Welcome to CERN C. Paris University of Oxford / CERN Mechanical Groups Meeting 4th May 2010.

Slides:



Advertisements
Similar presentations
NCCEF Overview Niall Macfadyen. Summary Introduction to Aerospace in the Northwest Overview of NCCEF capabilities Overview of Materials test and evaluation.
Advertisements

COOLING TUBE ACCELERATING STRUCTURE MANIFOLD COUPLER VACUUM INTERFACE FLANGE RF INTERFACE FLANGE TUNING STUD ENGINEERING DESIGN AND FABRICATION OF X-BAND.
CERN-GREECE INDUSTRY DAY 31/03/2014 – NCSR “Demokritos” Athens A. Dallocchio – Engineering Department.
Jiaru Shi Department of Engineering Physics, Tsinghua University CLIC Workshop 2013 Accelerator Activities at Tsinghua University.
18/6/2007 M.Taborelli, TS-MME Structure fabrication techniques and possibilities M.Taborelli Disk structures Quadrant structures ….most of it inspired.
Personal reflections, Belgrade, November 30,2009 Markus Nordberg, CERN/ATLAS.
LHC Experiments at Liverpool E2V Visit – Nov 2005 Introduction Si Technology Upgrade/Maintenance Summary.
Workshop TS May 2008 GENERAL CLIC ALIGNMENT Progresses and strategy. Hélène MAINAUD DURAND, TS/SU/MTI.
Selective laser melting applications titanium, aluminium, and steels 3D PRECISION SA – 2800 DELÉMONT Dominique Beuchat, Founder and CEO SWISSPHOTONICS.
University of Huddersfield International Institute for Accelerator Applications Professor Rob Edgecock Professor Roger Barlow Target simulation and opportunities.
WP6: Quality Assurance and Reliability Testing A. Honma, CERN PH/DT 30 April 2010DT Steering Board Meeting, A. Honma1  Mandate  Manpower and Resources.
CLIC Kickers: Status and activities for 2013 in view of the budget discussions for 2013 CTC #65 M.J. Barnes CLIC Technical Committee, November M.J.
NEW TECHNOLOGIES – RESEARCH CENTRE. Introduction ► Self-financing research institute at UWB ► Modern computing and laboratory equipment ► Direct cooperation.
April 12, 2006 J. Garcia Workshop on Test Facilities and measurement equipment needed for the LHC exploitation Resistive magnet measurements & coils, manufacture.
Discussion. Help Needed for Splice Consolidation Opening and closing W (20 FTE’s) Repair, reinstall and tack PIM’s (2) Orbital machining of M sleeves.
EUROPEAN UNION GOVERNMENT OF ROMANIA SERBIAN GOVERNMENT Structural Funds Common borders. Common solutions. Romania – Republic of Serbia IPA Cross-border.
1 Budapest University of Technology and Economics Participant Profile Department of Applied Mechanics Department of Manufacturing Science and Technology.
HIE-ISOLDE Design Study and the CATHI Project Richard Catherall EN-STI ISOLDE Technical Coordinator HIE-EBIS Workshop 16 th -17 th October CERN.
International Workshop on Linear Colliders 2010 Design and fabrication update on PSI/Trieste X-band phase- space rotator structure Dmitry Gudkov 21-OCT-2010.
LASER AND ADVANCES IN METROLOGY
1 NSF Engineering Research Center for Reconfigurable Manufacturing Systems University of Michigan College of Engineering Cylinder Bore Inspection Engineering.
H. MAINAUD DURAND PACMAN WP1 OUTLINE Tasks & role of associated partner Plans for training.
Workshop 12/04/2006AT/MTM SM18 Test Facility A. Siemko "Workshop on Test Facilities and measurement equipment needed for the LHC exploitation"
1 Status of the CLIC two-beam module program A. Samochkine, G. Riddone Acknowledgements to the Module WG members 4 February 2014 CLIC Workshop 2014 (3-7.
CLIC Implementation Studies Ph. Lebrun & J. Osborne CERN CLIC Collaboration Meeting addressing the Work Packages CERN, 3-4 November 2011.
1 1. Some recent views ( ) 2 Linac tunnel
Pavel Karataev John Adams Institute for Accelerator Science At Royal Holloway, University of London oPAC Advanced School on Accelerator Optimisation 7-11.
CERN status - Nb cavity – Manufacturing 1 15/Nevember/2010, Ofelia Capatina EN/MME 1 SPL Cavity Working Group Meeting TaskExternal Company CERN Provide.
CLIC08 workshop CLIC module layout and main requirements G. Riddone, on behalf of the CMWG Home page of the TBM WG:
CLIC Module WG 20/07/2009 H. MAINAUD DURAND, BE-ABP/SU Pre-alignment system and impact on module design.
2 nd PH-DT Training Seminar CERN TODAY An introduction to rapid prototyping techniques by C.Bault, PH-DT-EO NEXT on 3 th October at 11:00 Overview.
20 years of high average Fundamental Power Coupler designs at CERN CWRF workshop 2014, Trieste Eric Montesinos, CERN-RF, on behalf of many colleagues CWRF.
1 Thermal tests planning for mock-up TM0 Thermal tests planning for CLIC prototype module type 0 May 30th,
Industrial Controls Engineering Department First CERN PXI Users Group meeting 19 th October 2011 – Hubert REYMOND – EN/ICE 1.
FNAL efforts on LHC Crab Cavity R&D (Proposals for R&D sub-tasks, resources and schedule) Nikolay Solyak.
JRA2-brainstorming 4/1/2006, Lucie Linssen, slide 1 introduction to CERN in EUDET The CERN PH (physics) department participates in EUDET PH department:
ENGINEERING DESIGN AND FABRICATION OF X-BAND ACCELERATING STRUCTURE TD24 WITH WFM Abstract To achieve high luminosity in CLIC, the accelerating structures.
1 Thermal tests planning for mock-up TM0 Thermal tests planning for CLIC prototype module type 0 July 17,
ENLIGHT,12/2/20021 Health and Science, can CERN contribute? The Mission of CERN (1954): “The Organization shall provide for collaboration among European.
New plans for high power RF tests places at CERN O. Brunner BE/RF/KS – January ‘10.
Fiducialisation and initial alignment of components for CLIC Mateusz Sosin on behalf of the CLIC active pre-alignment team CLIC Workshop 2015.
S. Atieh EN-MME Manufacturing R&D for SPL β =1 cavities at CERN on behalf of the SPL cavities mechanical design and manufacturing team.
TD26CC PLANS FROM CIEMAT Laura Sánchez on behalf Electrical Engineering Group of CIEMAT.
The company was founded in The main profile of our business is precision machining of metals and plastics and so the CNC turning, CNC milling, grinding.
First discussion on MSS for Katrin March 26, 2013 M.Capeans CERN PH-DT.
ALBA labs  Magnetic lab  RF lab  Vacuum lab Francis Perez.
Scope of CERN SC RF Activities Status Report for A&T Sector Meeting 18 Nov’13 BE, TE, EN Departments Summarized by José Miguel JIMENEZ 1 BE-RF (E. Jensen*,
PACMAN : technical objectives Hélène Mainaud Durand.
BRAINSTORMING ON LASER BASED SOLUTIONS FOR CLIC PRE-ALIGNMENT INTRODUCTION Hélène MAINAUD DURAND, BE/ABP/SU, 09/02/2010 Status of the study CLIC pre-alignment.
Survey for SPL Dominique Missiaen BE-ABP/SU. Outline 12/11/2008 Dominique Missiaen BE-ABP-SU, Survey for SPL 2  Scope & Main Parameters  Technical Description.
CERN – ENGINEERING DEPARTMENT: A. Dallocchio on behalf of EN-MME
I. Bergevoet - Training preparation
CERN – ENGINEERING DEPARTMENT: A. Dallocchio on behalf of EN-MME
ICE SECTION The coolest place to be! Elias Métral
Grzegorz Wrochna, PIMS kick-off CERN
PH-DT Seasonal Group Meeting 21/1/14
CERN PH-DT Physics Department (PH) Detector Technologies (DT)
Geometric and Magnetic Measurements
June 22, 2017 Burkhard Schmidt for the DT coordination team
Mechanical Measurement Lab, EDMS no
Background With new accelerators delivering beams always smaller and more energetic, requirements for very precise beam alignment become more and more.
Upgrade Strategy for the Experimental Vacuum Systems
STFC Contributions to the FCC Study
MECHANICAL ENGINEERING OF ACCELERATOR COMPONENTS
Superconducting RF Crab Cavities
Explanation of the Basic Principles and Goals
Novel Accelerator and Detector Systems
Novel Laser Scanning System
Presentation transcript:

Welcome to CERN C. Paris University of Oxford / CERN Mechanical Groups Meeting 4th May 2010

Agenda of the day Welcome 1.Introduction to CERN (E.Tsesmelis) 2.Presentation of MME Group (R.Folch) 3.Presentation of Oxford University Workshop (W.Lau) 4.Discussion Lunch (GlassBox) 1.Visit of MME Workshop and Metrology 2.Visit of MME Design office C. Paris

CERN Participants Invitation (DG-DG):E. Tsesmelis EN/MME Group Leader: R.Folch Eng.& Design Office Section Leader: A.Bertarelli Assembly & Forming Section Leader:S.Mathot Mechanical Workshop Head:JM. Geisser Mechanics & Subcontracting:JM Malzacker Welding Engineer:S.Atieh Metrology laboratory: A. Cherif Organization (EN-GMS):C. Paris

Engineering Department EN-MME Group Mechanical and Materials Engineering R. Folch Edition / C. Paris

CERN Accelerator Complex ATLAS LHCb CMS ALICE

EN-MME Mandate Provide CERN-wide specific and integrated solutions combining mechanical engineering and design, production facilities and materials expertise Take over mechanical prototyping and feasibility developments for new projects Intervene rapidly in the field to repair mechanical equipments in urgent and difficult conditions Maintain and develop the CERN specialized mechanical know-how and technologies

EN-MME Structure and Organization Mechanical Engineering & Design for Colliders and Accelerators Mechanics & Subcontracting Assembly & Forming Materials & Metrology Engineering analysis and calculations Mechanical measurements Design studies and details* Precision CNC turing* and milling*, ED machining* Machine tool maintenance* Mechanical subcontracting TIG*,MIG*,Plasma* BE*, Laser* Vacuum brazing* Sheet metal forming* Materials selection, analysis and testing Metrology* and surface measurement* O. Capatina/A. Bertarelli/T.RenagliaM. PoliniS. MathotS. Sgobba Bdg. 112, 376, 10Bdg. 100, 72, 109Bdg. 100, 72, 112Bdg. 100, staff + contractor + non staff 26 staff + contractor 15 staff + contractor 10 staff + non staff Expertise provided on demand. Proposed activities are mostly integrated. Work requests are translated into a JOB form or a WORKPACKAGE agreement. Some activities are charged (*) to finance the support contract.

EN-MME Process scheme Mechanical Design and Execution

30 Jan 0910 EN-MME Main Activities & Resources Engineering and mechanical design Prototyping and special mechanical works Machining and assembly expertise Selection, test and analysis of materials Integrated project management Technology transfer, technical seminars Resources Staff members, fellows, technical students, etc. Industrial support personnel European relationship network (universities, institutes, industries, etc.)

LHC: Cryodipoles de-installation and de-cryostating, Safety reinforcements, Failure mode analysis, Repairs (flexibles, SAM, …) Linac 4: RFQ, PIMS, DTL LHC Up-grade: New Inner Triplets, Collimators Phase II CLIC: Nano-stabilization, RF Accelerating Structures, CTF3 HIE Isolde R&D: RF Cavity, Test cryostat CLOUD Experiment SPL, PS2 R&D: Nb RF Cavities Vacuum chambers, Plasma generator EN-MME Recent Activities

EN-MME Multi-disciplinarity LINAC 4 CLOUD Experimental chamber

Just brazed !

CLIC RF accelerating structures Shape accuracy 4.8 µm (15 µm nominal) Roughness Ra nm (100 nm nominal)

Engineering & Design Office process

Mechanical Workshop Equipment

Mechnical Workshop Equipment

Formage chambres PS2 Développement soufflet aluminium Générateur plasma SPL UV feedthrough CLOUD Drift-tube DTL Cavité PIMS Tank PETS Assembly and Forming examples

Metrology Equipment Contact probe machine - Ferranti - Olivetti Optical probe machine - Wegu – Mahr Portable 3D measuring arm - Romer Conventional measurement - Internal - In situ Roughness – Topography –Profile - Mechanical machine - MITUTOYO SJ 301 (Portable) - MITUTOYO FORMTRACER SV-C3100 H4 - Non contact interferometry – VEECO NT 3300 Laser – Interferometry - Machine tool calibration - Other measures (Linear measurements, straightness, flatness, squareness, …) Profile projector - BATY R770 WEGU 3D

Metallurgy Equipment Scanning Electron Microscopy - LEICA STEREOSCAN LEO (Zeiss) 430 Optical Microscopy - LEICA Q600 (Quantimet) Image Processing and Analysis - LEICA MZ 16 Stereomicroscope Mechanical Testing - UTS 200, Tensile Testing at room temp. - UTS 200, Tensile Testing at 1.9 K. - Macro Hardness testing - Micro hardness testing X-Ray Diffraction (XRD) and Siemens D-5000 Diffractometer Non-destructive Testing - Ultrasonic Test (USIP) - USN60 - USOUND (immersion) - Radiography Ultrasonic swinger device

Engineering & Design Office – Engineering analyses Residual plastic strain Transverse residual deflection 3D Fast-transient Thermo-mechanical Elastic-plastic Analysis

Mechanical Measurement Lab Equipment Sensors & Technologies - Displacement sensors (HBM, Pewatron, Sensorex) - Vibration sensors (Kistler, PCB) - Load / Tensile sensors (HPM) - Strain gauges (Vishay, HBM) - Capacitive sensors (CERN) Data acquisition system - Spectrum Analyser (Müller-BBM) - MGC Plus (HBM) - Labview – DAQ-Card Software & Post-processing - PAK Software (Müller-BBM) - ME’scope (Vibrant Technologies) - Catman AP Pro (HBM) - Labview 8.5 (NI)

THANK YOU FOR YOUR ATTENTION