P5 recommendation on Tevatron running Report of June 8 meeting FNAL.

Slides:



Advertisements
Similar presentations
Low Mass Standard Model Higgs Boson Searches at the Tevatron Andrew Mehta Physics at LHC, Split, Croatia, September 27th 2008 On behalf of the CDF and.
Advertisements

2 nd International Conference on Technology and Instrumentation in Particle Physics Chicago June 8 th – 14 th 2011 Operational experience and aging studies.
B. List, ETH Zürich Page 1 Report from H1: PRC Open Session, H1: Status and Prospects Benno List Institute for Particle Physics, ETH Zürich.
Muon g-2 and SLAC Detector Test T-519 Momentu m Spin e David Hertzog University of Washington.
ISL David Stuart, UC Santa Barbara May 11, 2006 David Stuart, UC Santa Barbara May 11, 2006.
Status & Goals of LHC 1 1pb-1 of delivered and recorded luminosities reached! As of this morning: Delivered: 1420 nb-1 Recorded: 1245 nb-1 New record Inst.
Silicon Tracking for Forward Electron Identification at CDF David Stuart, UC Santa Barbara Oct 30, 2002 David Stuart, UC Santa Barbara Oct 30, 2002.
Sensors for CDF RunIIb silicon upgrade LayerR min (cm)1 MeV eq-n cm * * * * * *10.
ATLAS detector upgrades ATLAS off to a good start – the detector is performing very well. This talk is about the changes needed in ATLAS during the next.
F UEC - 6 Oct 06 Recent FNAL Collider Operations Ron Moore Fermilab – Tevatron Dept.
The SLHC and the Challenges of the CMS Upgrade William Ferguson First year seminar March 2 nd
CDF perspectives and Computing needs KISTI, Dec 5 th 2008 DongHee Kim.
Lukens - 1 Run IIb Project Motivations Integrated luminosity or duration of the run motivates us to  Replace the silicon detector - Radiation damage to.
Alexander Khanov 25 April 2003 DIS’03, St.Petersburg 1 Recent B Physics results from DØ The B Physics program in D Ø Run II Current analyses – First results.
Nick Hadley Run II Physics (I) Nick Hadley The University of Maryland New Perspectives 2000 Fermilab - June 28, 2000.
Scientific Highlights : CDF Experiment 1.Introduction 2.CDF Run-II detector 3.Phyiscs highlights B Physics, Top, Higgs, … to be continued by Rob October.
CDF Detector Operations Budget and Resource Planning Rob Roser IFC Meeting October 17,
W properties AT CDF J. E. Garcia INFN Pisa. Outline Corfu Summer Institute Corfu Summer Institute September 10 th 2 1.CDF detector 2.W cross section measurements.
Radiation Damage in the CMS Strips Tracker Christian Barth on behalf of the CMS Tracker Collaboration.
June 28, 2002BEACH2002 B Physics at the Tevatron B Physics at the Tevatron Jack Cranshaw Texas Tech University For the CDF and D0 Collaborations.
CDF Experiment in JFY2002 Shin-Hong Kim (University of Tsukuba) May 30, 2003 at KEK.
F All Experimenters' Mtg - 28 Jul 03 Week in Review: 07/21/03 –07/28/03 Keith Gollwitzer – FNAL Stores and Operations Summary Standard Plots.
Collider Detector at Fermilab Sung-hyun chang High Energy Physics lab. KNU.
KIRTI RANJANDIS, Madison, Wisconsin, April 28, Top Quark Production Cross- Section at the Tevatron Collider On behalf of DØ & CDF Collaboration KIRTI.
FNAL Users’ Meeting, 06/02/03, p. 1 Top and Electroweak Results from CDF Igor Volobouev LBNL for the CDF Collaboration.
Dmitri Denisov D0 Weekly Summary: August 18 to August 24  Delivered Luminosity and operating efficiency u Delivered 6.9pb -1 u Recorded 6.0pb -1 (87%)
7 Feb 2005T. Yasuda, Fermilab D0 Status Report 2/7/2005 Taka Yasuda Fermilab.
All Experimenters' Mtg - Aug. 04, 2003 Week in Review: 07/28/03 –08/03/03 Doug Moehs – FNAL Stores and Operations Summary Standard Plots.
June 15, 2002David Finley to Aspen PAC Slide 1 Report on 132 nsec Operation Report to the Fermilab.
Tevatron II: the world’s highest energy collider What’s new?  Data will be collected from 5 to 15 fb -1 at  s=1.96 TeV  Instantaneous luminosity will.
Vertex ‘99, 6/21-25/1999 p. 1 CDF Run II SiliconAlan Sill, Texas Tech University CDF Run II Silicon Tracking Projects 8th INTERNATIONAL WORKSHOP ON VERTEX.
All Experimenters MeetingDmitri Denisov Week of July 7 to July 15 Summary  Delivered luminosity and operating efficiency u Delivered: 1.4pb -1 u Recorded:
Electroweak and Related Physics at CDF Tim Nelson Fermilab on behalf of the CDF Collaboration DIS 2003 St. Petersburg April 2003.
