SDMAY11-01 Advisor: Dr. Ajjarapu Team Members: Luke Rupiper Shonda Butler Andrew Nigro Ryan Semler Chad Hand.

Slides:



Advertisements
Similar presentations
Wind Turbine Design and Implementation Phase III Senior Design May Team Andrew Nigro (EE) Chad Hand (EE) Luke Rupiper (EE) Ryan Semler (EE) Shonda.
Advertisements

Team: – Brad Jensen – Will Klema – Nate Schares Client: – PowerFilm, Inc. Advisor: – Dr. Ayman Fayed Solar-Powered Mobile Power Station (MPS)
Wind Turbine Simulation (Phase IV) SDMAY Advisor: Dr. Venkataramana Ajjarapu.
Wind Turbine Design and Implementation.. Team Members Members: Luke Donney Lindsay Short Nick Ries Dario Vazquez Chris Loots Advisor: Dr. Venkataramana.
Members: Morgan Muren Matt Nusbaum.  To develop an apparatus that can test the spin down characteristics of a cup anemometer and record and display the.
EET Survey of Electronics Chapter 7 - Simple Series, and Parallel circuits.
Adam Benjamin Kevin Brokish Joel Wiechmann Joseph Wang Capstone – Spring CDR Eric Wilson.
04013 Micro Turbine Senior Design Micro Turbine Senior Design CDR – May 14 th, 2004 Project
1. Wind Tunnel Control (WEBWIND) By: Adam Green Advisor: Dr. Aleksander Malinowski Dr. Scott Post Bradley University Department of Electrical Engineering.
Laboratory 5: Introduction to LabVIEW. Overview Objectives Background Materials Procedure Report / Presentation Closing.
12/13/2003By: Strobridge & Sulkoski1 G.U.S.T.E.R. General Universal System for Testing External Rotors.
GRAMM International Future Energy Challenge ‘07 Geoff Sanders, Richard Tan, Ankit Tripathi, Maung Myat, and Marc Hesse Versamachine.
Phase IV Presentation Group 7 Thomas Kudej Marko Sutovic Timothy Smith.
P07301 Summary Data Acquisition Module. Team Members.
Wind Turbine Energy Conversion System Design and Integration Advisor: Venkataramana Ajjarapu 2009 Project Team Elsammani Ahmed Hassan Burawi Brandon JanssenLuke.
EG1003: Introduction to Engineering and Design Introduction to LabVIEW.
Wind Turbine Simulation (Phase IV) SDMAY Advisor: Dr. Venkataramana Ajjarapu.
Charging System Service
Abstract In 2008 President Geoffrey introduced the Live green program which called for environmentally conscious living. In light of this initiative, it.
Automated Feeding Solutions for Dog Owners Preliminary Design Review October 19, 2007 Project Automated Dog Feeder Project Advisor Dr. Hongwei Wu The Canine.
Wind Turbine Design and Implementation Phase III Senior Design May Team Andrew Nigro (EE) Chad Hand (EE) Luke Rupiper (EE) Ryan Semler (EE) Shonda.
Advisor: Venkataramana Ajjarapu May Project Team Elsammani AhmedHassan Burawi Brandon JanssenKenneth Thelen.
Senior Design May Team Andrew Nigro (EE) Chad Hand (EE) Luke Rupiper (EE) Ryan Semler (EE) Shonda Butler (EE) Advisor: Venkataramana Ajjarapu.
Electricity Foundations of Physics. Electricity The movement of charge from one place to another Requires energy to move the charge Also requires conductors.
Critical Design Review Wind Turbine with Gearbox
Milki Wakweya Jennifer Long Fairman Campbell Pranav Boda Advisor: Dr. Ajjarapu.
Hybrid Wind and Solar Generation System MAY Team: Daoxi Sun, Riley O'Connor, Trevor Webb, Shihao Ni, Xiaokai Sun, Ben Ryan Advisor, Client: Venkataramana.
A Cloud-enabled Parking Garage Monitoring System with Smartphone Notification Andrew White, Jacob Pitcher Gary Steffen and Paul Lin September 20-23, 2012.
Hybrid Wind & Solar Generation Project
OBJECTIVE : To enhance the design of a zero-emission, low-noise snowmobile in order to provide the user with a safer and more reliable vehicle. Special.
W IND T URBINE D ESIGN AND I MPLEMENTATION P HASE III P ROJECT O VERVIEW Our senior design team expanded a previous wind energy project led by Dr. Ajjarapu.
