ARRA Project Summary Information Division of Construction Management.

Slides:



Advertisements
Similar presentations
TWO STEP EQUATIONS 1. SOLVE FOR X 2. DO THE ADDITION STEP FIRST
Advertisements

You have been given a mission and a code. Use the code to complete the mission and you will save the world from obliteration…
Advanced Piloting Cruise Plot.
Copyright © 2003 Pearson Education, Inc. Slide 1 Computer Systems Organization & Architecture Chapters 8-12 John D. Carpinelli.
Copyright © 2011, Elsevier Inc. All rights reserved. Chapter 6 Author: Julia Richards and R. Scott Hawley.
1 Copyright © 2013 Elsevier Inc. All rights reserved. Appendix 01.
1 Copyright © 2010, Elsevier Inc. All rights Reserved Fig 2.1 Chapter 2.
By D. Fisher Geometric Transformations. Reflection, Rotation, or Translation 1.
David Burdett May 11, 2004 Package Binding for WS CDL.
Business Transaction Management Software for Application Coordination 1 Business Processes and Coordination.
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
Title Subtitle.
Custom Statutory Programs Chapter 3. Customary Statutory Programs and Titles 3-2 Objectives Add Local Statutory Programs Create Customer Application For.
Add Governors Discretionary (1G) Grants Chapter 6.
CALENDAR.
0 - 0.
DIVIDING INTEGERS 1. IF THE SIGNS ARE THE SAME THE ANSWER IS POSITIVE 2. IF THE SIGNS ARE DIFFERENT THE ANSWER IS NEGATIVE.
SUBTRACTING INTEGERS 1. CHANGE THE SUBTRACTION SIGN TO ADDITION
MULT. INTEGERS 1. IF THE SIGNS ARE THE SAME THE ANSWER IS POSITIVE 2. IF THE SIGNS ARE DIFFERENT THE ANSWER IS NEGATIVE.
FACTORING ax2 + bx + c Think “unfoil” Work down, Show all steps.
Addition Facts
Year 6 mental test 5 second questions
Year 6 mental test 10 second questions
Year 6 mental test 15 second questions Calculation Addition.
Around the World AdditionSubtraction MultiplicationDivision AdditionSubtraction MultiplicationDivision.
Learning to show the remainder
ZMQS ZMQS
BT Wholesale October Creating your own telephone network WHOLESALE CALLS LINE ASSOCIATED.
Break Time Remaining 10:00.
PP Test Review Sections 6-1 to 6-6
ABC Technology Project
© S Haughton more than 3?
VOORBLAD.
Factors, Prime Numbers & Composite Numbers
Copyright © 2012, Elsevier Inc. All rights Reserved. 1 Chapter 7 Modeling Structure with Blocks.
Squares and Square Root WALK. Solve each problem REVIEW:
Basel-ICU-Journal Challenge18/20/ Basel-ICU-Journal Challenge8/20/2014.
1..
Adding Up In Chunks.
Lets play bingo!!. Calculate: MEAN Calculate: MEDIAN
MaK_Full ahead loaded 1 Alarm Page Directory (F11)
Chapter 5 Test Review Sections 5-1 through 5-4.
GG Consulting, LLC I-SUITE. Source: TEA SHARS Frequently asked questions 2.
1 First EMRAS II Technical Meeting IAEA Headquarters, Vienna, 19–23 January 2009.
Before Between After.
Addition 1’s to 20.
25 seconds left…...
Subtraction: Adding UP
Test B, 100 Subtraction Facts
: 3 00.
5 minutes.
Week 1.
Analyzing Genes and Genomes
We will resume in: 25 Minutes.
©Brooks/Cole, 2001 Chapter 12 Derived Types-- Enumerated, Structure and Union.
Essential Cell Biology
Converting a Fraction to %
Clock will move after 1 minute
Intracellular Compartments and Transport
1 Unit 1 Kinematics Chapter 1 Day
PSSA Preparation.
Essential Cell Biology
How Cells Obtain Energy from Food
Energy Generation in Mitochondria and Chlorplasts
Select a time to count down from the clock above
CpSc 3220 Designing a Database
Presentation transcript:

ARRA Project Summary Information Division of Construction Management

ARRA Program Update (As of February 23, 2010) ODOT Let 129 Projects let in Projects let in Total ARRA Projects let to date 59 projects remain to be let in Conaway Conference 2

3

ARRA Program Update Local Let Projects (LPA) 66 Projects Let to date 90 Remain to be let in Conaway Conference 4

ARRA Program Update (As of February 23, 2010) ODOT Let 50 projects completed in projects will continue into 2010 season 2010 Conaway Conference 5

6

ARRA Program Update Local Let Projects (LPA) 34 have construction start dates 18 are completed 2010 Conaway Conference 7

ARRA Program Update (As of February 23, 2010) ODOT Let $436,591, Total Original Contract Amt. $352,647, ARRA Funding 2010 Conaway Conference 8

9

ARRA Program Update Local Let (LPA) $ M local program $93.8 M has been awarded to date $18 M has been paid to date 2010 Conaway Conference 10

ARRA Program Update (As of February 23, 2010) ODOT Let $436,591, Total Original Contract Amt. $119,329, Total Paid to Date 2010 Conaway Conference 11

2010 Conaway Conference 12

ARRA Program Update (As of February 23, 2010) ODOT Let Change Orders Processed $165, Or 0.14% of Paid to Date 2010 Conaway Conference 13

2010 Conaway Conference 14

ARRA Program Update Of the 143 Contracts (ODOT) Let to date: 57 Different Contractors 37 Contractors have a single contract 9 Contractors have 2 contracts 3 Contractors have 3 contracts 2 Contractors have 4 contracts 2010 Conaway Conference 15

ARRA Program Update 1 Contractor has 5 contracts 1 Contractor has 8 contracts 1 Contractor has 9 contracts 1 Contractor has 12 contracts 1 Contractor has 14 contracts 1 Contractor has 23 contracts 2010 Conaway Conference 16

2010 Conaway Conference 17

ARRA Projects (ODOT) - Types Bridge Deck Replacement4 projects Bridge Maintenance2 projects Bridge Painting3 projects Bridge Repair7 projects Bridge Replacement17 projects Culvert Constr./Reconstr./ 5 projects Repair BRIDGE RELATED38 projects 2010 Conaway Conference 18

ARRA Projects (ODOT) - Types Mill & Fill11 projects Pave Gnrl System23 projects Pave Prmy System9 projects Resurfacing Undivided29 projects Resurfacing Divided3 projects Resurfacing Safety1 project PAVING RELATED76 projects 2010 Conaway Conference 19

ARRA Projects (ODOT) - Types Interchange Reconstruction2 projects Intersection Improvement1 project Major Rehab1 project Major Widening3 projects Minor Widening1 projects Widening1 project New Construction2 projects Relocation2 projects 2010 Conaway Conference 20

ARRA Projects (ODOT) - Types Add Sidewalks1 project Drainage Improvement1 project Earthwork/Slide Repair2 project GR Maintenance (NEW)2 projects Parks1 project Preventive Maintenance5 projects 2010 Conaway Conference 21

ARRA Projects (ODOT) - Types Section Improvement1 project Signals1 project Spot Safety1 project Traffic Management System1 project 2010 Conaway Conference 22

Questions? 2010 Conaway Conference 23