@ 2012, Cengage Learning Performance Evaluation Using Variances from Standard Costs LO 4 – Computing Factory Overhead Variances.

Slides:



Advertisements
Similar presentations
Chapter 11 Flexible Budgeting and the Management of Overhead and Support Activity Costs Chapter 11: Flexible Budgeting and the Management of Overhead and.
Advertisements

Chapter 15 Fundamentals of Variance Analysis Learning Objectives 4.Prepare and use a profit variance analysis. 2.Develop and use flexible budgets.
Copyright © 2008, The McGraw-Hill Companies, Inc.McGraw-Hill/Irwin Chapter Eleven Flexible Budgets and Overhead Analysis.
©2002 Prentice Hall Business Publishing, Introduction to Management Accounting 12/e, Horngren/Sundem/Stratton Flexible Budgets Distinguish between.
Cost Variances for Fixed and Variable Overhead Variances for Variable Overhead Variances for Fixed Overhead.
Flexible Budgets and Overhead Analysis Chapter 11.
Product Costing Break Normal Costing ACTG 321 Agenda for Lecture 6.
ACTG 321 Agenda for Lecture 14
Flexible Budgets and Overhead Analysis Chapter 11.
Copyright © 2006, The McGraw-Hill Companies, Inc.McGraw-Hill/Irwin Flexible Budgets and Overhead Analysis Chapter Eleven.
Flexible Budgets and Overhead Analysis 11/30/04 Chapter 11.
Using Variances under Standard Cost System
23 Performance Evaluation Using Variances from Standard Costs
Standard Costs and Balanced Scorecard
Budgeting and Standard Cost Systems Chapter 13. Budgeting A budget is a financial and quantitative plan for the acquisition and use of resources Use for.
8-1 Fundamental Managerial Accounting Concepts Thomas P. Edmonds Bor-Yi Tsay Philip R. Olds Copyright © 2009 by The McGraw-Hill Companies, Inc. All rights.
CHAPTER 8 Performance Evaluation. The McGraw-Hill Companies, Inc. 2008McGraw-Hill/Irwin 8-2 Learning Objective LO1 To describe flexible and static budgets.
© 2013 Cengage Learning. All Rights Reserved. May not be scanned, copied, duplicated, or posted to a publicly accessible website, in whole or in part.
Chapter 21 Flexible Budgets and Standard Costing.
Copyright © The McGraw-Hill Companies, Inc.McGraw-Hill/Irwin 11 th Edition Chapter 11.
Factory Overhead Planned, Applied & Actual
1 Click to edit Master title style Performance Evaluation Using Variances From Standard Costs 7.
11-1 Islamic University of Gaza Managerial Accounting Standard Costs and Balanced Scorecard Chapter 6 Dr. Hisham Madi.
Do other companies like BMW Group use manufacturing standards to guide performance at their plants? 1.Yes 2.No.
Ch.11 Exercises Norwall Company’s Flexible budget manufacturing overhead (in condensed form) is given below : The following information is available for.
Needles Powers Crosson Principles of Accounting 12e Standard Costing and Variance Analysis 24 C H A P T E R © human/iStockphoto.
Budgeting: The Basis for Planning and Control – Planning Developing objectives for acquisition and use of resources. – Control Steps taken by management.
Flexible Budget, Overhead Cost Variances and Management Control Lecture 19 1 Readings Chapter 8,Cost Accounting, Managerial Emphasis, 14 th edition by.
@ 2012, Cengage Learning Performance Evaluation Using Variances from Standard Costs LO 2 – Understanding How Standards are Used in Budgeting.
McGraw-Hill/Irwin Copyright © 2012 by The McGraw-Hill Companies, Inc. All rights reserved.
FLEXIBLE BUDGET Pertemuan 8 dan 9 Matakuliah: > Tahun: >
Use only with permission of Susan Crosson Chapter 9 Standard Costing and Variance Analysis Fall 2007 Crosson.
Standard Costing System Chapter 4 Managerial Accounting Concepts and Empirical Evidence.
Flexible Budgeting Chapter 07, 08
Flexible Budgets and Overhead Analysis Chapter 7.
1 Chapter 10. Standard Costs. M11-Chp-10-1-Standard-Costs Edited May 24, Copyright © 2011, Dr. Howard Godfrey This file contains illustrative.
Prepared by Diane Tanner University of North Florida Flexible Vs. Static Budgets Chapter 7.
Performance Evaluation and Using Variances Chapter M6.
AC239 Managerial Accounting Seminar 7 Jim Eads, CPA, MST, MSF Performance Evaluation Using Variances from Standard Costs 1.
© 2009 Factory Strategies Group LLC. All rights reserved. Manufacturing Cost Accounting Enterprise Excellence Series.
Standard Costing and Variance Analysis
Accounting Principles Using Excel for Success PowerPoint Presentation by: Douglas Cloud, Professor Emeritus Accounting, Pepperdine University.
AC239 Managerial Accounting Seminar 7 Jim Eads, CPA, MST, MSF Performance Evaluation Using Variances from Standard Costs 1.
Copyright © The McGraw-Hill Companies, Inc.McGraw-Hill/Irwin 11 th Edition Chapter 11.
Flexible Budgeting and Analysis of Overhead Costs CHAPTER 11 Copyright © 2015 McGraw-Hill Education. All rights reserved. No reproduction or distribution.
AC239 Unit 7 Chapter 23 Performance Evaluation Using Variances from Standard Costs.
Part 1 Study Unit 7 Review Jim Clemons, CMA.
Chapter 17 Inventory & Control What we will cover: n Standard costs n Variance Analysis.
Flexible Budgets Static Budget Based on estimate of sales and production levels Compare costs associated with actual production to costs for budgeted production.
Chapter 17 Overhead Cost Management Flexible Budgets.
C Cengage Learning. All Rights Reserved. May not be copied, scanned, or duplicated, or posted to a publicly accessible website, in whole or in part.
Chapter 23 Flexible Budgets and Standard Cost Systems Demonstration Problems © 2016 Pearson Education, Inc.23-1.
25-1 Both standards and budgets are predetermined costs, and both contribute to management planning and control. There is a difference:  A standard is.
Variance Analysis: Manufacturing Overhead
Production Cost Variance Analysis
Predetermined Overhead Rates and Overhead Analysis in a Standard Costing System Appendix 8A.
Predetermined Overhead Rates and Overhead Analysis in a Standard Costing System Appendix 10A.
Flexible Budgets and Overhead Analysis
Flexible Budgets and Overhead Analysis
Power Notes Chapter M6 Performance Evaluation, Variances from Standards Learning Objectives 1. Standards 2. Budgetary Performance Evaluation 3. Direct.
Chapter 22 Performance Evaluation Using Variances from Standard Costs
Flexible & Static Budgets
Operational Budgeting
Foundations and Evolutions
Prepared by: C. Douglas Cloud Professor Emeritus of Accounting Pepperdine University © 2011 Cengage Learning. All Rights Reserved. May not be copied, scanned,
Performance Evaluation Using Variances from Standard Costs
Predetermined Overhead Rates and Overhead Analysis in a Standard Costing System Appendix 10A.
Power Notes Chapter 21 Performance Evaluation, Variances from Standards Learning Objectives 1. Standards 2. Budgetary Performance Evaluation 3. Direct.
Power Notes Chapter M6 Performance Evaluation, Variances from Standards Learning Objectives 1. Standards 2. Budgetary Performance Evaluation 3. Direct.
Presentation transcript:

@ 2012, Cengage Learning Performance Evaluation Using Variances from Standard Costs LO 4 – Computing Factory Overhead Variances

Factory Overhead Variances  Factory overhead costs are more difficult to analyze than direct labor and materials costs. This is because factory overhead costs have fixed and variable cost elements. LO 4

