Independent front-end read out subsystems for 17 detectors in three underground sites. All electronics modules of each subsystem are reside in one VME.

Slides:



Advertisements
Similar presentations
Sander Klous on behalf of the ATLAS Collaboration Real-Time May /5/20101.
Advertisements

Data Acquisition System for 2D X-Ray Detector Beijing Synchrotron Radiation Facility (BSRF) located at Institute of High Energy Physics is the first synchrotron.
Workshop Goals MICE Controls and Monitoring Workshop September 25, 2006 A. Bross.
DSP online algorithms for the ATLAS TileCal Read Out Drivers Cristobal Cuenca Almenar IFIC (University of Valencia-CSIC)
Trigger-less and reconfigurable data acquisition system for J-PET
Daya Bay Muon Subsystem Review, 7/28-29/2007, IHEP, Beijing Daya Bay RPC Gas System: Design Report & Budget Estimate Changguo Lu, Kirk McDonald Princeton.
March 2003 CHEP Online Monitoring Software Framework in the ATLAS Experiment Serguei Kolos CERN/PNPI On behalf of the ATLAS Trigger/DAQ Online Software.
LHCb readout infrastructure NA62 TDAQ WG Meeting April 1 st, 2009 Niko Neufeld, PH/LBC.
First year experience with the ATLAS online monitoring framework Alina Corso-Radu University of California Irvine on behalf of ATLAS TDAQ Collaboration.
Data Acquisition Software for CMS HCAL Testbeams Jeremiah Mans Princeton University CHEP2003 San Diego, CA.
Large Scale and Performance Tests of the ATLAS Online Software CERN ATLAS TDAQ Online Software System D.Burckhart-Chromek, I.Alexandrov, A.Amorim, E.Badescu,
D0 Run IIb Review 15-Jul-2004 Run IIb DAQ / Online status Stu Fuess Fermilab.
Hall D Trigger and Data Rates Elliott Wolin Hall D Electronics Review Jefferson Lab 23-Jul-2003.
The Application of DAQ-Middleware to the J-PARC E16 Experiment E Hamada 1, M Ikeno 1, D Kawama 2, Y Morino 1, W Nakai 3, 2, Y Obara 3, K Ozawa 1, H Sendai.
DAQ System at the 2002 ATLAS Muon Test Beam G. Avolio – Univ. della Calabria E. Pasqualucci - INFN Roma.
ATLAS ONLINE MONITORING. FINISHED! Now what? How to check quality of the data?!! DATA FLOWS!
Architecture and Dataflow Overview LHCb Data-Flow Review September 2001 Beat Jost Cern / EP.
Vladimir Frolov for Torino group. Experimental activities: The system for testing the MRPC in the Torino INFN laboratory has been fully mounted and checked;
YAN, Tian On behalf of distributed computing group Institute of High Energy Physics (IHEP), CAS, China CHEP-2015, Apr th, OIST, Okinawa.
Computer Programming How Computers Work
7 th 高能物理学会大会, 李小男, 高能物理研究所 1 大亚湾反应堆中微子实验 触发和数据获取系统 李小男, IHEP On behalf of 触发 : 清华大学 DAQ:IHEP.
ATCA based LLRF system design review DESY Control servers for ATCA based LLRF system Piotr Pucyk - DESY, Warsaw University of Technology Jaroslaw.
DAQ Issues for the 12 GeV Upgrade CODA 3. A Modest Proposal…  Replace aging technologies  Run Control  Tcl-Based DAQ components  mSQL  Hall D Requirements.
Data Acquisition for the 12 GeV Upgrade CODA 3. The good news…  There is a group dedicated to development and support of data acquisition at Jefferson.
6-10 Oct 2002GREX 2002, Pisa D. Verkindt, LAPP 1 Virgo Data Acquisition D. Verkindt, LAPP DAQ Purpose DAQ Architecture Data Acquisition examples Connection.
The Scheme of Slow Control System in BESIII Xie Xiaoxi Gao Cuishan
Management of the LHCb DAQ Network Guoming Liu * †, Niko Neufeld * * CERN, Switzerland † University of Ferrara, Italy.
Data Acquisition Backbone Core J. Adamczewski-Musch, N. Kurz, S. Linev GSI, Experiment Electronics, Data processing group.
CKM Data Source System CKM Electronics Group July 2003.
Introduction CMS database workshop 23 rd to 25 th of February 2004 Frank Glege.
Online Software 8-July-98 Commissioning Working Group DØ Workshop S. Fuess Objective: Define for you, the customers of the Online system, the products.
Overview of DAQ at CERN experiments E.Radicioni, INFN MICE Daq and Controls Workshop.
David Abbott - Jefferson Lab DAQ group Data Acquisition Development at JLAB.
DØ Online16-April-1999S. Fuess Online Computing Status DØ Collaboration Meeting 16-April-1999 Stu Fuess.
CHEP March 2003 Sarah Wheeler 1 Supervision of the ATLAS High Level Triggers Sarah Wheeler on behalf of the ATLAS Trigger/DAQ High Level Trigger.
Sep. 17, 2002BESIII Review Meeting BESIII DAQ System BESIII Review Meeting IHEP · Beijing · China Sep , 2002.
The Daya Bay Reactor Neutrino Experiment R. D. McKeown Caltech On Behalf of the Daya Bay Collaboration CIPANP 2009.
June 17th, 2002Gustaaf Brooijmans - All Experimenter's Meeting 1 DØ DAQ Status June 17th, 2002 S. Snyder (BNL), D. Chapin, M. Clements, D. Cutts, S. Mattingly.
1 EIR Nov 4-8, 2002 DAQ and Online WBS 1.3 S. Fuess, Fermilab P. Slattery, U. of Rochester.
DØ Online Workshop3-June-1999S. Fuess Online Computing Overview DØ Online Workshop 3-June-1999 Stu Fuess.
Future Reactor Neutrino Physics Soo-Bong Kim (KNRC, Seoul National University) “International Workshop on RENO-50, June 13-14, 2013”
Electronics for HPS Proposal September 20, 2010 S. Boyarinov 1 HPS DAQ Overview Sergey Boyarinov JLAB June 17, 2014.
New DAQ at H8 Speranza Falciano INFN Rome H8 Workshop 2-3 April 2001.
AFP Trigger DAQ and DCS Krzysztof Korcyl Institute of Nuclear Physics - Cracow on behalf of TDAQ and DCS subsystems.
Management of the LHCb DAQ Network Guoming Liu *†, Niko Neufeld * * CERN, Switzerland † University of Ferrara, Italy.
HPS TDAQ Review Sergey Boyarinov, Ben Raydo JLAB June 18, 2014.
SBS / A1n DAQ Alexandre Camsonne 02/27/2013. APV25 Standard VME access ok : can configure board Check address assignment in VME64X crate Need to debug.
CODA Graham Heyes Computer Center Director Data Acquisition Support group leader.
Monitoring for the ALICE O 2 Project 11 February 2016.
1 DAQ.IHEP Beijing, CAS.CHINA mail to: The Readout In BESIII DAQ Framework The BESIII DAQ system consists of the readout subsystem, the.
COMPASS DAQ Upgrade I.Konorov, A.Mann, S.Paul TU Munich M.Finger, V.Jary, T.Liska Technical University Prague April PANDA DAQ/FEE WS Игорь.
M. Caprini IFIN-HH Bucharest DAQ Control and Monitoring - A Software Component Model.
ANDREA NEGRI, INFN PAVIA – NUCLEAR SCIENCE SYMPOSIUM – ROME 20th October
ATCA based LLRF system design review DESY Control servers for ATCA based LLRF system Piotr Pucyk - DESY, Warsaw University of Technology Jaroslaw.
IRFU The ANTARES Data Acquisition System S. Anvar, F. Druillole, H. Le Provost, F. Louis, B. Vallage (CEA) ACTAR Workshop, 2008 June 10.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester June 3, 2013.
Gu Minhao, DAQ group Experimental Center of IHEP February 2011
Business System Development
SLC5 VME ROD based test system for Pixel DAQ: Outlook for Spring 2014
Enrico Gamberini, Giovanna Lehmann Miotto, Roland Sipos
Controlling a large CPU farm using industrial tools
RT2003, Montreal Niko Neufeld, CERN-EP & Univ. de Lausanne
The Software Framework available at the ATLAS ROD Crate
DAQ Architecture Design of Daya Bay Reactor Neutrino Experiment
Unit I Flash Cards Start.
TDAQ commissioning and status Stephen Hillier, on behalf of TDAQ
John Harvey CERN EP/LBC July 24, 2001
The LHCb High Level Trigger Software Framework
The Performance and Scalability of the back-end DAQ sub-system
The Trigger Control System of the CMS Level-1 Trigger
Presentation transcript:

Independent front-end read out subsystems for 17 detectors in three underground sites. All electronics modules of each subsystem are reside in one VME crate Just event building in each VME crates Design BW: 1 kHz event rate, 2MB/s per crate The Daya Bay Reactor Neutrino Experiment.  A neutrino-oscillation experiment  Measure the mixing angle θ 13 Using anti-neutrinos produced by the reactors On Daya Bay Power Plant (NPP) in Shenzhen, China. DAQ Architecture Design of Daya Bay Reactor Neutrino Experiment PDAQ-12 Fei Li ( IHEP, China)

DAQ Software Architecture Design Based on the framework of ATLAS TDAQ and BESIII DAQ, – Online software (almost reuse ATLAS) Configure, control, and monitor the DAQ system Provide services to data flow – Data flow software (ATLAS+BES+DYB) Responsible for all the processing and transportation of physics data Data Flow Software Back end Gathering and monitoring Front Read Out Online Software Data Storage Event Receive Data Read Event Pack Event Send Elec Modules Data Writer Storage Array EFIO SFO (sub farm output) ROS (read out system ) PT (processing task) EFD (event flow distributer ) Input Task Output Task Ext Task Monitor Task Memory Share EFIO ROS run on Timesys RT PowerPC

Hardware and Deployment Design Timesys RT PowerPC VME controller Blade server computer farm, X86 Daya Bay Near Lin Ao Near FAR Online computer room 9 blades 2 servers ROS*5 ROS*7 EFDs SFO*1 Partition DBN Partition LAN Partition FAR Deployment can be configurable for different experiment requirements