The Australian Code for Geothermal Reserves and Resources Reporting: Practical Experience Jim Lawless, Malcolm Ward, Graeme Beardsmore, Fiona Holgate.

Slides:



Advertisements
Similar presentations
Subsidy measurement and classification: developing a common framework Workshop on Environmentally Harmful Subsidies, Paris, 7-8 November 2002 Ronald Steenblik.
Advertisements

1st Meeting of the Working Party on International Trade in Goods and Trade in Services Statistics - September 2008 Australia's experience (so far) in.
Ralf Becker United Nations Statistics Division
Best Available Techniques (BAT)
December 2005 EuP Directive : A Framework for setting eco-design requirements for energy-using products European Commission.
ITU WORKSHOP ON STANDARDS AND INTELLECTUAL PROPERTY RIGHTS (IPR) ISSUES Session 5: Software copyright issues Dirk Weiler, Chairman of ETSI General Assembly.
United Nations Statistics Division/DESA
1 ASX Listing Rule Amendments – Reporting Requirements for Mining Companies and the JORC Code 2012 ASX Presentation 2013.
Scoping a Foundation Skills Professional Standards Framework.
[Organisation’s Title] Environmental Management System
WP4 – Task 4.4 LCA Activities
Glenn S. Hodes UNEP Risø Center CDM Project Screening & PIN Development.
B-BBEE VERIFICATION FRAMEWORK.  The BEE Verification process evolved since the release of the B- BBEE strategy in 2003  The dti was requested to provide.
Kpmg When fair value bridges a revolution International Valuation Standards 28 October 2003 KPMG Financial Advisory Services Herve Richard, Partner, KPMG.
United Nations Statistics Division Scope and Role of Quarterly National Accounts Training Workshop on the Compilation of Quarterly National Accounts for.
Overview of Printing Industries Environmental Initiatives Presentation by Hagop Tchamkertenian Manager, Industry & Commercial Policy Printing Industries.
ACTeon Innovation, policy, environment Madrid – WFD Conference April 2006 How to proceed with the Programme of Measures and the River Basin Management.
Forest Practices Code Transition Larry Pedersen Chief Forester, MOF.
Purpose of the Standards
The implications of the new JORC Code (2012) with regard to disclosure
A PROCUREMENT ASSESSMENT MODEL Joel Turkewitz World Bank April 2003.
Negotiated Energy Agreements Pilot Project 24 th September 2003 Andrew Parish Project Coordinator Report Launch.
United Nations Statistics Division/DESA International Recommendations for the Index of Industrial Production (IIP)
Effectively applying ISO9001:2000 clauses 5 and 8
Market regulation for mineral companies May 2009Job Langbroek.
Environmental Impact Assessment (EIA): Overview
A Code for Reporting Geothermal Resources and Reserves Adrian Williams, Jim Lawless, Malcolm Ward, Fiona Holgate and Adrian Larking Adrian Williams | March.
1 Horses for Courses: CRIRSCO Template and UN Framework Classification Ruth Allington* and Stephen Henley** *President, European Federation of Geologists.
Improving Corporate Governance in Malaysian Capital Markets – The Role of the Audit Committee Role of the Audit Committee in Assessing Audit Quality.
© The McGraw-Hill Companies, An Introduction Chapter 1 Software Project Management 4 th Edition Robert Hughes and Mike Cotterell.
4th Meeting of the UNSD Oslo City Group on Energy Statistics, Ottawa, 2-6 February 2009 George Kowalski Former Director, Sustainable Energy Division, UNECE.
Renewable Energy Policy: A Local Government Perspective Alison Johnson for PEC624: Dissertation.
Audit objectives, Planning The Audit
Introducing a framework to estimate and classify Renewable Energy Resources Jan Koninckx, PhD Global Business Director - Biorefineries, DuPont Total Energy.
Liaison activities with other organisations (GHG/07/46) EPRI CCS-CDM working group CSLF Financing CCS (joint IEA GHG – IEA CCC) Det.
2011 PK Mwangi Global Consulting Forming a Strategy for your Business. Strategy refers to the plan that needs to be put in place to assist the business.
Professional Sign Off for Reclamation Certificates College of Alberta Professional Foresters Professional Workshops, February 15-17, 2011 Grande Prairie,
INFORMATION ASSURANCE USING C OBI T MEYCOR C OBI T CSA & MEYCOR C OBI T AG TOOLS.
Reserve Evaluation for Enhance Oil Recovery Purposes Using Dynamic Reserve Evaluation Model Woodside Research Facility GPO Box U 1987 Perth West Australia.
Using the UNFC-2009 to classify Renewable Energy Resources ABLC 2014 Washington, D.C. Raffaella Cristanetti DuPont Industrial Biosciences.
Ethiopian SACCO Supervision & Regulation
United Nations Statistics Division/DESA International Recommendations for the Index of Industrial Production (IIP)
Report on the Challenges in the Planning and Procurement of Services for the Ceres and van Rhynsdorp Correctional Facilities Portfolio Committee on Correctional.
1Meeting, location, date Implementation of EC Good Practice Guidance for Billing ERGEG Status Review Ulrike Zeilinger, Project Leader ERGEG Customer Empowerment.
Developing a Review Protocol. 1. Title Registration 2. Protocol 3. Complete Review Components of the C2 Review Process.
1 PDD and PIN preparation Technical Workshop on CDM Paramaribo, 18 June 2008 Adriaan Korthuis.
Specific Safety Requirements on Safety Assessment and Safety Cases for Predisposal Management of Radioactive Waste – GSR Part 5.
Technical Support for the Impact Assessment of the Review of Priority Substances under Directive 2000/60/EC Updated Project Method for WG/E Brussels 22/10/10.
Client Protection Certification Program European Microfinance Week November 3, 2011 Isabelle Barrès
IAEA International Atomic Energy Agency Presenter Name School of Drafting Regulations for Borehole Disposal of DSRS 2016 Vienna, Austria Siting Strategies.
Workshop on Disproportionate Costs, 10./ Copenhagen Summary and draft conclusions 11 April 2008.
NPC Study on Prudent Development of North American Oil and Gas Resources Resources and Supply Task Group - Framing Questions Oil & Gas Resources: What.
Company LOGO. Company LOGO PE, PMP, PgMP, PME, MCT, PRINCE2 Practitioner.
0 Copyright © 2008 Deloitte Development LLC. All rights reserved. Dong Hee Kim, Audit Manager IFRS Conversion For seminar.
WORKSHOP ON ACCREDITATION OF BODIES CERTIFYING MEDICAL DEVICES INT MARKET TOPIC 9 CH 8 ISO MEASUREMENT, ANALYSIS AND IMPROVEMENT INTERNAL AUDITS.
ICAJ/PAB - Improving Compliance with International Standards on Auditing Planning an audit of financial statements 19 July 2014.
F8: Audit and Assurance. 2 Audit and Assurance Designed to give you knowledge and application of: Section A: Audit Framework and Regulation Section B:
Determinations / verifications under JI – Experience to date UNFCCC Technical Workshop on Joint Implementation Bonn, February 13 th, 2007 For the benefit.
Internal Audit Quality Assessment Guide
MINERALISATION BEYOND INFERRED RESOURCES SAMREC/SAMVAL COMPANION VOLUME CONFERENCE Roger Dixon South African Representative, CRIRSCO May17, 2016.
EIAScreening6(Gajaseni, 2007)1 II. Scoping. EIAScreening6(Gajaseni, 2007)2 Scoping Definition: is a process of interaction between the interested public,
Establishing by the laboratory of the functional requirements for uncertainty of measurements of each examination procedure Ioannis Sitaras.
South African Representative, CRIRSCO
ISO/IEC
Auditing & Investigations II
An overview of the CRIRSCO International Reporting Template
Petroleum Reserves & The Needs of Financial Reporting
Setting Actuarial Standards
Guidelines to translate the intercalibration results into the national classification systems and to derive reference conditions Presented by Wouter.
4 FEASIBILITY STUDY KEY ACTIONS
Presentation transcript:

The Australian Code for Geothermal Reserves and Resources Reporting: Practical Experience Jim Lawless, Malcolm Ward, Graeme Beardsmore, Fiona Holgate

Background and Status* In Australia AGEG and AGEA have taken a lead role in defining a code for reporting of geothermal resources and reserves, which was launched in 2008 Useful discussions have been held with Joint Ore Reserve Committee (JORC), who govern the Australian minerals industry, and ASX – It is expected that it will be adopted by ASX in 2010 AGEA have resolved that the Code will be mandatory for their members – Which means all the leading geothermal companies The Code has gained acceptance and is being used including outside Australia The first 18 months of public reports have been completed under the Code and reviewed by the Compliance Committee The second edition of the Code is expected to be released early 2010 * These items already covered in companion paper (Williams et al )

Parallel Activities* IGA: established committee, agreed to support Code and put on website CANGEA have now released their own code very closely based on the Australian example, expected to be ratified by the TSX NZGA are supportive, want to apply agreed methodology to new national assessment USGS have just done new national inventory.

Scope* Includes “conventional” and EGS projects Both high and low temperatures Applies to projects in other countries carried out by Australian companies Existing projects as well as green-fields – Need to allow for energy already extracted Focus on electricity generation, but methodology readily adaptable to direct use

Key Principles* Transparency: – The basis for the estimate should be clear Materiality: – All relevant issues disclosed Competency: – Relies on the professional judgement of an accountable “competent person”, who would often be independent from the project proponent

Reporting vs. Guidelines Definition is at two levels 1.Guidelines for methodology: a comprehensive outline of preferred methodology and default parameters, not mandatory, set out in Lexicon 2.Reporting requirements (the Code): much shorter document, has minimum mandatory requirements Considerable scope left for individual judgement in how guidelines are applied

“Competent Persons”* Should be: – Affiliated to an appropriate professional organisation A register is being established for the 2 nd Ed. Membership includes an agreement to conform to the Code of Ethics – Qualified and experienced Minimum criteria defined Must describe their background – Preferably independent, but if not declare any interests – Accountable A complaints procedure is being established for the 2 nd Ed. – Need to sign off on all public reports where resources are referred to

Special Features of Geothermal Potential for recharge on a human time scale in some resources Fluids can be mobile across concession boundaries Energy prices are site specific and very variable – Prices available for electricity form geothermal sources currently range from ~ 3 to 35 USc/kWh This affects: – The economic drilling depth and hence the reservoir volume – The cut off grade – The plant type that is affordable and hence the efficiency Technology is rapidly changing – Lower temperature projects becoming more feasible which greatly extends the resource base

How: Preferred Approach Draw on SPE and other sources for principles and guidelines – (Lexicon) Draw on JORC for implementation and reporting – (Code) Allow a range of estimation methodologies But require a certain level of definition of the methodology/assumptions in each case – Relate cut-off “grade” to a specific assumed power price and/or technology

Two Dimensional Categorisation “Geological” knowledge and confidence – The resource characteristics – How reliably they are defined – Typically : “Proven – Probable – Possible” Commercial extractability – What can be commercially extracted - now – What may be extracted under more favourable conditions – Typically: Reserve -commercial Resource - as yet sub-commercial, but reasonable prospects for eventual extraction

Classification Increasing geological knowledge and confidence Exploration Results Geothermal ResourcesGeothermal Reserves Inferred Indicated Measured Probable Proven Consideration of energy recovery and conversion, economic, marketing, environmental social, legal, and regulatory factors (the “Modifying Factors”)

Certainty Classifications: Resources* Measured – Sampled by wells – Deliverability demonstrated – Area defined by geophysics / temperature gradient mapping Indicated – Sampled by wells – Temperature indicated by geochemistry or nearby wells – Area defined by geophysics / temperature gradient mapping Inferred – Less direct indications of area, depth and character – Sound reason for indicating resource e.g. geochemistry Exploration Results – Can be less formally reported but will not define resources – Still need a Competent Person statement * Items changed in 2 nd Edition

Certainty Classifications: Reserves* Proven – Sampled by wells – Deliverability demonstrated – Area interpolated between wells – “No surprises” expected in future drilling – “Bankable Projects” need a feasibility study and PPA as well as proven reserves Probable – Sampled by wells – Temperature indicated by geochemistry or nearby wells – Area defined by geophysics / temperature gradient mapping * Items changed in 2 nd Edition

Units for reporting: 1st Edition Exploration Results – Must not include any definitive assessment of the quantum of contained or recoverable energy Resources – Should be reported as energy in place (PJ)* – For higher certainty categories, can optionally report recoverable and/or converted energy (e.g. MW-years or GWh)* – To do so the technology pathway must be defined Reserves – Should be reported as energy in place (PJ)* – Should also report recoverable and/or converted energy – To do so the technology pathway and development plan must be defined * Items changed in 2 nd Edition

Commercial Extractability: Resources Could be commercially extractable in foreseeable future – Note SPE says “within 5 years” Technology identified, not yet necessarily economically or technically proven Define temperature limits below which deliverability would become un- commercial – – the extraction Cut Off and/or Base Temperature – NOT necessarily the same as the plant Rejection Temperature or ambient temperature

Commercial Extractability: Reserves Commercially Extractable in the context of a Stated Target Type of Development Use Well Deliverability as a practical measure Define areas / volumes that are extractable Define temperature limits below which deliverability would become un- commercial

Other Methodology Considerations Accommodating recharge Non-energy constraints – Environmental – Regulatory – Access – Chemistry Recovery factors Efficiency of energy conversion / utilisation Project lifetime/ sustainability

Practical Experience – On-going Issues What level of detail ? – Tension between producing verifiable estimates and being too technical for investors – Solution: produce short Public Report- refer to comprehensive background reports Some lack of compliance in omitting Competent Person statement – Solution: having an active compliance subcommittee Confusion between Cut Off and Base Temperature, and lack of consideration of technology pathway and economics in deciding upon them – Solution: requires more explicit treatment in the 2 nd Ed

Practical Experience – Issues (2) There is a large difference (up to 50x ?) between energy in place and recoverable energy, and recovery factors are often not well constrained – This can lead to very large estimates of energy in place for inferred resources, which can be misleading or lead to a lack of credibility – Solution: in 2 nd Ed, the resource is defined in terms of recoverable energy, not energy in place. This is a major change, and future Reports are going to have to state which edition of the Code is being used. – The Lexicon is being revised to provide default recovery factors for various geological settings

Practical Experience – Issues (3) Quoting energy in place not very meaningful for existing projects with proven recharge and production history – Dynamic modelling preferable in those cases – Need to recognise that the eventual failure mode is not necessarily heat depletion, it could be due : Pressure decline Cool water ingress Fluid depletion Adverse chemistry Environmental impacts (see companion paper by Clotworthy, Lawless and Ussher)

Conclusions The Australian Code is a good step towards a formal definition of geothermal Reserves and Resources It is uniquely suitable for reporting on both “conventional” and “unconventional” geothermal projects It is already starting to serve as a basis for international standardisation Experience gained in the first 18 months of operation is being applied to a revised 2 nd Edition The Code, Lexicon, Practice Notes and example reports for various types of projects can be downloaded from: (update in progress)