Lecture 7. Review of Lecture 6 Project Scheduling: The process of defining project activities, determining their sequence, estimating their duration Scheduling.

Slides:



Advertisements
Similar presentations
Project Management Concepts
Advertisements

CP Chapter 4 Schedule Planning.
Work Breakdown Structures
PROJECT RISK MANAGEMENT
© 2005 by Prentice Hall Chapter 3 Managing the Information Systems Project Modern Systems Analysis and Design Fourth Edition Jeffrey A. Hoffer Joey F.
Advanced Project Management - CPH
Defining activities – Activity list containing activity name, identifier, attributes, and brief description Sequencing activities – determining the dependencies.
© 2008 by Prentice Hall 3-1 ITCS311 Systems Analysis and Design Dr. Taher Homeed Feb 2010 Department of Computer Science College of IT University of Bahrain.
PMP/CAPM Prep Workshop Time
Managing Project Scheduling. What is Project Scheduling? The process of: – defining project activities – determining their sequence – estimating their.
Introduction to Project Management Chapter 6 Managing Project Scheduling Information Systems Project Management: A Process and Team Approach, 1e Fuller/Valacich/George.
Copyright 2008 Introduction to Project Management, Second Edition 1  Project time management involves the processes required to ensure timely completion.
BSBPMG503A Manage Project Time 6.5 Develop Schedule The process of analysing activity sequences, durations, resource requirements and schedule constraints.
Importance of Project Schedules
Chapter 4: Project Management Objectives Define the terms project and project management, and differentiate between project and process management. Describe.
Class 28: Chapter 16: Project Management Class 28 Agenda –Collect Player Diary 2 and Conduct Player Audit No ed diaries – 5 PM Deadline –Discuss Grade.
Project Time Management
Centro de Estudos e Sistemas Avançados do Recife PMBOK - Chapter 6 Project Time Management.
The Project Management Body of Knowledge (PMBOK)
Managing Project Scheduling. What is Project Scheduling? The process of: – defining project activities – determining their sequence – estimating their.
© 2006 ITT Educational Services Inc. System Analysis for Software Engineers: Unit 5 Slide 1 Chapter 3 Managing the Information Systems Project.
Project Management An overview. What is a Project A temporary job to accomplish a specific task A temporary job to accomplish a specific task Attributes.
Chapter 3 : Managing the Information Systems Project.
© 2005 by Prentice Hall 3-1 Chapter 3 Managing the Information Systems Project Modern Systems Analysis and Design Fourth Edition.
Software Project Management Task Estimating and Scheduling
BSBPMG402A Apply Time Management Techniques 1 Apply Time Management Techniques Week 6 Project Time Processes – Part 2 C ertificate IV in Project Management.
TIME MANAGEMENT Definition: Time management is a set of principles, practices, skills, tools, and systems that work together to help you get more value.
Copyright 2006 John Wiley & Sons, Inc. Beni Asllani University of Tennessee at Chattanooga Project Management Operations Management - 5 th Edition Chapter.
Lecture 5 Title: Project Time Management By: Mr Hashem Alaidaros MIS 434.
Hartley, Project Management: Integrating Strategy, Operations and Change, 3e Tilde Publishing Chapter 5 Time Management Developing and controlling the.
POST GRADUATE PROGRAM OF INFORMATION TECHNOLOGY
