warm-ups Increased Operational ID beam loads: - BMIT SCW field increase from 2.0 to 4.1 T; 10 Kw additional load, already problematic with Cavity 1 at higher RF voltage - BioXAS ID on line;12 Kw additional load Limited combination of beam current and ID loads allowable at voltage allowable to reduce quench frequency Current load including dipoles 247 Kw Projected total load with future IDs 298 Kw Qext needed to be lowered to increase available beam power at lower cavity voltage

Cavity 2 Qext Adjustment Cavity 2 Qext = 222,000 Cavity 1 Qext = 192,000 Waveguide tuners implemented at other facilities to lower Qext Simple approach: Add “Lumped Constant” in waveguide to change cavity Qext H plane aperture reduction chosen 3 potential locations close to cavity RF waveguide input

Waveguide Iris Measurements Sliding H Aperture Adjustments Qext and Freq. Pull Measurements 3 Locations Tested

Qext Reduction Test Waveguide aperture reduced in magnetic plane Qext change and frequency pull noted

Ready for high power test… Irises Machined Selected and Installed

Cavity 2 Performance Mid 2013 Cavity 2 Qext was dropped from 222,000 to 170,000 during April 2013 Outage Frequency pull approx. 30 kHz Partial cavity warm-ups still required every 2 weeks due to cavity outgassing / poor vacuum More reliable cavity performance with high beam loads at lower cavity voltage / less quenching but still unable to maintain full ID loads for 2 week period at 250 mA without cavity quenches at required Cavity V Beam current limited to 230 mA to allow all IDs to operate at max. loads without cavity quenches

Qext reduced to 150,000 in October 2013 Outage 140 mm total reduction of W/G H aperture Additional frequency pull ~ 12 kHz Current Cavity 2 Operation All present IDs can be run reliably at max load with 250 mA: ~ 240 kW beam power, 260 kW Klystron PF, Cavity V = 2.05 MV Low power dissipation into LHe, ~ W No quenches, partial warm-ups continue High power test done with all present IDs at max load, 300 mA, 300 kW PF, ~ 280 kW beam power (~ 40 kW reserve beam power at 250 mA) Higher beam power will require 2 installed cavities and more RF power

25 Current CLS LHe and RF System Layout Single Amplifier and Cavity, Long Cryo Transfer Line

Future Plans: Proposed Layout 2 Installed Cavities, 2 nd Amplifier and Cryo Move / Upgrade for 500 mA - 2 Cavities initially to be fed from 1 Amplifier via high power splitter --

Thanks!

Cavity 2 Full warmup and pump-out March/April 2014

Cryostat Partial Warm-up Procedure (50K) Cryoplant in part load – start turbo pumps on cavity UHV and insulation vac Leave GHe return valve (cryostat pressure control valve) in auto mode Close LHe supply valve (cryostat level control valve) – manual mode Bring cryostat heater to 120W output to boil off LHe and warm up cavity When cryostat is empty cavity vacuum pressure will start to increase Turn off cavity ion pumps When cavity pressure is 1 order of magnitude above turbo pressure (~30min) Open valves to turbos After cavity temp reaches 50K follow cool-down procedure to re-cool cavity Refill cryostat Takes about 12 hours to complete

The CLS SRF Cryo System

Thales Electron Devices TH20536C Window Specification (T.E.D. drawing)

N2 Waveguide Leak at RF Window (T.E.D. drawings)