Introduction In 2008 President Geoffrey introduced the Live Green Program which called for environmentally conscious living. In light of this initiative,
Wind Turbine Design and Implementation Phase III Senior Design May Team Andrew Nigro (EE) Chad Hand (EE) Luke Rupiper (EE) Ryan Semler (EE) Shonda.
Functional Requirements Generate an AC current Supply an output of 500 to 1000 Watts Supply power to the Coover Hall grid Turn off in high wind speeds.
Wind Turbine Simulation (Phase IV)
Mixed-Signal Option for the Teradyne Integra J750 Test System May08-12 Emily Evers Vincent Tai.
PRINCIPLES OF OPERATION
Group Members Mike Svendsen – Computer Engineer Steve Towey – Computer Engineer Brian Walker – Architect Richard George – Industrial Technology Client.
ISU Science Center : Phase 3 : Dec Speedometer Station This station matches two areas of study into one cohesive system. Current will be induced.
Final Demonstration Team 2A The Charles Machine Works Downhole Generator Project.
For Electric Vehicle Team Members Pramit Tamrakar - EE Jimmy Skadal - EE Hao Wang - EE Matthew Schulte - EE William Zimmerman - EE Advisor Ayman Fayed.
Wind Turbine Project Plan (Dec08-04) ‏ Lindsay Short Nick Ries Luke Donney Dario Vazquez Chris Loots Advisor: Dr. Ajjarapu Client: Dr. Aliprantis.
DEVELOPMENT OF LABORATORY MODULE FOR SMALL WIND TURBINE CONTROL SYSTEM (Phase V) Advisor/Client: Dr. Venkataramana Ajjarapu Group MembersPosition on Team.
Wind Turbine Design and Implementation. Team Members Members: Luke Donney Lindsay Short Nick Ries Dario Vazquez Chris Loots Advisor: Dr. Venkataramana.
Hybrid Power Controller (HPC) Mid-Semester Presentation Senior Design I.
Development of Laboratory Module for a Small Wind Turbine System (Phase V) Slide 1 of 13 Team members: Adam Literski, Achila Jayasuriya, Eurydice Ulysses,
Design Team : Advisor: Dr. Edwin Project Web Site: Client: Paul
Hybrid Power Controller (HPC) Final Presentation Senior Design II.
Digital Logic Circuits. Overview Objectives Background Materials Procedure Report/Presentation Closing.
Hybrid Power Controller (HPC) Mid-Semester Presentation Senior Design II.
Wind Turbine Design & Implementation Milki Wakweya Jennifer Long Fairman Campbell Pranav Boda Advisor: Dr. Ajjarapu.
Problem Statement The goal of this project is to complete the basic automated functions of the Dream Green putting surface. The objective is to produce.
Wind Turbine Energy Conversion System Design and Integration
Introduction to LabVIEW
BLDC Motor Speed Control with RPM Display. Introduction BLDC Motor Speed Control with RPM Display  The main objective of this.
FSAE Engine Management System Adolfo Pereira Donald Zucaro Lee McDade Jeremy Belge Sun-Jet Liu Marcin Trelinski Advisor: Dr. Alan Nye Sponsor: FSAE Formula.
Introduction to LabVIEW. Overview Objectives Background Materials Procedure Report/Presentation Closing.
EG1003: Introduction to Engineering and Design Introduction to LabVIEW.
Fan Assembly Driven by Magnetic Fields
Digital Logic Circuits
Stand-Alone Solar PV Energy System
Wind Turbine Energy Conversion System Design and Integration
Introduction to LabVIEW
Digital Logic Circuits
Introduction to LabVIEW
Digital Logic Circuits
Digital Logic Circuits
Introduction to LabVIEW
Introduction to LabVIEW
Introduction to LabVIEW
Presentation transcript:

SDMAY11-01 Advisor: Dr. Ajjarapu Team Members: Luke Rupiper Shonda Butler Andrew Nigro Ryan Semler Chad Hand

Project Description The objective of the senior design project is to simulate an environment in which a wind resource provides renewable energy. The electricity generated from the wind turbine can be used to power a direct load and potentially be integrated into the Iowa State University power grid.