~ pertemuan 6 ~ Oleh: Ir. Abdul Hayat, MTI 03-Apr-2009 [Abdul Hayat, Project Time Management, Semester Genap 2008/2009] 1 PROJECT TIME MANAGEMENT.
Quick Recap. Work Breakdown Structure (WBS): Set of activities to do (“use cases”) Formats of WBS Risk associated WBS Approaches for WBS Dependency Graph:
Information Technology Project Management, Seventh Edition Note: See the text itself for full citations.
IT Project Management, Third Edition Chapter 6 1 Chapter 3: Project Time Management.
BIS 360 – Lecture Two Ch. 3: Managing the IS Project.
1 L U N D S U N I V E R S I T E T P rojektledning och Projektmetodik.
Managing Project Resources. Project Resources Human Resources Project stakeholders: – Customers – Project team members – Support staff Systems analyst.
Lecture 6. Review of Lecture 5 Company strategic planning: mission and objective statements and competitive strategy. Planning Methods: Top-down, Bottom-up.
Geog 469 GIS Workshop Project Management.
BSBPMG402A Apply Time Management Techniques Apply Time Management Techniques Project Time Processes – Part 2 C ertificate IV in Project Management
Advanced Project Management Project Time Management Ghazala Amin.
Collecting requirements – Different methods Defining scope – Estimates for all resources Creating the WBS – Different approaches Verifying scope – Formal.
Develop Project Charter
Chapter 6: Project Time Management Information Technology Project Management, Fourth Edition Using Critical Chain Scheduling, PERT, and MS Project 2003.
Information Systems System Analysis 421 Chapter 3 Managing the Information Systems Project.
Chapter 3 Managing the Information Systems Project
Project Time Management Ashima Wadhwa. Schedule Development – Determining start and finish dates for project activities – Without realistic dates, project.
Project Time Management
SOFTWARE PROJECT MANAGEMENT
Chapter 4 Note: See the text itself for full citations.
Copyright 2006 John Wiley & Sons, Inc. Beni Asllani University of Tennessee at Chattanooga Project Management Operations Management - 5 th Edition Chapter.
Develop Schedule is the Process of analyzing activity sequences, durations, resource requirements, and schedule constraints to create the project schedule.
Reference: Figure 6.2. PMBOK® Guide, 5 h Ed Reference: Figure 6.2. PMBOK® Guide, 5 h Ed.
Develop Schedule is the Process of analyzing activity sequences, durations, resource requirements, and schedule constraints to create the project schedule.
BSBPMG503A Manage Project Time Manage Project Time Project Time Processes Part 2 Diploma of Project Management Qualification Code BSB51507 Unit Code.
Project Time Management Based on PMBOK 5 th Edition Abdelrahman Sheta, PMP,ITIL 1PMP - Project Time Managementfacebook.com/Sheta.Page.
Chapter 4 MIS Project Management Lecturer Sihem Smida Sihem Smida Developing a project plan.
© 2008 Prentice Hall6-1 Introduction to Project Management Chapter 6 Managing Project Scheduling Information Systems Project Management: A Process and.
Introduction to Project Management Chapter 7 Managing Project Resources Information Systems Project Management: A Process and Team Approach, 1e Fuller/Valacich/George.
Project Management MGT 30725
Plan Schedule Management
Chapter 6: Project Time Management
Project Time Management
CIS12-3 IT Project Management
Project Time Management
Project Time Management
Project Time Management
Project Time Management
Presentation transcript:

Lecture 7

Review of Lecture 6 Project Scheduling: The process of defining project activities, determining their sequence, estimating their duration Scheduling process steps: Creating a work breakdown structure (WBS) to identify required project components Defining the activities needed to complete each of these components Determining the most efficient sequencing order of these components

Project Scheduling Impacted by: –Technologies New and sophisticated software Advancements in networking and web capabilities –Team processes Resource availability Resource allocation Resource assignment –Scheduling creation and execution Developed early Followed/monitored/changed throughout project Assist in determination of progress

Possible Sequencing Constraints Technical requirements and specifications Safety and efficiency Preferences and policies Resource availability

Lecture 7 - Project Resources

Human Resources Project stakeholders: –Customers –Project team members –Support staff Systems analyst System developers –Project suppliers and vendors –End users Selected by: –Availability –Skill set –Cost

Capital Resources Tools and Infrastructure –Hardware –Software –Computing environment Available within or through external third parties

Project Management Office (PMO) Group dedicated to providing support and expertise on project management functions and activities

Opportunity Cost The measure of the alternative opportunities foregone in the choice of one good or activity over others

Managing Project Resources Project resource availability and selection will impact other project areas: –Schedule –Cost –Quality –Risk

What Defines a Successful Project? On time Within budget Meets stakeholders expectations Resource selection and management impacts all three

Resource Management Involved in all project management stages –Initiation What type of project to pursue –Planning Allocation & scheduling of resources –Execution Possible resource reallocation may be required –Control Potential project changes may occur requiring action –Close-out Release of resources and/or termination of contracts

Duration and Effort Duration: time that elapses between the start and finish of an activity, including any interruptions (holidays; weekends; sickness; etc.) Effort: actual time required to perform an activity excluding interruptions

Resource Management

Resource Management Techniques Activity resource estimating –Identifies what resources are required for each activity Activity duration estimating –Determines time required of resource to perform specific activity Schedule development

Activity Resource Estimating

Inputs –Enterprise environmental factors –Process assets –Outputs from prior project planning stages –Project management plan

Resource Estimation Techniques & Tools Multiple techniques should be applied Choices: –Expert judgment and past performance data –Estimation data available from market research firms –Alternative analysis processes –Bottom-up estimating –Brainstorming –Mind mapping MS Project – “Resource Sheet”

Resource Estimation Outputs Resource requirements –Types –Quantities required Resource breakdown structure (RBS) –Illustrates required resources by type or category in hierarchical format Resource calendar –Displays availability for specific resource

Required Inputs, Tools and Techniques Used, and Resulting Outputs During Activity Duration Estimating

Activity Duration Estimating Project scope and resource information used to determine duration estimation for each activity Inputs: –Activity list –Activity attributes –Activity cost estimates –Resource requirements –Resource calendar –Project scope statement –Enterprise environmental factors –Organizational process assets –Risk register

Duration Estimating Techniques Expert judgment Analogous estimating Quantitatively based estimates –Parametric –Three-Point Reserve time

Duration Estimation Outputs Updated activity attributes Updated activity estimates – Gantt chart –Fixed point – Example: July 15th –Range estimates – Example: 6 months +/- 2 weeks –Three-Point Optimistic Pessimistic Most likely

Schedule Development Establishment of start and stop dates for project activities Project schedule = activity duration estimates + activity sequences

Required Inputs, Tools and Techniques Used, and Resulting Outputs During Schedule Development

Schedule Development Inputs Organizational process assets – Project calendar Project scope statement –Imposed dates and milestones Project network diagrams Activity list, attributes, duration estimates and resource requirements Resource calendars Risk register

Schedule Development Techniques May include: –Schedule network analysis Time scheduling of project activities based on resource availability and constraint considerations –Critical Path Method (CPM) Identification of specific activities within a path or sequence that cannot be delayed without delaying the finish time for the entire project Used to assign a deterministic start and stop date for each activity

Schedule Development Techniques (cont.) Critical Path Illustration

Schedule Development Techniques (cont.) Float/Slack Used to determine the late and early project completion dates Free float/slack –Time an activity can be delayed without affecting the following activity –Non-critical paths will always contain a positive free float Total float/slack –Time an activity can be delayed without affecting the project’s completion date –Critical path always contains zero or negative total float Determined by the calculations of forward and backward passes

Schedule Development Techniques (cont.) Program Evaluation and Review Technique (PERT) –Uses probabilistic time estimates to determine activity duration –Sometimes referred to as Activity-On-Node Network Diagram

PERT Schedule Development Techniques (cont.)

–Schedule compression –What-if-scenario analysis –Resource leveling –Critical chain method

Schedule Development Outputs Updates to the schedule model data Schedule baseline Activity list Activity attributes Project management plan Requested changes and recommended corrective actions Lessons learned

Required Inputs, Tools and Techniques Used, and Resulting Outputs During Schedule Control

Questions?