Extended Reach Drilling and Completion Solutions in Deepwater Drilling Challenges in Deepwater ERD.

Slides:



Advertisements
Similar presentations
SPE Getting the Most out of Networked Drillstring Petersen, Sui, Frøyen, Nybø Center for Integrated Operations in the Petroleum Industry & SINTEF.
Advertisements

Broadband Networked Drill String Unlocks Operational Performance Potential by Transmitting Downhole Measurements in Real Time Authors: Daan Veeningen,
* Formed in 2003, Payzone Surveying has progressed from developing the original v1.1.1 of our software package and running extensive field trials. Formed.
Chapter 5 HORIZONTAL DRILLING.
MANAGED PRESSURE DRILLING PRESENTATION ______________________________________________________________________ A Continuous Circulating Concentric Casing.
Environmental Drilling By: Josh Humphreys October 8,2006.
Petroleum Engineering 406
Innovations in drilling DAP 2015
PETE 411 Drilling Engineering
Lesson 20 Abnormal Pressure
Lesson 14 Jet Bit Nozzle Size Selection
Drilling Engineering – PE 311 Drill Bit Optimization
Chapter 5 Drilling Techniques and Drilling Problems
Instrumented Surface Sub DOE Project (DE-FC26-03NT41782)
PETE 411 Well Drilling Lesson 5 Hole Problems.
GEOTHERMAL DRILLING James C. Witcher Witcher and Associates
ATMATM PETE 406 UBD ATMATM ATMATMATMATM PETE Underbalanced Drilling, UBD Lesson 9 Benefits of Underbalanced Drilling UDM - Chapter 3.
PETE 203 DRILLING ENGINEERING
Inflatable DST Equipment An Overview Presentation.
INFLATABLE DST EQUIPMENT
Optimising Hydraulic Energy to Dramatically Improve Lateral Reach.
Petroleum Engineering 411 Well Drilling
Lesson 36 Torque and Drag Calculations
Integrated Drilling and Logging Program Approach in HPHT Environment: Successful Drilling of Deepwater Oberan Field, Nigeria, ENI Deepest Well in Deep.
INNOVATIONS IN DRILLING DAP 2015 MAARTEN MIDDELBURG FEBRUARY 25, 2015 DELFT.
Fundamentals of Onshore Drilling
Lesson 34 Horizontal Drilling
Introduction to Directional Drilling
Drilling Engineering – PE311 Rotary System
Lesson 4 Drilling Cost & Drilling Rate
Confidential to SMD JIP
Chapter 1 RESERVOIR.
Lesson 25 Well Control, cont’d
Drilling String Design
Offshore Drilling Operations Jeff Bugden Canada-Newfoundland Offshore Petroleum Board.
Lesson 15 Surge and Swab Pressures
Dual Gradient Drilling Basic Technology Confidential to DGD JIP
WELL PROBLEMS.
Session 5: CASING DRILLING®
Well Design PE 413.
1 Petroleum Engineering 406 Lesson 13 Shallow Water Flows.
Pressure and Speed Limits
Drilling Operations History Drake’s Well was the first commercial oil well drilled in 1859 in Pennsylvania. Cable Tool Drilling technique was used to drill.
Performance Through Engineering Extended Reach/Horizontal Drilling Solutions EXTENDED REACH / HORIZONTAL DRILLING.
Dual Gradient Drilling Basic Technology
FILE: EXTREACH2 -A Wellsite Perspective-
Petroleum Engineering 406 Lesson 4 Well Control. Read Well Control Manual –Chapter 9 Homework 2 Due Feb. 3, 1999.
Case Study – Foothills Region, Canada 2008 CASING DRILLING TM Plastering Success 9-5/8” casing x 12-1/4” EZCase drilled from 850 M to 1,250 M CD effectively.
TAMU-Petroleum Engineering
Directional Drilling and Deviation Control
Chapter 5 Drilling Techniques and Drilling Problems
The Original Drilling Fluids Company™ 2012 Baroid IDP Basic Drilling Fluids Workshop Introduction to Drilling Fluids.
Lesson 21 Prediction of Abnormal Pore Pressure
Confidential to Subsea Mudlift Drilling JIP11/6/00DGD Template 1 of 64 Dual Gradient Drilling Basic Technology Lesson 1 Introduction to DGD Jerome J. Schubert.
Schlumberger / Client Confidential
Well Development and Efficiency Groundwater Hydraulics Daene C. McKinney.
TRIBOLOGY IN DRILLING OPERATION CHIH LIN, PHD AUGUST 29, 2013.
Overview of Petroleum Industry Chapter 4B – Drilling Operations
Drilling & Measurements (D&M)
INSTRUCTOR © 2017, John R. Fanchi
Cementing How it is Done
Lesson 33 Directional Drilling
Straight Hole ? "There's no such thing as a straight hole." All wells, whether by accident or by design, exhibit changes in hole angle and direction.
Requirements and Challenges Extended Laterals
Angles. Angles Angles Angles The distance from rotary table to Point B as measured along the wellbore is called a measured depth. The vertical distance.
Coal Bed Methane Cementing Best Practices
Design, Testing and Modeling of Axial Oscillation Tools
Finding the Optimum BHA through Data Analytics & Modeling
Presentation transcript:

Extended Reach Drilling and Completion Solutions in Deepwater Drilling Challenges in Deepwater ERD

Extended Reach Drilling and Completion Solutions in Deepwater Drilling Challenges Long displacements Long open hole sections Hole stability issues Directional control and surveying practices ECD management Risk - cost of failure Continuous improvement to reduce cost Comprehensive contingency planning

Extended Reach Drilling and Completion Solutions in Deepwater Technical Keys to Success Planning Mud lubricity Modeling Drillstring design Wellbore stability Hole cleaning Fit for purpose drilling tool

Extended Reach Drilling and Completion Solutions in Deepwater Planning Optimization of directional well profile Terminal angle considerations –wellbore stability –completions /casing running Achievable build rates in soft unconsolidated formations Gradual angle-build approach provides: –significant torque reduction –improved sliding –improved tubular running

Extended Reach Drilling and Completion Solutions in Deepwater Mud Lubricity Complex issue affected by: –formation– hole cleaning –wellbore stability– cutting bed –filter cake– tortuosity, etc... In most projects OBM chosen for: –lubricity –inhibition properties Lubricants: little effect Biggest impact: oil/water ratio

Extended Reach Drilling and Completion Solutions in Deepwater Modeling T&D and hydraulics from PowerPlan drives rig selection Bit torque (dynamic conditions) difficult to predict –downhole WOB&TRQ measurements Friction coefficients calculated from offset data and real time data Engineering subroutines to read MWD data every foot, for monitoring of: –downhole torque/drag –wellbore stability –hole cleaning

Extended Reach Drilling and Completion Solutions in Deepwater Drillstring Design S135 drillpipe usually standard Strict control on –quality –material specifications –inpections Special thread compounds –nonheavy metal –high torque Double-shouldered tool joints: –7 1/2-in. for 5 7/8-in. drillpipe –40 to 60 % higher capacity

Extended Reach Drilling and Completion Solutions in Deepwater Hole cleaning Primary parameter: flow rate Models used to optimize flow rate High rpm (above 120): –no obvious benefits –leads to shocks and vibrations Alternating hi/low viscosity tandem pills can be useful Downhole weight/torque and APWD: –monitor hole cleaning effectiveness –rotating friction factor and drag Must circulate till cuttings removal complete

Extended Reach Drilling and Completion Solutions in Deepwater Fit for Purpose Drilling Tools Forward planning of signal transmission and detection is required Cost of failures high  Select proven reliable tools High flow rate specification tools 2-D Rotary Steerable 3-D Rotary Steerable Real time drilling solutions

Extended Reach Drilling and Completion Solutions in Deepwater PowerPak Motors Over 50 models from 2 1/8 in. to 11 1/4 in. PowerPak XP & GT extended power sections High flow versions: A700 rated to 1000 gpm Working on A975 capable of 2000 gpm

Extended Reach Drilling and Completion Solutions in Deepwater At Bit Inclination Measurement (AIM*) Single axis inclination sensor 200hr+ operating time Wireless telemetry Available from 5-7/8” to 26” hole sizes

Extended Reach Drilling and Completion Solutions in Deepwater Power Drive PowerDrive 900 PowerDrive 675 World Record reach m MD Maximum dogleg capability - 8 °/30 m

Extended Reach Drilling and Completion Solutions in Deepwater Power Drive - Direct

Extended Reach Drilling and Completion Solutions in Deepwater MWD Technology Flexible frequency control for max. signal strength World record depth reached m MD Flexible data frame format Two-way communication saves trips Continuous surveys save rig time High LCM tolerance-50 lbm/bbl medium nut plug High flow rate options 9 1/2-in.  2000 gpm 6 3/4-in  1000 gpm

Extended Reach Drilling and Completion Solutions in Deepwater Increase Drillstring and Bit Life BHA whirling in vertical hole Multi axis shocks Reduce drillstring fatigue Reduce borehole enlargement Increases ROP/bit life Larger shocks result in more shock counts

Extended Reach Drilling and Completion Solutions in Deepwater Accurate control of ECD Modeled vs. Actual ECD Key for Deepwater drilling Detect shallow water flows Detect cuttings loading and swab/surge effects Manage the pore pressure fracture grad window Minimize mud weight for optimum ROP Incorporated into ARC High flow options ARC6  800 gpm ARC 8 &9  1950 gpm

Extended Reach Drilling and Completion Solutions in Deepwater Preliminary Planning

Extended Reach Drilling and Completion Solutions in Deepwater Quality Control Date Drawn:01-Mar-2000 Drawn by: W.G. Lesso, Jr Checked by: uncontrolled Client OK: ______________ Astrid Marlin Gabon Displacement Review Surface Location Lat: N Lon: E North: m East: m Grid Conv: ° Scale Fact: Magnetic Parameters Model: BGGM 1999 Dip: ° Mag Dec: ° Date: February 29, 2000 FS: nT New Structure STRUCTURE AF Gabon Total FIELD New Well WELL TotalFina TD 5994 MD Build 3.00°/30 m Hold Angle 78° EOC 3880 MD KOP Seafloor 0° 2500 MD 9 5/8'' csg 78° 4070 MD 13 3/8'' csg 0° 3100 MD 20'' csg 0° 2800 MD Vertical Section View True Vertical Depth (1 cm = 200 meters) Vertical Section Departure at 0. (1 cm = 200 meters)

Extended Reach Drilling and Completion Solutions in Deepwater DrillSAFE Tripping Loads Analysis 8 1/2” bit at TD 5994m (19665 ft) 40% 20% 40% 0%

Extended Reach Drilling and Completion Solutions in Deepwater Possible Casing Schedule with Pressure Gradients FPG PPGp (1010) PPGp (950)

Extended Reach Drilling and Completion Solutions in Deepwater Challenges ECD limiting factor Solutions: –Improve mud properties,lower the rheology –Use 5 1/2” or 5 7/8” Drillpipe –Extra casing string for contingency Under reamers or Bicenter bits

Extended Reach Drilling and Completion Solutions in Deepwater

Summary Well design will require in-depth studies of: –Drilling fluid requirements –Borehole stability limitations –ESD and ECD characteristics –Well control and kick tolerance These factors along with completion and target requirement will determine the technical limits for the ultimate reach capabilities