Factory Overhead Flexible Budget LO 4

Factory Overhead Flexible Budget LO 4 Factory Overhead Rate Budgeted Factory Overhead at Normal Capacity Normal Productive Capacity = $30,000 5,000 direct labor hours Factory Overhead Rate = Factory Overhead Rate $6.00 per direct labor hour =

Variable Factory Overhead Rate = Budgeted Variable Overhead at Normal Capacity Normal Productive Capacity Variable Factory Overhead Rate = $3.60 per direct labor hour Factory Overhead Flexible Budget LO 4 $18,000 5,000 direct labor hours Variable Factory Overhead Rate =

Fixed Factory Overhead Rate = Budgeted Fixed Overhead at Normal Capacity Normal Productive Capacity Fixed Factory Overhead Rate = $2.40 per direct labor hour Factory Overhead Flexible Budget LO 4 $12,000 5,000 direct labor hours Fixed Factory Overhead Rate =

Factory Overhead Variances  Variances from standard for factory overhead cost result from: 1.Actual variable factory overhead cost greater or less than budgeted variable factory overhead for actual production 2.Actual production at a level above or below 100% of normal capacity LO 4

Variable Factory Overhead Controllable Variance Actual Variable Factory Overhead = Budgeted Variable Factory Overhead – Variable Factory Overhead Controllable Variance Standard Hours for Actual Units Produced Variable Factory Overhead Rate x LO 4

Budgeted Variable Factory Overhead $14,400 Variable Factory Overhead Controllable Variance LO 4 = Variable Factory Overhead Controllable Variance $10,400 – $14,400 Actual Variable Factory Overhead = – Variable Factory Overhead Controllable Variance = – $4,000 Favorable Variance 4,000 direct labor hours x $3.60

Factory Overhead Volume Variance  The fixed factory overhead volume variance is the difference between the budgeted fixed overhead at 100% of normal capacity, and the standard fixed overhead for the actual production achieved during the period. LO 4

Fixed Factory Overhead Volume Variance Standard Hours for 100% of Normal Capacity = Standard Hours for Actual Units Produced Fixed Factory Overhead Volume Variance – Fixed Factory Overhead Rate x = Fixed Factory Overhead Volume Variance 5,000 direct labor hours 4,000 direct labor hours x $2.40– = Fixed Factory Overhead Volume Variance $2,400 Unfavorable Variance LO 4

Fixed Factory Overhead Volume Variance

Total actual factory overhead$22,400 Factory overhead applied (4,000 hours x $6 per hour) 24,000 Total factory overhead cost variance (favorable) $ (1,600) F LO 4 Reporting Factory Overhead Variances

 An unfavorable volume variance may be due to factors such as the following:  Failure to maintain an even flow of work  Machine breakdowns  Work stoppages caused by lack of materials or skilled labor  Lack of enough sales orders to keep the factory operating at normal capacity LO 4 Fixed Factory Overhead Volume Variance

Reporting Factory Overhead Variances LO 4

Factory Overhead $10,400 + $12,000 Applied factory overhead24,000 4,000 hours x $6.00 per hour Actual factory overhead22,400 Factory Overhead Account

LO 4 Overapplied factory overhead Factory Overhead Applied factory overhead24,000 Actual factory overhead22,400 Balance, June 301,600

Factory Overhead Account LO 4 Controllable Variance Applied Factory Overhead $24,000 Volume Variance Budgeted Factory Overhead for Amount Produced Variable factory OH$14,400 Fixed factory OH 12,000 Total$26,400 Actual factory overhead $22,400 – $4,000 F $2,400 U Actual Factory Overhead $22,400 Applied factory overhead $24,000

Factory Overhead Account LO 4 Applied Factory Overhead $24,000 Budgeted Factory Overhead for Amount Produced Variable factory OH$14,400 Fixed factory OH 12,000 Total$26,400 Actual factory overhead $22,400 Applied factory overhead $24,000 Total Factory Overhead Cost Variance – $1,600 F Actual Factory Overhead $22,400