Topic 3 Infrastructure Maintenance & Rehabilitation Session 05-07 Matakuliah: S0902 – Manajemen Infrastruktur Tahun: 2010.

Slides:



Advertisements
Similar presentations
Preparing the System Proposal Chapter 13 Topics: –Systems proposal –Determining hardware needs –Determining software needs –Decision to rent, lease, or.
Advertisements

ITIL: Service Transition
Lecture(4) Measurement of System performance Infrastructure performance measurement Infrastructure performance measurement must be multidimensional,
Lecture(1) Instructor : Dr. Abdelmajid Nassar Civil Engineering Dept. Master Program Civil Engineering Dept. Master Program
Lecture(4) Instructor : Dr. Abed Al-Majed Nassar
1 Pertemuan 14 Perencanaan, Desain dan Administrasi Databases Matakuliah: >/ > Tahun: > Versi: >
PAVEMENT MANAGEMENT SYSTEMS OVERVIEW Lecture 2. n Provide a historical perspective of the evolution of PMS over the last 20 years n Describe the basic.
IT Governance: Simultaneously Empowers and Controls Source: IT Governance, Chapter 1.
Pertemuan Matakuliah: A0214/Audit Sistem Informasi Tahun: 2007.
PRIORITIZATION.
Session 141 Vulnerability to a natural hazard can be defined as to the extent to which people will experience harm and property will be damaged from that.
NGEC - SFTF Structure and Finance Task Force Eric Curtit, MODOT Section 6 Project Update.
Lecture(3) Instructor : Dr. Abed Al-Majed Nassar
Design, Implementation and Maintenance
Capital Improvement Programming Local Government Academy June 5, 2008 Marcia Taylor Mt. Lebanon.
What is Business Analysis Planning & Monitoring?
FOOD ENGINEERING DESIGN AND ECONOMICS
Topic 2 Infrastructure Planning Session Matakuliah: S0902 – Manajemen Infrastruktur Tahun: 2010.
Role and Components of Project Evaluation
Strategic Capacity Planning for Products and Services Copyright © 2015 McGraw-Hill Education. All rights reserved. No reproduction or distribution without.
Historic Rehabilitation Tax Credits Federal Incentives for Preservation.
S/W Project Management
Long Range Infrastructure Planning The Gilbert, Arizona Experience Kenneth C. Morgan, PE Public Works Director.
PEIP National workshop in Montenegro: developing environmental infrastructure projects in the water sector Feasibility Study Preparation Venelina Varbova.
Investment Portfolio Methodologies Pertemuan Matakuliah: A Strategi Investasi IT Tahun: 2009.
1 RHD Cost Sharing Review Update 2011 UBCM Convention Presented by RHD Cost Sharing Review Implementation Group September 26, 2011.
IRSN STRATEGY TO ASSESS A NEW MAINTENANCE POLICY / Nesebar, Bulgaria Presented by Naoëlle MATAHRI, IRSN.
Considering the Costs of MUS Interventions. Direct Costs v. Opportunity Costs Direct Costs Expenditures and investments to achieve a particular outcome.
HSA 171 CAR. 1436/ 7/4  The results of activities of an organization or investment over a given period of time.  Organizational Performance: ◦ A measure.
Office of Facilities Deferred Maintenance UTSA Strategic Resource Planning Council Deferred Maintenance UTSA Strategic Resource Planning Council March.
National Highway Institute Federal Highway Administration
Project preparation and appraisal. Preparation of project report and appraisal are intimately tied up.
Jeff’s slides. Transportation Kitchener Transportation Master Plan Define and prioritize a transportation network that is supportive of all modes of.
Life Cycle Cost Model Update Preliminary Report Joint Legislative Audit & Review Committee January 4, 2007 Stephanie Hoffman and Keenan Konopaski.
PROJECT MANAGEMENT. A project is one – having a specific objective to be completed within certain specifications – having defined start and end dates.
October 22, 2004 Holistic Asset Management – It’s Not an Isolated Function 2004 Urban Water Council US. Conference of Mayors.
The Relational Model Pertemuan 03 Matakuliah: M0564 /Pengantar Sistem Basis Data Tahun : 2008.
PAVEMENT MAINTENANCE 1: Part 1: Pavement Preservation Idaho Roads Scholar Program.
Risk Management & Corporate Governance 1. What is Risk?  Risk arises from uncertainty; but all uncertainties do not carry risk.  Possibility of an unfavorable.
The Secretary of the Interior’s Standards for Historic Preservation.
Competing For Advantage Chapter 4 – The Internal Organization: Resources, Capabilities, and Core Competencies.
Project quality management. Introduction Project quality management includes the process required to ensure that the project satisfies the needs for which.
BSBPMG501A Manage Project Integrative Processes Manage Project Integrative Processes Project Integration Processes – Part 1 Diploma of Project Management.
GOS Economic Model (GEM) Overview Uses the same underlying simulation software (Stella) which was used in developing TNM Economic Model (NB-Sim) Provides.
Project Management: A Managerial Approach Chapter 13 – Project Termination.
JOHANNA STREET, ARCHITECT HISTORIC PRESERVATION. JOHANNA STREET, ARCHITECT Background History of historic preservation –Eugene Emmanuel Viollet-le-Duc.
The Second Annual Medical Device Regulatory, Reimbursement and Compliance Congress Presented by J. Glenn George Thursday, March 29, 2007 Day II – Track.
A Blue Print for Collecting School Facilities Data.
Restoration is defined as the act or process of accurately depicting the form, features, and character of a property as it appeared at a particular period.
Matakuliah: D0762 – Ekonomi Teknik Tahun: 2009 Replacement Analysis Course Outline 10.
Lecture(3) Sequence of Studies for a Single Major – Infrastructure Projects 1 A preliminary (or reconnaissance) report. 2 A feasibility report.
Maintainance and Reliability Pertemuan 26 Mata kuliah: J Manajemen Operasional Tahun: 2010.
UNIT No. 3 Capital Budgeting Nature Significance Technique of Capital Budgeting Pay back Method Accounting Rate of Return Net Present Value Profitability.
Logical Framework Approach 1. Approaches to Activity Design Logical Framework Approach (LFA) – Originally developed in the 1970s, this planning process.
Business Intelligence Pathway Method 5 th Meeting Course Name: Business Intelligence Year: 2009.
Retrofitting and Maintenance. Regular Maintenance is Necessary Failure to Perform Maintenance Leads to….. Diminished Performance Deterioration Failure.
The Secretary of the Interior’s Standards for the Treatment of Historic Properties Building 1051 (FAI-00456) Building 1555 (FAI-00467)

 System Requirement Specification and System Planning.
Road Investment Decision Framework
Module 13 Reliability 1. Key Dimensions of Quality Performance – primary operating characteristics Features – “bells and whistles” Reliability – probability.
Executive Information Systems and the Data Warehouse Pertemuan 8
ITIL: Service Transition
Multi-Year Programming and Predictive Modelling
Maintenance Scheduling
(Additional materials)
Life Cycle Cost Analysis
Quality Management Systems – Requirements
FTI Consulting Infrastructure Public/Private Partnerships
Capital Improvement Plans
Presentation transcript:

Topic 3 Infrastructure Maintenance & Rehabilitation Session Matakuliah: S0902 – Manajemen Infrastruktur Tahun: 2010

Bina Nusantara University 3 Learning outcomes Mahasiswa dapat menghubungkan pemeliharaan dan perbaikan infrastruktur terkait dengan aspek- aspek yang mempengaruhi dalam upaya keberlanjutannya.

Bina Nusantara University 4 Mind Map ( Topic 3 )

Bina Nusantara University 5 Contents Maintenance Rehabilitation Infrastructure Alternatives

Maintenance  The action of keeping in effective condition, in working order, in repair ; deals with the specific procedures, tasks, instructions, personnel, qualifications, equipments and resources needed to satisfy the maintainability req. within a specific use environment. {Hudson,Infrastructure Management p.221]

Maintenance  Is that set of activities required to keep a component, system, infrastructure asset, or facility functioning as it was originally designed and constructed to function [Hudson,Infrastructure Management p.221]

Maintenance Subset of maintenance : [Hudson,Infrastructure Management p.231] 1.Preventive Maintenance 2.Corrective Maintenance 3.Routine Maintenance 4.Hard – time Replacement 5.On-condition Maintenance 6.Critical maintenance

Maintenance Relationship between subset maintenance as shown Corrective or Reactive Maintenance Hudson,Infrastructure Management p.232] Preventive or Proactive Maintenance On-condition Maintenance On-condition Maintenance Hard-Time Replacement Routine Maintenance

Subset of maintenance : 1.Preventive Maintenance : ( proactive maintenance ) is performed to retard or prevent deterioration or failure of a component or system 2. Corrective Maintenance : ( reactive maintenance ) is performed to repair damage and/or to restore infrastructure facilities to satisfactory operation, or function after failure

Maintenance Subset of maintenance : 3. Routine Maintenance : is any maintenance done on a regular basis or schedule. It is generally preventative in nature, but may be corrective. 4. Hard – time Replacement : ( HTR ) is replacement after a certain length of time, regardless of whether the component has failed or not. It is therefore a type of routine maintenance, but may also be corrective or preventive

Maintenance Subset of maintenance : 5. On-condition Maintenance : ( OCM ) is any maintenance done in response to condition- monitoring actions indicating impending deterioration or failure. By definition it is a type of preventive maintenance 6. Critical maintenance : is defined by some as the maintenance that must be done immediately to prevent imminent collapse or functional failure

Maintenance Maintenance standards treatments : 1.Preservation 2.Rehabilitation 3.Restoration 4.Reconstruction

Maintenance Preservation  the act or process of applying measures necessary to sustain the existing form, integrity and materials of historic property

Maintenance Restoration  the act or process of accurately depicting the form, features and character of property as it appeared at a particular period of time

Maintenance Reconstruction  the act or process of depicting by means of new construction the form, features and detailing of a non-surviving site, landscape, building, structure or object, for the purpose of replicating its appearance at a specific period of time and in its historic location.

Rehabilitation Rehabilitation : The act or process of making possible a compatible uses for a property through repair, alterations, and additions, while preserving those portions or features that convey its historical, cultural, or architectural values. [Hudson,Infrastructure Management p.233]

Rehabilitation Key ideas of Rehabilitation : [Hudson,Infrastructure Management p.233] 1. Use the property as it was used historically, or find a new use that minimize retention of distinctive features

Rehabilitation Key ideas of Rehabilitation : [Hudson,Infrastructure Management p.233] 2. Preserve the historic character. Do not make changes that falsify the historical development

Rehabilitation Key ideas of Rehabilitation : [Hudson,Infrastructure Management p.233] 3. Repair deteriorated features. Replace a severely deteriorated feature with a matching feature ( eg substituted materials )

Rehabilitation Key ideas of Rehabilitation : [Hudson,Infrastructure Management p.233] 3. Repair deteriorated features. Replace a severely deteriorated feature with a matching feature ( eg substituted materials )

Infrastructure Alternatives Infrastructure planning involves multiple ideas Infrastructure planning involves multiple tasks Infrastructure planning involves the identification of alternatives Infrastructure planning involves the comparison of alternatives

Infrastructure Alternatives Methods for comparing and Prioritizing [Goodman. Infrastructure Planning Handbook p 6.2] Simple cost basis : –Construction cost –Investment cost –Annual Cost –Cost per unit of constructed infrastructure –Cost per unit of services or output –Present, future and annual value of a stream of costs over a specific period of service for an infrastructure facility

Infrastructure Alternatives Methods for comparing and Prioritizing [Goodman. Infrastructure Planning Handbook p 6.2] Simple cost basis plus consideration of other Specified engineering factor, including : –Length of useful life –Quality of construction and durability of facilities –Associated problems of maintenance and operation –Susceptibility to unforeseen problems of construction, maintenance and operation –Flexibility of facilities for expansion and/or replacement in the future

Infrastructure Alternatives Methods for comparing and Prioritizing [Goodman. Infrastructure Planning Handbook p 6.2] Life cycle cost basis ( Present value basis ) : –Costs only –Costs offset by savings to beneficiaries of facilities –Costs offset by savings ang by values of other types of benefits

Infrastructure Alternatives Methods for comparing and Prioritizing [Goodman. Infrastructure Planning Handbook p 6.2] Cost basis including adjustment made for additional screening criteria: –Adjustment of estimates made by others of cost, capacity and output –Adjustment of estimates made by others to reflect sponsor’s special requirement –Adjustment of estimates made by others to reflect analyses of local and regional infrastructure system

Infrastructure Alternatives Methods for comparing and Prioritizing [Goodman. Infrastructure Planning Handbook p 6.2] Additional preliminary cost-driven methodologies for state and local infrastructure system: –Routine maintenance and replacement decisions based upon engineering judgments as to a priorities and the availability of fund –Analyses based upon cost-effectiveness –Comparison of alternatives based upon additional measure of performance incl. effectiveness in providing services, reliability and cost

Infrastructure Alternatives Methods for comparing and Prioritizing [Goodman. Infrastructure Planning Handbook p 6.2] Full Financial Analyses: –Development of arrangements to implement project, with term and conditions of financing. –Cost per unit of services product, and comparison with existing market prices and with willingness and ability to pay –Annual years analyses of all monetary input and output at market prices with inflation effect and subsidies.

Infrastructure Alternatives Methods for comparing and Prioritizing [Goodman. Infrastructure Planning Handbook p 6.2] Economic Analyses ( or benefit cost analyses): –Year by year analyses off all cost and benefits in which monetary amounts are in terms of their economic values –Extended analyses that consider regional benefits that are in addition to direct benefits to users of project services and product

Infrastructure Alternatives Methods for comparing and Prioritizing [Goodman. Infrastructure Planning Handbook p 6.2] Multi Dimensional Analyses: –Matrices, account of several categories for considering multiple attributes of alternatives –Display techniques that consider broad multiple objectives

Infrastructure Alternatives Methods for comparing and Prioritizing [Goodman. Infrastructure Planning Handbook p 6.2] Multi Dimensional Analyses: –Mathematical model and methods designed to consider trade-off and produce an optimum alternative –Other decision-oriented methodologies such as AI ( Artificial Intelligence) based method or AHP ( Analytical Hierarchy Process )

Infrastructure Alternatives Methods for comparing and Prioritizing [Goodman. Infrastructure Planning Handbook p 6.2] Special Studies: –Government agency formal protocol to perform the planning functions of identification, preliminary screening of alternatives

Infrastructure Alternatives Methods for comparing and Prioritizing [Goodman. Infrastructure Planning Handbook p 6.2] Special Studies: –Regional simulations and other types of system analyses having outputs in such terms as economic impact and/or degrees of attainment of specified goals or objectives