DataGrid Applications Federico Carminati WP6 WorkShop December 11, 2000.

Slides:



Advertisements
Similar presentations
Fabric and Storage Management GridPP Fabric and Storage Management GridPP 24/24 May 2001.
Advertisements

Andrew McNab - Manchester HEP - 24 May 2001 WorkGroup H: Software Support Both middleware and application support Installation tools and expertise Communication.
Andrew McNab - Manchester HEP - 22 April 2002 EU DataGrid Testbed EU DataGrid Software releases Testbed 1 Job Lifecycle Authorisation at your site More.
Reporting of the Experiments Follow procedures set up for technical WP of EDG Spreadsheet report man month effort Pro-forma reply sheet Pro-forma sheet.
Andrew McNab - Manchester HEP - 2 May 2002 Testbed and Authorisation EU DataGrid Testbed 1 Job Lifecycle Software releases Authorisation at your site Grid/Web.
Status GridKa & ALICE T2 in Germany Kilian Schwarz GSI Darmstadt.
NIKHEF Testbed 1 Plans for the coming three months.
DataGrid is a project funded by the European Union 22 September 2003 – n° 1 EDG WP4 Fabric Management: Fabric Monitoring and Fault Tolerance
EU-GRID Work Program Massimo Sgaravatto – INFN Padova Cristina Vistoli – INFN Cnaf as INFN members of the EU-GRID technical team.
1 Software & Grid Middleware for Tier 2 Centers Rob Gardner Indiana University DOE/NSF Review of U.S. ATLAS and CMS Computing Projects Brookhaven National.
Cracow Grid Workshop, November 5-6, 2001 Towards the CrossGrid Architecture Marian Bubak, Marek Garbacz, Maciej Malawski, and Katarzyna Zając.
GRID DATA MANAGEMENT PILOT (GDMP) Asad Samar (Caltech) ACAT 2000, Fermilab October , 2000.
Workload Management Workpackage Massimo Sgaravatto INFN Padova.
Workload Management Massimo Sgaravatto INFN Padova.
LCG Milestones for Deployment, Fabric, & Grid Technology Ian Bird LCG Deployment Area Manager PEB 3-Dec-2002.
5 November 2001F Harris GridPP Edinburgh 1 WP8 status for validating Testbed1 and middleware F Harris(LHCb/Oxford)
Workload Management WP Status and next steps Massimo Sgaravatto INFN Padova.
Andrew McNab - Manchester HEP - 5 July 2001 WP6/Testbed Status Status by partner –CNRS, Czech R., INFN, NIKHEF, NorduGrid, LIP, Russia, UK Security Integration.
3 Sept 2001F HARRIS CHEP, Beijing 1 Moving the LHCb Monte Carlo production system to the GRID D.Galli,U.Marconi,V.Vagnoni INFN Bologna N Brook Bristol.
LCG and HEPiX Ian Bird LCG Project - CERN HEPiX - FNAL 25-Oct-2002.
CERN – Roberta Faggian Marque, Jan Fiete Grosse-Oetringhaus GRACE General Meeting, September 2004, Brussels 1 D6.1 Integration with the European DataGrid.
Grid Workload Management & Condor Massimo Sgaravatto INFN Padova.
A Grid Computing Use case Datagrid Jean-Marc Pierson.
1 st December 2003 JIM for CDF 1 JIM and SAMGrid for CDF Mòrag Burgon-Lyon University of Glasgow.
11 December 2000 Paolo Capiluppi - DataGrid Testbed Workshop CMS Applications Requirements DataGrid Testbed Workshop Milano, 11 December 2000 Paolo Capiluppi,
The Grid System Design Liu Xiangrui Beijing Institute of Technology.
Grid Workload Management Massimo Sgaravatto INFN Padova.
7April 2000F Harris LHCb Software Workshop 1 LHCb planning on EU GRID activities (for discussion) F Harris.
The ALICE short-term use case DataGrid WP6 Meeting Milano, 11 Dec 2000Piergiorgio Cerello 1 Physics Performance Report (PPR) production starting in Feb2001.
InterGrid Meeting 7 Oct 2001 Tony Doyle. Tony Doyle - University of Glasgow GridPP Status  Financial Background  Deliverables  Recruitment  Regional.
Quick Introduction to NorduGrid Oxana Smirnova 4 th Nordic LHC Workshop November 23, 2001, Stockholm.
First attempt for validating/testing Testbed 1 Globus and middleware services WP6 Meeting, December 2001 Flavia Donno, Marco Serra for IT and WPs.
Overall Goal of the Project  Develop full functionality of CMS Tier-2 centers  Embed the Tier-2 centers in the LHC-GRID  Provide well documented and.
10-May-01D.P.Kelsey, Security Workshop Summary1 DataGrid Security Workshop 29/30 March 2001 SUMMARY David Kelsey CLRC/RAL, UK
GridPP Presentation to AstroGrid 13 December 2001 Steve Lloyd Queen Mary University of London.
Early Thinking on ARDA in the Applications Area Torre Wenaus, BNL/CERN LCG Applications Area Manager PEB Dec 9, 2003.
CLRC and the European DataGrid Middleware Information and Monitoring Services The current information service is built on the hierarchical database OpenLDAP.
Dave Newbold, University of Bristol8/3/2001 UK Testbed 0 Sites Sites that have committed to TB0: RAL (R) Birmingham (Q) Bristol (Q) Edinburgh (Q) Imperial.
May http://cern.ch/hep-proj-grid-fabric1 EU DataGrid WP4 Large-Scale Cluster Computing Workshop FNAL, May Olof Bärring, CERN.
DataGRID PTB, Geneve, 10 April 2002 Testbed Software Test Plan Status Laurent Bobelin on behalf of Test Group.
Ruth Pordes November 2004TeraGrid GIG Site Review1 TeraGrid and Open Science Grid Ruth Pordes, Fermilab representing the Open Science.
Grid User Interface for ATLAS & LHCb A more recent UK mini production used input data stored on RAL’s tape server, the requirements in JDL and the IC Resource.
UK Grid Meeting Glenn Patrick1 LHCb Grid Activities in UK Grid Prototype and Globus Technical Meeting QMW, 22nd November 2000 Glenn Patrick (RAL)
6/23/2005 R. GARDNER OSG Baseline Services 1 OSG Baseline Services In my talk I’d like to discuss two questions:  What capabilities are we aiming for.
Report from the WLCG Operations and Tools TEG Maria Girone / CERN & Jeff Templon / NIKHEF WLCG Workshop, 19 th May 2012.
6 march Building the INFN Grid Proposal outline a.ghiselli,l.luminari,m.sgaravatto,c.vistoli INFN Grid meeting, milano.
David Foster LCG Project 12-March-02 Fabric Automation The Challenge of LHC Scale Fabrics LHC Computing Grid Workshop David Foster 12 th March 2002.
4/9/ 2000 I Datagrid Workshop- Marseille C.Vistoli Wide Area Workload Management Work Package DATAGRID project Parallel session report Cristina Vistoli.
November 27, 2001DOE/NSF review of US LHC S&C projects1 The Software and Computing Committee (SC2) in the LHC Computing Grid Project M Kasemann, FNAL.
LHC Computing, SPC-FC-CC-C; H F Hoffmann1 CERN/2379/Rev: Proposal for building the LHC computing environment at CERN (Phase 1) Goals of Phase.
CLRC Grid Team Glenn Patrick LHCb GRID Plans Glenn Patrick LHCb has formed a GRID technical working group to co-ordinate practical Grid.
Distributed Analysis Tutorial Dietrich Liko. Overview  Three grid flavors in ATLAS EGEE OSG Nordugrid  Distributed Analysis Activities GANGA/LCG PANDA/OSG.
LHCb Grid MeetingLiverpool, UK GRID Activities Glenn Patrick Not particularly knowledgeable-just based on attending 3 meetings.  UK-HEP.
Grid Activities in CMS Asad Samar (Caltech) PPDG meeting, Argonne July 13-14, 2000.
CERN 1 DataGrid Architecture Group Bob Jones CERN.
Dave Newbold, University of Bristol14/8/2001 Testbed 1 What is it? First deployment of DataGrid middleware tools The place where we find out if it all.
CMS Experience with the Common Analysis Framework I. Fisk & M. Girone Experience in CMS with the Common Analysis Framework Ian Fisk & Maria Girone 1.
EC Review – 01/03/2002 – F.Carminati – Accomplishments of the project from the end user point of view– n° 1 Accomplishments of the project from the end.
G. Russo, D. Del Prete, S. Pardi Kick Off Meeting - Isola d'Elba, 2011 May 29th–June 01th A proposal for distributed computing monitoring for SuperB G.
Grid Deployment Technical Working Groups: Middleware selection AAA,security Resource scheduling Operations User Support GDB Grid Deployment Resource planning,
14 June 2001LHCb workshop at Bologna1 LHCb and Datagrid - Status and Planning F Harris(Oxford)
Dave Newbold, University of Bristol21/3/2001 (Short) WP6 Update Where are we? Testbed 0 going (ish); some UK sites being tried out for production (mostly.
BaBar & Grid Eleonora Luppi for the BaBarGrid Group TB GRID Bologna 15 febbraio 2005.
LHCb computing model and the planned exploitation of the GRID Eric van Herwijnen, Frank Harris Monday, 17 July 2000.
Workload Management Workpackage
Regional Operations Centres Core infrastructure Centres
Data Challenge with the Grid in ATLAS
Fabric and Storage Management
Wide Area Workload Management Work Package DATAGRID project
Short to middle term GRID deployment plan for LHCb
Presentation transcript:

DataGrid Applications Federico Carminati WP6 WorkShop December 11, 2000

DataGrid WP6 Workshop 2 11 December 2000 The distributed computing model Assumptions Raw data will be kept at CERN – (backup if affordable) Tier 1 will have ~10% of raw data Reconstruction will be done at CERN (2 passes) ESD (aka DST) and TAG will be shipped to Tier1-2 Simulation will all be done in the Tier1-2, data will be shipped to CERN (in which form? Raw, ESD, AOD) The Tier1-2 will process ESD to produce AOD (formerly aka n- tuple) as many time as necessary, producing their own TAG Users will access the ESD/AOD/TAG remotely

DataGrid WP6 Workshop 3 11 December 2000 The distributed computing model Basic principle Every physicist should have in principle equal access to the data and to the resources The system will be extremely complex Number of components in each site Number of sites Different tasks performed in parallel: simulation, reconstruction, scheduled and unscheduled analysis

DataGrid WP6 Workshop 4 11 December 2000 WP 8 philosophy Define a common upper middle-layer of GRID services common to the 4 experiments Common API for common tasks File replica Job submission and monitoring …. Collaborate to define a common set of requirements and milestones, also with WP 9/10 Share the same testbeds and facilities for data challenges Introduce a user view in the project

DataGrid WP6 Workshop 5 11 December 2000 WP8 plans and requirements Testbed Release 0 (1Q 2001) A working, standard, installation of Globus, at CERN and at other labs. Standard recipes for file transfer and job submission (at CERN, this installation will probably be interfaced to LSF). A contact point for GLOBUS and later DataGRID software in each lab incase of problems A clear policy for "experiment-wide" authorisation to allow testing across national boundaries. This will only work if enough support is provided to users WP8 activities in general require to have a substantial part of the GRID services available since as soon as possible

DataGrid WP6 Workshop 6 11 December 2000 WP8 plans and requirements Testbed release 1 (3Q 2001) Distributed user autentication and resource allocation or pre- allocation, as dynamic allocation can come later. Distributed data dictionary (location of files on different servers). Basic network configuration, monitoring and diagnostic tools. Basic monitoring and diagnostic of a cluster of PC's. Distributed scheduling for the jobs that are submitted in a coordinated way (this does not include the "chaotic job activity" coming from isolated users which should be addressed in the subsequent release). Access to the basic information about job status and errors. Guidelines for configurating farms of PC's with fast disk access.

DataGrid WP6 Workshop 7 11 December 2000 WP8 plans and requirements Testbed release 2 (3Q 2002) Replica management and network optimised trasfer of data from different file systems. Tools for configurating farms of PC's with fast disk access, monitoring their status and for automathized s/w installation and management. A prototype of scheduling and load balancing for chaotic analysis jobs Basic functionality for dynamic resource allocation Basic functionality for job partitioning

DataGrid WP6 Workshop 8 11 December 2000 WP8 plans and requirements Testbed release 3 (3Q 2003) Scheduling and balancing of chaotic analysis Tools to ensure "robustness" and error recovery of the system

DataGrid WP6 Workshop 9 11 December 2000 WP8 Wkshop Nov 16 Conclusions WP8 non-experiment-specific personpower Needed to implement WP8 common policies CERN person identified and hired (I.Augustin) Should come from the funded contribution of each partner (CNRS, CERN, PPARC, NIKHEF and INFN) as a share of the 60 funded person-months A message sent to the PMB for each partner to identify this personpower

DataGrid WP6 Workshop December 2000 WP8 Wkshop Nov 16 Conclusions Two kinds of Test-bed participation. Formal participation defined by WP6 Informal commitment to install Datagrid provided tools, and participate in tests. Kick-start and Update kits Experiments to provide WP8 with installation and upgrade kits WP8 personpower will install them in the WP6 test-beds locations Kits have to coexist on the same machines without interference Locations participating but not in WP6 will provide their own personpower for the installation This activity will be coordinated by the CERN WP8 person (I.Augustin)

DataGrid WP6 Workshop December 2000 WP8 Wkshop Nov 16 Conclusions Collection of requirements Present WP8 requirements judged vague by other WP's (rightly!) Other WP's should have asked WP8/9/10 questions – they didn’t Meeting of December 1 st of the ATF was rather inconclusive New strategy: WP8-10 to produce a three tiered document Short term use cases Long term use cases General requirements WP8-10 also to produce pilot applications December 15 ATF should consolidate user requirements DataGRID Workshop on January 15 US experts invited to discuss user requirements and first proposition of architecture

DataGrid WP6 Workshop December 2000 WP8 Wkshop Nov 16 Conclusions Set up a technical WP8 technical WG one application software expert from each experiment and from ESA (WP9) and biology (WP10) the WP8 experiment-neutral personpower in the different partners (5 people) Chaired by the CERN WP8 person acting as WP8 architect)

DataGrid WP6 Workshop December 2000 WP8 Wkshop Nov 16 Conclusions Main tasks Help WP8 architect to collect the requirements from the experiment and ESA and Biology for the ATF Liaise with the Middleware WP's (1-5) regarding the services required by the applications, and the definition of the appropriate interfaces. Discuss WP8 architectural questions Do WP8-10 require a common 'upper middleware' layer over middleware services? Do they want to interface to generic middleware services directly? Definition of the 'sample' applications CMS and LHCb have existing running distributed applications ALICE is following and ATLAS will see whether it can add its Define requirements for the Test-bed and Networking

DataGrid WP6 Workshop December 2000 WP8 Wkshop Nov 16 Conclusions Main tasks (cont) Provide technical liaison with the Test-bed and Networking workpackages (e.g. attend their meetings) Special priority points are, for instance 1. Provision of Standard, Supported, Documented Globus installation kit 2. Definition of Test-bed sites and contact people 3. Definition of Certification system to be employed by the project Compact sub-group Will meet, virtually or in person, in its own right, preparing our point of view for the global Test-bed and Architecture meetings Experiment TB reps, unless the same person, would normally not attend, unless required for a forthcoming TB meeting The frequency of meetings decided by WP8 architect and coordinator.

DataGrid WP6 Workshop December 2000 Conclusions Activity of WP8 well started Main concerns are Architecture design seems to start with difficulty We do not have an architect yet Coordination with WP9-10 not yet very effective Need better communication with WP1-5 Need to start interacting more effectively with WP6-7