DPF2000, 8/9-12/00 p. 1Richard E. Hughes, The Ohio State UniversityHiggs Searches in Run II at CDF Prospects for Higgs Searches at CDF in Run II DPF2000.
Fermilab Users Meeting June R.J. Tesarek Fermilab CDF 2002 Toward Physics Richard J. Tesarek Fermilab For the CDF Collaboration.
1 EPS2003, Aachen Nikos Varelas ELECTROWEAK & HIGGS PHYSICS AT DØ Nikos Varelas University of Illinois at Chicago for the DØ Collaboration
Roma, Riunione CSN1: Maggio 2004F. Bedeschi, INFN-Pisa 1/13 CDF  Stato del Tevatron  Stato del rivelatore  Upgrades in corso  Richieste finanziarie.
F Detector and Computing Operations Hugh Montgomery DOE Tevatron Operations Review March 27, 2007.
Searching for New Matter with the D0 Experiment Todd Adams Department of Physics Florida State University September 19, 2004.
All Experimenters MeetingDmitri Denisov Week of September 9 to September 16 D0 Summary  Delivered luminosity and operating efficiency u Delivered: 4.0pb.
All Experimenters MeetingDmitri Denisov Week of September 2 to September 8 D0 Summary  Delivered luminosity and operating efficiency u Delivered: 3.9pb.
Dmitri Denisov D0 Weekly Summary: May 4th to May 11th  Delivered Luminosity and operating efficiency u Delivered 7.3pb -1 u Recorded 6.3pb -1 (86%) 
May 14, 2001C.Rott1 The CMS Forward Pixel Detector Carsten Rott Purdue University May 14, 2001.
Physics Results from CDF and Prospects for a FY 2011 Run Kevin Pitts / University of Illinois DOE S&T Review of Scientific User Facilities June 30 – July.
Users' Mtg - 4 Jun 08 FNAL Accelerator Complex Status Ron Moore Fermilab – AD / Tevatron Dept.
Penny Kasper Fermilab Heavy Quarkonium Workshop 21 June Upsilon production DØ Penny Kasper Fermilab (DØ collaboration) 29 June 2006 Heavy Quarkonium.
DØ Beauty Physics in Run II Rick Jesik Imperial College BEACH 2002 V International Conference on Hyperons, Charm and Beauty Hadrons Vancouver, BC, June.
Kaori Maeshima Fermilab Jan. 12, University Evolution: Search in High Mass Dilepton Channel in CDF Pre Run I Run 1A, Run 1B, and Run II......
09 September 2010 Erik Huemer (HEPHY Vienna) Upgrade of the CMS Tracker for High Luminosity Operation OEPG Jahrestagung 2010.
F HCP 2007 Performance and Future of the Tevatron Ron Moore Fermilab - Tevatron Dept. Tevatron overview and performance Antiproton source + Recycler overview.
Energy Loss Simulation for the CDF Run II W Mass Measurement Tom Riddick University College London.
Run 2 Jets at the Tevatron Iain Bertram Lancaster University/DØ Experiment PIC2003  Inclusive Cross Section  Dijet Mass  Structure.
All Experimenters MeetingDmitri Denisov Week of July 22 to July 29 D0 Summary  Delivered luminosity and operating efficiency u Delivered: 3.1pb -1 u Live:
Dzero Collaboration Meeting, Sept. 14, M. DemarteauEric Flattum - Fermilab 1 Slide 1 Alice Bean Fermilab/University of Kansas for the D0 Run2b silicon.
A New Inner-Layer Silicon Micro- Strip Detector for D0 Alice Bean for the D0 Collaboration University of Kansas CIPANP Puerto Rico.
DOE REVIEW AUGUST 2006: CDF GROUP AT HARVARD MELISSA FRANKLIN - PROF JOAO GUIMARAES DA COSTA---PROF 25% SEBASTIAN GRINSTEIN - POST-DOC DANIEL SHERMAN -
Research Program Brendan Casey DOE Annual Program Review September
The Collider Detector at Fermilab (aka CDF) Jennifer Pursley Intermediate Seminar Oct. 28, 2003.
QWG Sept 20-22, Jundong Huang Indiana University 1 DØ Quarkonium Production at DØ Jundong Huang Indiana University Quarkonium Workshop FermiLab September.
Changes in delivered luminosity by varying the store length, using the luminosity projection model described in in Beams-doc-2022 Vaia Papadimitriou 30.
Tracking Upgrade R&D Meeting. Columbia University A. Seiden September 22, 2003.
Richard J. Tesarek Fermilab For the CDF Collaboration
Status of the CDF II silicon tracking system
Tevatron run issues with higher luminosity
Kevin Burkett Harvard University June 12, 2001
14 paesi, 62 universita’ e laboratori
Top Quark a particle odyssey Todd Huffman University of Oxford
News and Communications
Diego Tonelli Fermilab - for the CDF and DØ collaborations
LS 1 start date 12th June Schedule Extension 2012 run Extension of 2012 run approved by the DG on 3rd July 2012.
Presentation transcript:

P5 recommendation on Tevatron running Report of June 8 meeting FNAL

Charges Should the Tevatron run through the end of FY09 as currently planned? What are the factors and considerations which might lead to running beyond FY09?

Run through FY09? Will the accelerator deliver interesting level of integrated luminosity? Can the detectors handle the luminosity? Do the collaborations have the people to operate the detectors and analyze the data? Subject of June 8 meeting

Running beyond FY09 What is present reach and prospect for new discoveries?  Trigger issues  Endgame strategy Battling the sqrt N barrier--will a few more fb -1 matter?

Running beyond FY09 What is present reach and prospect for new discoveries?  Trigger issues  Endgame strategy Battling the sqrt N barrier--will a few more fb -1 matter? Might know more after analyses for Summer conferences Meet again in September to consider

Accelerator projections Close to present performance Driving indicators 25 mA/hr stacking > 100 store hours per week

D0 detector performance Basically running well, producing nice results Remaining issues for 09:  Silicon radiation damage  Fiber tracker occupancy

Silicon tracker Good to go for 09

Fiber tracker Beginning of store More typical

CDF Detector Running well, producing nice results Issues  Inner silicon radiation damage  Intermediate silicon cooling problem

Silicon radiation Integrated Luminosity (fb –1 ) Depletion Voltage (V) Central Prediction +1σ Prediction –1σ Prediction maximum bias voltage Bias Scan Data Model: S. Worm, Lifetime of the CDF Run II Silicon, VERTEX 2003 SVX Layer 0 Good to go through 09

ISL cooling goodbad hole Port card cooling ring Manifold Cooling Pipes Repair in Aug with “reverse angioplasty”

D0 people power 1--needs actuals

D0 people power 2- available = 60 or

CDF people power 1--needs CY 07CY 09 Detector Ops5651 Offline2620 Algorithms3221 Management10 Total for Ops * FTE’s

CDF people power 2-- available CY 07CY 09 Service Needs Resources Available Resources for Physics 392 – 124 = 268 FTE 134 FTE 

CDF people power 3-- expertise CommittedLikelyUnknown

Findings summary Accelerator running well and will likely deliver 6-7 fb -1 by end of FY09 CDF and D0 detectors running well, some issues for 09 but no show-stoppers CDF resources matched to needs through FY09 Concerns about D0 people power in FY09 Examine case for running beyond 09 at next P5 meeting (likely end of September)

Recommendations summary Tevatron should run through end of FY09 Lab should work with D0 to augment human resources  Visitors program is highly leveraged and cost- effective  Additional Applications Physicists?