Specifications Functional Requirements The turbine will generate a 24V DC output The turbine will generate a 400W peak output The test-bed connection will serve to simulate the load The sensors to gather wind data are an anemometer and wind vane The RPM sensor will accurately reflect the speed of the motor within ±5% The wind turbine will supply a load after charging the batteries to 23V DC The user interface will display accurate measurements of DC voltage and current, RPM, and real power produced Non-Functional Requirements: The project will comply with all state and federal electrical regulations The turbine has been remounted to a new stable operating platform The project will be documented through technical manual and in-depth schematics Wiring and connections will be redone in a professional manner

Project Plan Goals: To understand the previous two senior design groups work. Recognize the constraints and restrictions that we might run into as a group. Estimate costs and assemble a system block diagram. Map out tasks, operation, uses, and propose our approach to completing our objectives. Overview: Problem statement – Simulate an environment in which a wind resource provides renewable energy. System Description – Air X Turbine, OutBack Inverter, 24V Battery Bank, AC power supply and motor, mounting system, computer with LabVIEW software. Operating Environment – Inside the power lab in Coover, but ideally mounted on the roof. User Interface – LabVIEW to control motor inputs and outputs Functional/Non-Functional requirements Constraints – hardware/software Scheduling – Task object, approach, expected results, and timeline Cost Estimation – Budget = $400

Mounting Problem: Previously the motor and wind turbine were coupled together on separate mounting systems. Issues we experience with this system include bowing wood, wind turbine movement during operation, and inaccurate coupling height.

Mounting Design Alternative A wood base with extruded aluminum mounting Two aluminum rods braced and connected to the wood mounting board go up directly to the face of the turbine to hold it in place. An extruded aluminum mounting box braced and connected to the wood matches up to the two rods bracing the turbine. Materials: 3x M5x35 SS socket Head Screws ~ $3 Extruded aluminum mounting brackets ~$50 L brackets ~ $10 ¾” MDF or Birch Plywood sheet ~ $25 Round rubber gasket ~ $5 1 ½” Schedule 40 Steel Conduit – Grounded as per NEC , item 5 and NEC , item A ~$5 Total Cost ~ $98

New Turbine Platform Turbine/Motor Mount Light Switches Current/Voltage Sensors NI DAQ Terminal Block Load Resistive

LabVIEW Interface Have completed wind profile simulation from text file simulating wind speeds over a given time. Are in the process of creating a direct connection via USB to allow for a more accurate simulation. Wind sensors are completed and can be interfaced but need reprogramming to allow for direct connection.

RPM Sensor Feedback to LabVIEW of actual RPM Digital output Powered by DAQ Prefabricated holes for our mount Long leads Magnets mounted to coupling

System Testing Unit Level Testing: 1. Wind data reception Connection to Anemometer LabVIEW input of data 2. LabVIEW control of motor Communication with power supply Motor response to the desired output 3. Wind turbine functionality Manufacturer supplied testing methods 4. Battery charging Charging ability from 12V charger on individual cells 5. Inverter functionality POST : LED’s indicate status and function 6. Sensor functionality RPM Sensor: varying sensor voltage when magnet is near Current Transducer: Voltage changes as current is passed through wire Full System Testing: Verify system runs as expected All units function as expected and system is automated

Semester Schedule Tasks: Task 1:Complete mount fabrication and construction Task 2:Reorganize wiring for turbine and sensors Task 3:Complete hall sensor installation Task 4:Text file wind data gathering Task 5:Real-time wind data gathering Task 6:Load curve and wind profiling via MATLAB Task 7:Variable load control and voltage regulator Task 8:Full system test with wind sensors mounted outside Task 9:Project Documentation Manual Task 10:Project Display Poster Week:Week 1Week 2Week 3Week 4Week 5Week 6Week 7Week 8Week 9Week 10Week 11Week 12Week 13Week 14Week 15Week 16Task Completed Anticipated Task 1: X Actual Task 1: X Anticipated Task 2: Actual Task 2: Anticipated Task 3: Actual Task 3: Anticipated Task 4: X Actual Task 4: X Anticipated Task 5: Actual Task 5: Anticipated Task 6: Actual Task 6: Anticipated Task 7: Actual Task 7: Anticipated Task 8: Actual Task 8: Anticipated Task 9: Actual Task 9: Anticipated Task 10: Actual Task 10: